H.B. No. 2555 |
|
||
relating to transmission and distribution system resiliency | ||
planning by and cost recovery for electric utilities. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. The legislature finds that: | ||
(1) extreme weather conditions, including high winds, | ||
lightning, flooding, and freezes, can cause extraordinary damage to | ||
electrical transmission and distribution facilities, resulting in | ||
power outages; | ||
(2) it is in the state's interest to promote the use of | ||
resiliency measures to enable electrical transmission and | ||
distribution infrastructure to withstand extreme weather | ||
conditions, including hardening electrical transmission and | ||
distribution facilities, undergrounding certain electrical | ||
distribution lines, lightning mitigation measures, flood | ||
mitigation measures, information technology, cybersecurity | ||
measures, physical security measures, vegetation management, and | ||
wildfire mitigation and response; | ||
(3) protecting electrical transmission and | ||
distribution infrastructure from extreme weather conditions can | ||
effectively reduce system restoration costs to and outage times for | ||
customers and improve system resiliency and overall service | ||
reliability for customers; | ||
(4) it is in the state's interest for each electric | ||
utility to seek to mitigate system restoration costs to and outage | ||
times for customers when developing plans to enhance electrical | ||
transmission and distribution infrastructure storm resiliency; and | ||
(5) all customers benefit from reduced system | ||
restoration costs. | ||
SECTION 2. Subchapter D, Chapter 38, Utilities Code, is | ||
amended by adding Section 38.078 to read as follows: | ||
Sec. 38.078. TRANSMISSION AND DISTRIBUTION SYSTEM | ||
RESILIENCY PLAN AND COST RECOVERY. (a) In this section, "plan" | ||
means a transmission and distribution system resiliency plan | ||
described by Subsection (b). | ||
(b) An electric utility may file, in a manner authorized by | ||
commission rule, a plan to enhance the resiliency of the utility's | ||
transmission and distribution system through at least one of the | ||
following methods: | ||
(1) hardening electrical transmission and | ||
distribution facilities; | ||
(2) modernizing electrical transmission and | ||
distribution facilities; | ||
(3) undergrounding certain electrical distribution | ||
lines; | ||
(4) lightning mitigation measures; | ||
(5) flood mitigation measures; | ||
(6) information technology; | ||
(7) cybersecurity measures; | ||
(8) physical security measures; | ||
(9) vegetation management; or | ||
(10) wildfire mitigation and response. | ||
(c) A plan must explain the systematic approach the electric | ||
utility will use to carry out the plan during at least a three-year | ||
period. | ||
(d) In determining whether to approve a plan filed under | ||
this section, the commission shall consider: | ||
(1) the extent to which the plan is expected to enhance | ||
system resiliency, including whether the plan prioritizes areas of | ||
lower performance; and | ||
(2) the estimated costs of implementing the measures | ||
proposed in the plan. | ||
(e) The commission shall issue an order to approve, modify, | ||
or deny a plan filed under Subsection (b) and any associated rider | ||
described by Subsection (i) not later than the 180th day after the | ||
plan is filed with the commission. The commission may approve a | ||
plan only if the commission determines that approving the plan is in | ||
the public interest. | ||
(f) For a plan approved by the commission, with or without | ||
modification, an electric utility may request a good cause | ||
exception on implementing all or some of the measures in the plan if | ||
operational needs, business needs, financial conditions, or supply | ||
chain or labor conditions dictate the exception. The commission's | ||
denial of a plan is not considered to be a finding of the prudence or | ||
imprudence of a measure or cost in the plan for the purposes of | ||
Chapter 36 or this chapter. | ||
(g) An electric utility for which the commission has | ||
approved a plan under this section may request that the commission | ||
review an updated plan submitted by the electric utility. The | ||
updated plan must comply with any applicable commission rules and | ||
take effect on a date that is not earlier than the third anniversary | ||
of the approval date of the utility's most recently approved plan. | ||
The commission shall review and approve, modify, or deny the | ||
updated plan in the manner provided by Subsections (d), (e), and | ||
(f). | ||
(h) An electric utility's implementation of a plan approved | ||
under this section may be reviewed for the purposes of Chapter 36 or | ||
this chapter. If the commission determines that the costs to | ||
implement an approved plan were imprudently incurred or otherwise | ||
unreasonable, those costs are subject to disallowance. | ||
(i) Notwithstanding any other law, an electric utility may | ||
file with a plan an application for a rider to recover the electric | ||
utility's distribution investment that is made to implement a plan | ||
and is used and useful to the electric utility in providing service | ||
to the public. The electric utility may file the application before | ||
the electric utility places into service the distribution | ||
investment to implement an approved plan. The commission may | ||
approve the rider application before the electric utility places | ||
into service the distribution investment to implement an approved | ||
plan. The commission may not approve a rider that would allow an | ||
electric utility to begin recovering the distribution investment | ||
before the utility begins to use the investment to provide service | ||
to the public. If the commission approves or modifies the plan, the | ||
commission shall determine the appropriate terms of the rider in | ||
the approval order. The commission shall adopt a procedure for | ||
reconciliation of an electric utility's distribution-related costs | ||
to implement an approved plan. | ||
(j) As part of a review described by Subsection (g), the | ||
commission shall reconcile the rider authorized under Subsection | ||
(i) to determine the electric utility's reasonably and prudently | ||
incurred plan costs. | ||
(k) If an electric utility that files a plan with the | ||
commission does not apply for a rider under Subsection (i), after | ||
commission review, the utility may defer all or a portion of the | ||
distribution-related costs relating to the implementation of the | ||
plan for future recovery as a regulatory asset, including | ||
depreciation expense and carrying costs at the utility's weighted | ||
average cost of capital established in the commission's final order | ||
in the utility's most recent base rate proceeding in a manner | ||
consistent with Chapter 36, and use commission authorized cost | ||
recovery alternatives under Sections 36.209 and 36.210 or another | ||
general rate proceeding. | ||
(l) Plan costs considered by the commission to be reasonable | ||
and prudent may include only incremental costs that are not already | ||
being recovered through the electric utility's base rates or any | ||
other rate rider and must be allocated to customer classes pursuant | ||
to the rate design most recently approved by the commission. | ||
SECTION 3. The Public Utility Commission of Texas shall | ||
adopt rules to implement Section 38.078, Utilities Code, as added | ||
by this Act, not later than the 180th day after the effective date | ||
of this Act. | ||
SECTION 4. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2023. | ||
______________________________ | ______________________________ | |
President of the Senate | Speaker of the House | |
I certify that H.B. No. 2555 was passed by the House on April | ||
28, 2023, by the following vote: Yeas 147, Nays 0, 1 present, not | ||
voting; and that the House concurred in Senate amendments to H.B. | ||
No. 2555 on May 25, 2023, by the following vote: Yeas 134, Nays 7, | ||
2 present, not voting. | ||
______________________________ | ||
Chief Clerk of the House | ||
I certify that H.B. No. 2555 was passed by the Senate, with | ||
amendments, on May 17, 2023, by the following vote: Yeas 29, Nays | ||
2. | ||
______________________________ | ||
Secretary of the Senate | ||
APPROVED: __________________ | ||
Date | ||
__________________ | ||
Governor |