Bill Text: TX HB3090 | 2021-2022 | 87th Legislature | Introduced
Bill Title: Relating to the required procurement of an alternative power supply for certain power generation facilities.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2021-03-19 - Referred to State Affairs [HB3090 Detail]
Download: Texas-2021-HB3090-Introduced.html
87R11891 BRG-D | ||
By: Vasut | H.B. No. 3090 |
|
||
|
||
relating to the required procurement of an alternative power supply | ||
for certain power generation facilities. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter A, Chapter 35, Utilities Code, is | ||
amended by adding Section 35.0021 to read as follows: | ||
Sec. 35.0021. ALTERNATIVE POWER SUPPLY FOR INTERMITTENT | ||
POWER GENERATION FACILITIES. (a) In this section, "intermittent | ||
power generation facility" means a power generation facility with a | ||
power output that, in the course of the facility's ordinary and | ||
proper operation, cannot be predicted, controlled, or varied at | ||
will. The term includes a solar or wind generation facility. | ||
(b) An intermittent power generation facility, the | ||
construction of which began after September 1, 2021, may not | ||
operate in this state unless the owner of the facility certifies to | ||
the commission that, in the event of a power output disruption at | ||
the facility: | ||
(1) the owner can supply or has a contract that | ||
guarantees the supply of not less than 50 percent of the facility's | ||
average output over a 48-hour period; and | ||
(2) the owner's additional or contracted power supply | ||
comes from: | ||
(A) a power generation facility with a power | ||
output that, in the course of the facility's ordinary and proper | ||
operation, can be predicted, controlled, or varied at will, | ||
including a hydroelectric, biomass, natural gas, coal, or nuclear | ||
generation facility; or | ||
(B) an electric energy storage facility. | ||
SECTION 2. This Act takes effect September 1, 2021. |