Bill Text: TX HB1584 | 2025-2026 | 89th Legislature | Introduced
Bill Title: Relating to the creation of a list of priority facilities by electric utilities.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced) 2024-12-11 - Filed [HB1584 Detail]
Download: Texas-2025-HB1584-Introduced.html
89R5146 SCR-D | ||
By: Hull | H.B. No. 1584 |
|
||
|
||
relating to the creation of a list of priority facilities by | ||
electric utilities. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter D, Chapter 38, Utilities Code, is | ||
amended by adding Section 38.0725 to read as follows: | ||
Sec. 38.0725. LIST OF PRIORITY FACILITIES. (a) In this | ||
section, "priority facility" means: | ||
(1) a facility listed in Section 38.072(b); or | ||
(2) a facility for which electric service is | ||
considered crucial for the protection or maintenance of public | ||
safety. | ||
(b) The commission by rule shall adopt criteria for | ||
determining whether a facility is a facility for which electric | ||
service is considered crucial for the protection or maintenance of | ||
public safety under Subsection (a)(2). The criteria must | ||
automatically include the following types of facilities: | ||
hospitals, police stations, fire stations, and critical water and | ||
wastewater facilities. | ||
(c) An electric utility shall maintain a list of priority | ||
facilities in the utility's service area. | ||
(d) An electric utility shall provide on the utility's | ||
Internet website a mechanism for a facility to request that the | ||
utility add the facility to the priority facility list. The | ||
electric utility shall add the requested facility to the list only | ||
if the facility is a priority facility according to the criteria | ||
adopted by the commission under Subsection (b). | ||
(e) On request from a facility, an electric utility shall | ||
disclose to the facility not later than the 14th day after the date | ||
of the request whether the facility is on the priority facility | ||
list. | ||
(f) On a declaration of a natural disaster or other | ||
emergency by the governor affecting the service area of the | ||
electric utility, the utility shall provide the list of priority | ||
facilities to each applicable local emergency management agency. | ||
SECTION 2. This Act takes effect September 1, 2025. |