Bill Text: NH HB1367 | 2016 | Regular Session | Introduced
Bill Title: Relative to the public utility commission's authority to implement measures to increase the reliability, cost effectiveness, efficiency, or resiliency of the electrical grid.
Spectrum: Moderate Partisan Bill (Democrat 8-1)
Status: (Introduced - Dead) 2016-03-09 - Inexpedient to Legislate: Motion Adopted Voice Vote 03/09/2016 House Journal 23 P. 64 [HB1367 Detail]
Download: New_Hampshire-2016-HB1367-Introduced.html
HB 1367 - AS INTRODUCED
2016 SESSION
16-2549
06/10
HOUSE BILL 1367
AN ACT relative to the public utility commission's authority to implement measures to increase the reliability, cost effectiveness, efficiency, or resiliency of the electrical grid.
SPONSORS: Rep. Oxenham, Sull. 1; Rep. McConnell, Ches. 12; Rep. Gottling, Sull. 2; Rep. Cohen, Hills. 30; Rep. Snow, Hills. 42; Rep. MacKay, Merr. 14; Rep. Mangipudi, Hills. 35; Rep. Higgins, Graf. 12; Sen. Fuller Clark, Dist 21
COMMITTEE: Science, Technology and Energy
-----------------------------------------------------------------
ANALYSIS
This bill permits the public utilities commission to implement measures to increase the reliability, cost effectiveness, efficiency, or resiliency of the electrical grid.
- - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - - -
Explanation: Matter added to current law appears in bold italics.
Matter removed from current law appears [in brackets and struckthrough.]
Matter which is either (a) all new or (b) repealed and reenacted appears in regular type.
16-2549
06/10
STATE OF NEW HAMPSHIRE
In the Year of Our Lord Two Thousand Sixteen
AN ACT relative to the public utility commission's authority to implement measures to increase the reliability, cost effectiveness, efficiency, or resiliency of the electrical grid.
Be it Enacted by the Senate and House of Representatives in General Court convened:
1 Limited Electrical Energy Producers Act; Net Energy Metering; Implementation of Measures by Public Utilities Commission. Amend RSA 362-A:9, XI(a) to read as follows:
(a) Waive any of the limitations set forth in this chapter for targeted net energy metering arrangements [that are part of a utility strategy] to minimize distribution or other costs, or to implement measures designed to increase the reliability, cost effectiveness, efficiency, or overall resiliency of the electrical grid; and
2 Effective Date. This act shall take effect 60 days after its passage.