Bill Text: TX HB1168 | 2017-2018 | 85th Legislature | Introduced
Bill Title: Relating to the mineral use of land that has been subdivided for energy development resulting in the generation of electricity.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2017-03-14 - Referred to Energy Resources [HB1168 Detail]
Download: Texas-2017-HB1168-Introduced.html
85R5032 JAM-F | ||
By: Nevárez | H.B. No. 1168 |
|
||
|
||
relating to the mineral use of land that has been subdivided for | ||
energy development resulting in the generation of electricity. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 92.002, Natural Resources Code, is | ||
amended by adding Subdivision (5) to read as follows: | ||
(5) "Qualified subdivision for energy development" | ||
means a tract of land of not more than 640 acres that: | ||
(A) has been subdivided in a manner authorized by | ||
law by the surface owners for energy development resulting in the | ||
generation of electricity by a plant or industrial facility; and | ||
(B) contains one or more operations sites within | ||
the tract and provisions for road and pipeline easements to allow | ||
use of the operations sites. | ||
SECTION 2. Section 92.003, Natural Resources Code, is | ||
amended to read as follows: | ||
Sec. 92.003. CREATION OF SUBDIVISION. The surface owners | ||
of a parcel of land may create a qualified subdivision or a | ||
qualified subdivision for energy development on the land if a plat | ||
of the subdivision has been approved by the railroad commission and | ||
filed with the clerk of the county in which the subdivision is to be | ||
located. | ||
SECTION 3. Section 92.004(a), Natural Resources Code, is | ||
amended to read as follows: | ||
(a) The railroad commission shall adopt rules governing the | ||
contents of an application for a qualified subdivision or a | ||
qualified subdivision for energy development. An application must | ||
be accompanied by a plat of the subdivision showing the applicant's | ||
proposed location of operations sites and road and pipeline | ||
easements. | ||
SECTION 4. Section 92.005, Natural Resources Code, is | ||
amended to read as follows: | ||
Sec. 92.005. USE OF OPERATIONS SITE. (a) An owner of a | ||
possessory mineral interest within a qualified subdivision or a | ||
qualified subdivision for energy development may use only the | ||
surface contained in designated operations sites for exploration, | ||
development, and production of minerals and the designated | ||
easements only as necessary to adequately use the operations sites. | ||
(b) The owner of the possessory mineral interest may drill | ||
wells or extend well bores from an operations site or from a site | ||
outside of the qualified subdivision or qualified subdivision for | ||
energy development under the surface of other parts of the | ||
qualified subdivision or qualified subdivision for energy | ||
development if the operations do not unreasonably interfere with | ||
the use of the surface of the qualified subdivision or qualified | ||
subdivision for energy development outside the operations site. | ||
(c) This section ceases to apply to a qualified subdivision | ||
if, by the third anniversary of the date on which the order of the | ||
commission becomes final: | ||
(1) the surface owner has not commenced actual | ||
construction of roads or utilities within the qualified | ||
subdivision; and | ||
(2) a lot within the qualified subdivision has not | ||
been sold to a third party. | ||
(d) This section ceases to apply to a qualified subdivision | ||
for energy development if, by the third anniversary of the date on | ||
which the order of the commission becomes final, the surface owner | ||
has not commenced actual construction of roads or facilities for | ||
use in generating electricity within the qualified subdivision for | ||
energy development. | ||
SECTION 5. Section 92.006, Natural Resources Code, is | ||
amended to read as follows: | ||
Sec. 92.006. AMENDMENT, REPLAT, OR ABANDONMENT. All or any | ||
portion of a qualified subdivision or qualified subdivision for | ||
energy development may be amended, replatted, or abandoned by the | ||
surface owner. An amendment or replat, however, may not alter, | ||
diminish, or impair the usefulness of an operations site or | ||
appurtenant road or pipeline easement unless the amendment or | ||
replat is approved by the commission in accordance with Section | ||
92.003 [ |
||
SECTION 6. Not later than January 1, 2018, the Railroad | ||
Commission of Texas shall adopt rules necessary to implement | ||
Chapter 92, Natural Resources Code, as amended by this Act. | ||
SECTION 7. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2017. |