Bill Text: TX HB3764 | 2017-2018 | 85th Legislature | Introduced
Bill Title: Relating to the cessation of tolls on certain toll projects and the disposition of money appropriated for those projects.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2017-03-31 - Referred to Transportation [HB3764 Detail]
Download: Texas-2017-HB3764-Introduced.html
By: Pickett | H.B. No. 3764 |
|
||
|
||
relating to the cessation of tolls on certain toll projects and the | ||
disposition of money appropriated for those projects. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter E, Chapter 228, Transportation Code, | ||
is amended by adding Section 228.207 to read as follows: | ||
Sec. 228.207. CÉSAR CHÁVEZ BORDER HIGHWAY. (a) The | ||
Department may not operate, either directly or through an agreement | ||
with another entity, any portion of Loop 375 in El Paso County | ||
between Interstate Highway 10 and Santa Fe Street as a toll project. | ||
(b) The Department shall maintain the highway described by | ||
Subsection (a) as part of the state highway system without tolls. | ||
(c) Any outstanding balances of funds owed to the Department | ||
for César Chávez Freeway shall be transferred and added to the | ||
obligation on the Loop 375 Border Highway West Project in El Paso | ||
County from Race Track Drive to U.S. Highway 54, or any other terms | ||
agreeable to the Department. | ||
SECTION 2. This Act takes effect September 1, 2017. |