Bill Amendment: TX HB4952 | 2023-2024 | 88th Legislature
NOTE: For additional amemendments please see the Bill Drafting List
Bill Title: Relating to the reliability of the electricity supply chain.
Status: 2023-05-24 - Placed on intent calendar [HB4952 Detail]
Download: Texas-2023-HB4952-House_Amendment_H_2_1-Slawson.html
Bill Title: Relating to the reliability of the electricity supply chain.
Status: 2023-05-24 - Placed on intent calendar [HB4952 Detail]
Download: Texas-2023-HB4952-House_Amendment_H_2_1-Slawson.html
Amend CSHB 4952 (house committee report) by adding the following appropriately numbered SECTIONS to the bill and renumbering subsequent SECTIONS of the bill accordingly:
SECTION ____. Section 38.077, Utilities Code, is amended to read as follows:
Sec. 38.077. RELIABILITY [LOAD SHEDDING] EXERCISES. (a) In this section, "critical facility" means a transmission substation and any associated control centers that, if rendered inoperable or damaged because of a physical attack, could cause widespread instability, uncontrolled separation, or cascading outages within an interconnection.
(b) The commission and the independent organization certified for the ERCOT power region shall conduct simulated or tabletop load shedding exercises with providers of electric generation service and transmission and distribution service in the ERCOT power region. [(b)] The commission shall ensure that each year at least one simulated or tabletop exercise is conducted during a summer month and one simulated or tabletop exercise is conducted during a winter month.
(c) The commission and the independent organization certified for the ERCOT power region shall conduct simulated or tabletop load shedding exercises with providers of electric generation service and transmission and distribution service in the ERCOT power region to mitigate and prepare for a threat of an attack or an actual physical attack on a critical facility. The exercises required by this subsection are in addition to the exercises required by Subsection (b) and any requirements of the North American Electric Reliability Corporation Critical Infrastructure Protection plan standards. The commission and the independent organization shall conduct the exercises under this subsection at least once every two years.
(d) A simulated or tabletop load shedding exercise conducted under Subsection (c) must identify the roles and responsibilities of the following in the event of a threat of an attack or an actual physical attack on a critical facility:
(1) transmission and distribution service providers;
(2) law enforcement;
(3) the independent organization certified for the ERCOT power region; and
(4) the commission.
(e) A transmission and distribution service provider is not required to disclose the specific location of the provider's critical substations to the commission or the independent organization certified for the ERCOT power region for the purposes of a simulated or tabletop load shedding exercise conducted under Subsection (c).
SECTION ____. Not later than December 31, 2024, the commission and the independent organization certified under Section 39.151, Utilities Code, for the ERCOT power region shall conduct a simulated or tabletop load shedding exercise with each provider of electric generation service and of transmission and distribution service as required by Section 38.077(c), Utilities Code, as added by this Act.