Bill Text: TX HB3460 | 2011-2012 | 82nd Legislature | Introduced


Bill Title: Relating to the filing with the state of well logs by operators of oil-related or gas-related wells; providing a penalty.

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced - Dead) 2011-04-06 - Left pending in committee [HB3460 Detail]

Download: Texas-2011-HB3460-Introduced.html
 
 
  By: Crownover H.B. No. 3460
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to the filing with the state of well logs by operators of
  oil-related or gas-related wells; providing a penalty.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  The heading to Subchapter M, Chapter 91, Natural
  Resources Code, SUBCHAPTER M. is amended to read as follows:
  SUBCHAPTER M. WELL [ELECTRIC] LOGS
         SECTION 2.  Natural Resources Code, Sections 91.551(a)(1)
  and (2) are amended to read as follows:
               (1)  "Well" means a well drilled for any purpose
  related to exploration for or production or storage of oil or gas or
  both oil and gas, including a well drilled for injection of fluids
  to enhance hydrocarbon recovery, disposal of produced fluids,
  disposal of waste from exploration or production activity, or brine
  mining. The term includes a well that is completed as a dry hole.
               (2)  "Well [Electric] log" means a wireline-conveyed or
  drill pipe-conveyed survey recorded in an open borehole using
  electric or radioactive technologies for the purpose of obtaining
  geological or geophysical information or other information
  regarding the properties of a reservoir or of the rocks penetrated
  by the well. The term includes and is limited to a:
                     (A)  spontaneous potential log;
                     (B)  induction log;
                     (C)  borehole compensated sonic log;
                     (D)  dual lateral log;
                     (E)  density log;
                     (F)  gamma ray log; or
                     (G)  compensated neutron log [wireline survey,
  except dipmeter surveys and seismic wireline surveys, run in an
  open hole or a cased hole of a well for purposes of obtaining
  geological information].
         SECTION 3.  Natural Resources Code, Section 91.552, is
  amended to read as follows:
         Sec. 91.552.  WELL [ELECTRIC] LOGS REQUIRED TO BE FILED;
  CRITERIA.  (a)  Except as otherwise provided by this subchapter, not
  later than the 90th day after the date a drilling operation is
  completed, the operator shall file with the commission a copy of
  each well log, including each borehole section of the log at all
  depths, [a basic electric log] run after September 1, 2011 
  [September 1, 1985], in conjunction with the drilling or deepening
  of the well that meets basic criteria established by the
  commission.  Each well log shall include each borehole section of
  the log at all depths. Each well log shall be filed with the
  commission electronically in a manner acceptable to the commission
  provided the commission has the technological capability to receive
  the electronic filing.
         (b)  The commission by rule shall establish criteria for well
  [basic electric] logs to be filed with the commission.
         (c)  Not later than the deadline prescribed by Subsection (a)
  for the filing of each well log, an operator shall file with the
  commission a copy of a cased hole log run after September 1, 2011,
  in conjunction with the drilling or deepening of a well in lieu of a
  well log run after that date if:
               (1)  a cased hole log was run; and
               (2)  a well log was not run.
         (d)  Nothing in this subchapter requires an operator to run a
  well log in conjunction with the drilling or deepening of a well.
         SECTION 4.  Natural Resources Code, Section 91.553, is
  amended to read as follows:
         Sec. 91.553.  AVAILABILITY OF WELL [ELECTRIC] LOGS.  (a)  
  Except as specifically provided by this section, each well
  [electric] log filed with the commission under this subchapter is
  not confidential and is public information under Chapter 552,
  Government Code.
         (b)  Not later than the date by which a well [an electric] log
  is required to be filed with the commission under Section 91.552,
  the operator may file a written request (Form L-1) with the
  commission asking that the well [electric] log remain confidential
  and not be made available as public information.  On filing this
  request, the commission will hold confidential the well [electric]
  log or copy of the well [electric] log required to be filed with the
  commission [may be retained by the operator, and the electric log
  may remain in the possession of the operator] for the period of
  confidentiality.  On filing of the request for confidentiality, the
  well [electric] log becomes confidential and remains confidential
  for a period of three years [one year] after the date that the
  drilling operation was completed on an on-shore well and five years
  after the date that the drilling operation was completed on an
  offshore well.
         [(c)  If an electric log is made confidential under
  Subsection (b), the operator is entitled to have the period of
  confidentiality extended once for an additional period of two
  years.  The commission shall grant the two-year extension on
  written request of the operator.  The written request must be made
  to the commission before the one-year period of confidentiality
  under (b) expires.
         [(d)  If an electric log is made confidential under (b) and
  the log was run in a well drilled on land submerged in state water,
  the operator is entitled to have the period of confidentiality
  extended for not more than two additional periods of two years each.  
  The commission shall grant the extension or extensions on written
  request of the operator.  The written request must be made to the
  commission before the expiration of the one-year period of
  confidentiality under (b) or the expiration of the first extension
  granted under this subsection.
         [(e)  An operator required to file an electric log under this
  section who has held the log during a period of confidentiality or
  any extensions of that period shall file the log with the commission
  within 30 days after the conclusion of the period of
  confidentiality or the period of the last extension.]
         (f)  An operator who fails to timely file with the commission
  a written request under Subsection (b) that a well [an electric] log
  remain confidential and not be made available as public information
  shall file the log with the commission immediately after the
  conclusion of the period for filing the request.
         SECTION 5.  Natural Resources Code, Section 91.554, is
  amended to read as follows:
         Sec. 91.554.  AVAILABILITY OF CONFIDENTIAL WELL [ELECTRIC]
  LOGS. If the commission requires a well [an electric] log to be
  available [filed] before the expiration of a period of
  confidentiality, the commission shall make that well [electric] log
  available for inspection during the period of confidentiality only
  to:
               (1)  a person authorized in writing by the operator;
  and
               (2)  members of the commission and its employees in the
  exercise of their powers and duties under this code.
         SECTION 6.  Natural Resources Code, Section 91.555, is
  amended to read as follows:
         Sec. 91.555.  MANAGEMENT AND STORAGE OF WELL [ELECTRIC]
  LOGS.  The commission may contract with any person for the
  management and storage of the well [electric] logs filed with the
  commission.
         SECTION 7.  Natural Resources Code, Section 91.556, is
  amended to read as follows:
         Sec. 91.556.  ENFORCEMENT [DENIAL OF ALLOWABLE].  If an
  operator fails to file a well [an electric] log as required by this
  subchapter, the commission may:
               (1)  if the well is completed as a producing well,
  refuse to assign an allowable or a change in allowable for
  production from the well [for which the electric log is required]
  until the operator files the well [electric] log with the
  commission; or
               (2)  impose an administrative penalty on the operator
  in the manner provided by Sections 81.0531-81.0534 in an amount not
  to exceed $5,000 for each well for which the operator failed to file
  a well log.
         SECTION 8.  Government Code, Section 552.113(a) is amended
  to read as follows:
         Sec. 522.113(a) Information is excepted from the
  requirements of Section 552.021 if it is:
               (1)  a well [an electric] log confidential under
  Subchapter M, Chapter 91, Natural Resources Code;
               (2)  geological or geophysical information or data,
  including maps concerning wells, except information filed in
  connection with an application or proceeding before an agency; or
               (3)  confidential under Subsections (c) through (f).
         SECTION 9.  Amends Government Code, Section 552.113(c)(2):
               (2)  "Well ["Basic electric] logs" has the same meaning
  as it has in Chapter 91, Natural Resources Code.
         SECTION 10.  Amends Gov Code, Sections 552.113(d), (e), and
  (f):
         (d)  Confidential material, except well [basic electric]
  logs, filed in the General Land Office on or after September 1,
  1985, is public information and is available to the public under
  Section 552.021 on and after the later of:
               (1)  five years from the filing date of the
  confidential material; or
               (2)  one year from the expiration, termination, or
  forfeiture of the lease in connection with which the confidential
  material was filed.
         (e)  Well [Basic electric] logs filed in the General Land
  Office on or after September 1, 1985, are either public information
  or confidential material to the same extent and for the same periods
  provided for the same logs by Chapter 91, Natural Resources Code. A
  person may request that a well [basic electric] log that has been
  filed in the General Land Office be made confidential by filing with
  the General Land Office a copy of the written request for
  confidentiality made to the commission for the same log.
         (f)  The following are public information:
               (1)  well [basic electric] logs filed in the General
  Land Office before September 1, 1985; and
               (2)  confidential material, except well [basic
  electric] logs, filed in the General Land Office before September
  1, 1985, provided, that Subsection (d) governs the disclosure of
  that confidential material filed in connection with a lease that is
  a valid and subsisting lease on September 1, 1995.
         SECTION 11.  The changes in law made by this Act apply only
  to a drilling operation that is completed on or after the effective
  date of this Act. A drilling operation that is completed before the
  effective date of this Act is subject to the law in effect on the
  date of completion, and that law is continued in effect for that
  purpose.
         SECTION 12.  This Act takes effect September 1, 2011.
feedback