Bill Text: TX HB1584 | 2025-2026 | 89th Legislature | Introduced


Bill Title: Relating to the creation of a list of priority facilities by electric utilities.

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced) 2024-12-11 - Filed [HB1584 Detail]

Download: Texas-2025-HB1584-Introduced.html
  89R5146 SCR-D
 
  By: Hull H.B. No. 1584
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the creation of a list of priority facilities by
  electric utilities.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter D, Chapter 38, Utilities Code, is
  amended by adding Section 38.0725 to read as follows:
         Sec. 38.0725.  LIST OF PRIORITY FACILITIES. (a)  In this
  section, "priority facility" means:
               (1)  a facility listed in Section 38.072(b); or 
               (2)  a facility for which electric service is
  considered crucial for the protection or maintenance of public
  safety.
         (b)  The commission by rule shall adopt criteria for
  determining whether a facility is a facility for which electric
  service is considered crucial for the protection or maintenance of
  public safety under Subsection (a)(2).  The criteria must
  automatically include the following types of facilities:
  hospitals, police stations, fire stations, and critical water and
  wastewater facilities.
         (c)  An electric utility shall maintain a list of priority
  facilities in the utility's service area.
         (d)  An electric utility shall provide on the utility's
  Internet website a mechanism for a facility to request that the
  utility add the facility to the priority facility list.  The
  electric utility shall add the requested facility to the list only
  if the facility is a priority facility according to the criteria
  adopted by the commission under Subsection (b).
         (e)  On request from a facility, an electric utility shall
  disclose to the facility not later than the 14th day after the date
  of the request whether the facility is on the priority facility
  list.
         (f)  On a declaration of a natural disaster or other
  emergency by the governor affecting the service area of the
  electric utility, the utility shall provide the list of priority
  facilities to each applicable local emergency management agency.
         SECTION 2.  This Act takes effect September 1, 2025.
feedback