Bill Text: TX HB3582 | 2013-2014 | 83rd Legislature | Introduced
Bill Title: Relating to emission and water reduction in permitted generation facilities.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2013-04-16 - Left pending in committee [HB3582 Detail]
Download: Texas-2013-HB3582-Introduced.html
By: Strama | H.B. No. 3582 |
|
||
|
||
relating to emission and water reduction in permitted generation | ||
facilities. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 382.003, Health and Safety Code, is | ||
amended by adding (1-b) to read as follows: | ||
(1-b) "Emission and Water Reduction Project" means a | ||
project in which a generation facility has a valid permit under this | ||
chapter and which applies for a modified permit under this chapter | ||
before January 1, 2020, in order to achieve: | ||
(A) a 50% reduction in the annual average | ||
emission rate for nitrogen oxides; | ||
(B) a 25% reduction in the rate of water | ||
consumption; and | ||
(C) to maintain or exceed the previous rated | ||
capacity of the facility. | ||
SECTION 2. The Health and Safety Code is amended by adding | ||
Chapter 395 to read as follows: | ||
CHAPTER 395. EMISSION AND WATER REDUCTION INITIATIVE FOR | ||
PERMITTED GENERATION FACILITIES | ||
SUBCHAPTER A. GENERAL PROVISIONS | ||
Sec. 395.001. DEFINITIONS. In this chapter: | ||
(1) "Best available control technology" has the | ||
meaning assigned by Section 169 of the federal Clean Air Act (42 | ||
U.S.C. Section 7479(3)). | ||
(2) "Commission" means the Texas Commission on | ||
Environmental Quality. | ||
(3) "Facility" has the meaning assigned by Section | ||
382.003. | ||
(4) "Incremental cost" has the meaning assigned by | ||
Section 386.001. | ||
(5) "New technology" means emissions control | ||
technology that results in emissions reductions that exceed state | ||
or federal requirements in effect at the time of submission of a new | ||
technology implementation grant application. | ||
(6) "Stationary source" has the meaning assigned by | ||
Section 302 of the federal Clean Air Act (42 U.S.C. Section | ||
7602(z)). | ||
Sec. 395.002. EMISSION AND WATER REDUCTION INITIATIVE. (a) | ||
The commission shall establish and administer an emission and water | ||
reduction initiative to assist with the re-powering of electric | ||
generation facilities as a means of reducing emissions and water | ||
consumption in this state. Under the initiative, the commission | ||
shall provide loan guarantees or other financial incentives for | ||
eligible projects to facilitate the re-powering and modification | ||
needed to reduce emissions and water consumption. | ||
(b) Emission and Water Reduction Projects as defined by | ||
Section 382.003 may be considered eligible projects. | ||
Sec. 395.003. GUIDELINES AND CRITERIA. (a) The commission | ||
shall adopt loan guaranty guidelines and criteria consistent with | ||
the requirements of this chapter. | ||
(b) The guidelines must include: | ||
(1) protocols to compute projected emissions and water | ||
reductions; | ||
(2) safeguards to ensure that the projects funded | ||
result in emissions reductions not otherwise required by state or | ||
federal law; | ||
(3) rules to establish loan guarantees not to exceed | ||
85% of the direct cost of the project with the total cost of | ||
installed capacity not to exceed $1000 per KW; and | ||
(4) rules to ensure the loan guaranty will expire upon | ||
the earlier of: | ||
(A) three years after the Public Utility | ||
Commission implements a forward capacity market; or | ||
(B) the loan to value of the clean energy project | ||
falls at or below 50%; or | ||
(C) 18 years from the date of approval. | ||
(c) The commission may propose revisions to the guidelines | ||
and criteria adopted under this section as necessary to improve the | ||
ability of the initiative to achieve the its goals. | ||
(d) The commission may adopt emergency rules under Section | ||
2001.034, Government Code, with abbreviated notice, to carry out | ||
any rulemaking necessary to implement this chapter. | ||
(e) Except as provided by Subsection (d), the rulemaking | ||
requirements of Chapter 2001, Government Code, do not apply to the | ||
adoption or revision of guidelines and criteria under this section. | ||
Sec. 395.004. AVAILABILITY OF EMISSIONS REDUCTION CREDITS | ||
IN CERTAIN NONATTAINMENT AREAS. A project funded under this | ||
chapter must comply with Sections 386.055 and 386.056, as | ||
applicable. | ||
SUBCHAPTER B. INITIATIVE APPLICATIONS AND REVIEW | ||
Sec. 395.101. APPLICATION FOR LOAN GUARANTY. (a) The owner | ||
of a facility located in this state may apply for a loan guaranty | ||
under the initiative established under Section 395.002. To improve | ||
the ability of the initiative to achieve its goals, the commission | ||
may adopt guidelines to allow a person other than the owner to apply | ||
for and receive a loan guaranty. | ||
(b) An application for a loan guaranty under this chapter | ||
must be made on a form provided by the commission and must contain | ||
information required by the commission, including: | ||
(1) a detailed description of the proposed project; | ||
(2) information necessary for the commission to | ||
determine whether the project meets the commission's eligibility | ||
requirements, including a statement of the amounts of any other | ||
public financial assistance the project will receive; and | ||
(3) other information the commission may require. | ||
Sec. 395.102. LOAN GUARANTY APPLICATION REVIEW PROCEDURES. | ||
(a) The commission shall review an application for a loan guaranty | ||
for a project authorized under this chapter according to dates | ||
specified in a request for grant applications. If the commission | ||
determines that an application is incomplete, the commission shall | ||
notify the applicant and provide an explanation of the information | ||
missing from the application. The commission shall evaluate the | ||
completed application according to the guidelines and criteria | ||
adopted under Section 395.003. | ||
(b) To the extent possible, the commission shall coordinate | ||
project review and approval with any timing constraints related to | ||
project purchases or installations to be made by an applicant. | ||
(c) The commission may deny a loan guaranty application for | ||
a project that does not meet the applicable criteria or that the | ||
commission determines is not made in good faith, is not credible, or | ||
is not in compliance with this chapter or the goals of this chapter. | ||
(d) Subject to the availability of funding, the commission | ||
shall award a loan guaranty under this chapter in conjunction with | ||
the execution of a contract that obligates the commission to make | ||
the loan guaranty and the recipient to perform the actions | ||
described by the recipient's application. | ||
Sec. 395.103. EVIDENCE OF EMISSIONS REDUCTION POTENTIAL | ||
REQUIRED. (a) An application for a emissions and water reduction | ||
project under this chapter must show reasonable evidence that the | ||
proposed project is capable of providing a significant reduction in | ||
emissions and water consumption. | ||
(b) The commission shall consider specifically, for each | ||
application: | ||
(1) the projected potential for reduced emissions; and | ||
(2) the projected potential for reduced water | ||
consumption | ||
Sec. 395.104. REPORTING REQUIREMENTS. The commission | ||
annually shall prepare a report that summarizes the applications | ||
received and loan guarantees awarded in the preceding year. | ||
SUBCHAPTER C. PROJECT REQUIREMENTS | ||
Sec. 391.201. ELIGIBILITY OF PROJECTS FOR LOAN GUARANTEES. | ||
(a) The commission shall establish criteria for prioritizing | ||
projects eligible to receive loan guarantees under this chapter. | ||
The commission shall review and may modify the criteria and | ||
priorities as appropriate. | ||
(b) A proposed project must meet the requirements of this | ||
section to be eligible for a loan guarantee under the initiative | ||
established under Section 391.002. | ||
(d) An emissions and water reduction project must document, | ||
in a manner acceptable to the commission, an achieved reduction | ||
from the baseline emissions adopted by the commission for the | ||
relevant facility or stationary source. | ||
(e) If a baseline emissions standard does not exist for a | ||
facility, the commission, for purposes of this subchapter, shall | ||
adopt an appropriate baseline emissions level for comparison | ||
purposes. | ||
(f) An emissions and water reduction project must document, | ||
in a manner acceptable to the commission, an achieved reduction in | ||
water consumption. Planned water usage for proposed projects must | ||
be consistent with the state water plan. | ||
(g) Upon completion of the project, the installed capacity | ||
must meet or exceed the previous rated capacity of the facility. | ||
Sec. 395.203. DETERMINATION OF LOAN GUARANTY AMOUNT AND | ||
DURATION OF LOAN GUARANTY. | ||
(a) The commission may not award a loan guaranty that, net | ||
of taxes, exceeds 85% of the project cost with the total project | ||
cost not to exceed $1000 per KW of installed capacity. | ||
(b) The loan guaranty will expire upon the earlier of : | ||
(1) 18 years from the date of approval; | ||
(2) three years after the Public Utility Commission | ||
implements a forward capacity market; or | ||
(3) at any such time that the loan to value of the | ||
emission and water reduction project falls at or below 50%. | ||
Sec. 395.205. PREFERENCES. (a) On awarding grants under | ||
this chapter the commission shall give preference to projects that | ||
are located in non-attainment or near non-attainment areas of | ||
Texas. | ||
SUBCHAPTER D. FUNDING; EXPIRATION | ||
Sec. 395.302. COMPTROLLER REVIEW OF USE OF GRANT FUNDS. (a) | ||
The comptroller annually shall conduct a review of each recipient | ||
of a emission and water reduction project loan guaranty under this | ||
chapter to ensure that the recipient's use of the loan complies with | ||
state law and the terms of the award. | ||
(b) To assist with a review under this section, the | ||
commission shall provide the comptroller with all monitoring | ||
reports received from loan guaranty recipients and any other | ||
documentation requested by the comptroller. | ||
(c) On a finding of any misuse of loan money or other | ||
noncompliance with grant requirements, the comptroller shall | ||
provide a report to the commission with recommendations for | ||
subsequent action. | ||
(d) The comptroller shall notify the Commission and the | ||
applicant when the loan to value of the emission and water reduction | ||
project falls at or below %50 and the loan guarantee is withdrawn. | ||
(d) The comptroller may adopt rules to implement this | ||
section. | ||
Sec. 391.304. EXPIRATION. This chapter expires August 31, | ||
2019. | ||
SECTION 3: This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2013. |