Bill Text: TX HB720 | 2019-2020 | 86th Legislature | Enrolled
Bill Title: Relating to appropriations of water for recharge of aquifers and use in aquifer storage and recovery projects.
Spectrum: Partisan Bill (Republican 2-0)
Status: (Passed) 2019-06-10 - Effective immediately [HB720 Detail]
Download: Texas-2019-HB720-Enrolled.html
H.B. No. 720 |
|
||
relating to appropriations of water for recharge of aquifers and | ||
use in aquifer storage and recovery projects. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Sections 11.023(a) and (d), Water Code, are | ||
amended to read as follows: | ||
(a) To the extent that state water has not been set aside by | ||
the commission under Section 11.1471(a)(2) to meet downstream | ||
instream flow needs or freshwater inflow needs, state water may be | ||
appropriated, stored, or diverted for: | ||
(1) domestic and municipal uses, including water for | ||
sustaining human life and the life of domestic animals; | ||
(2) agricultural uses and industrial uses, meaning | ||
processes designed to convert materials of a lower order of value | ||
into forms having greater usability and commercial value, including | ||
the development of power by means other than hydroelectric; | ||
(3) mining and recovery of minerals; | ||
(4) hydroelectric power; | ||
(5) navigation; | ||
(6) recreation and pleasure; | ||
(7) public parks; [ |
||
(8) game preserves; and | ||
(9) recharge into an aquifer underlying this state | ||
other than an aquifer described under Subsection (c) through | ||
surface infiltration or an aquifer recharge project as defined by | ||
Section 27.201. | ||
(d) When it is put or allowed to sink into the ground, water | ||
appropriated under Subsections (a)(9) and [ |
||
|
||
water, storm water, or floodwater and is considered percolating | ||
groundwater. | ||
SECTION 2. Subchapter D, Chapter 11, Water Code, is amended | ||
by adding Sections 11.157 and 11.158 to read as follows: | ||
Sec. 11.157. WATER FOR USE AS AQUIFER RECHARGE OR IN AN | ||
AQUIFER STORAGE AND RECOVERY PROJECT. (a) Unappropriated water, | ||
including storm water and floodwater, may be appropriated for | ||
recharge into an aquifer underlying this state, including an | ||
aquifer recharge project as defined by Section 27.201. Water | ||
appropriated for diversion and a beneficial use may be stored in an | ||
aquifer storage and recovery project, as defined by Section 27.151, | ||
before the water is recovered for that beneficial use. | ||
(b) The commission may authorize the appropriation of water | ||
under Subsection (a) if the commission determines that: | ||
(1) the water is not needed under Section 11.147 or | ||
11.1471(a)(2), as applicable, to meet downstream instream flow | ||
needs or freshwater inflow needs; | ||
(2) the appropriation will accomplish a purpose | ||
established by Section 11.023; and | ||
(3) the application for the water right or amendment | ||
to the water right complies with Subsection (c). | ||
(c) A water right or an amendment to a water right | ||
authorizing a new appropriation of water for use under Subsection | ||
(a): | ||
(1) must comply with the requirements of Section | ||
11.134; | ||
(2) must include any special conditions the commission | ||
considers necessary to implement this section; and | ||
(3) may be for water that is not continuously | ||
available. | ||
(d) Before approving an application for a water right or an | ||
amendment to a water right for a new appropriation of water in the | ||
Rio Grande basin under this section, the commission shall consider | ||
the water accounting requirements for any international water | ||
sharing treaty, minutes, and agreement applicable to the Rio Grande | ||
basin and the effect of the project on the allocation of water by | ||
the Rio Grande watermaster in the middle and lower Rio Grande. The | ||
commission may not authorize a new appropriation of water that | ||
would result in a violation of a treaty or court decision. | ||
(e) An application for a water right or an amendment to a | ||
water right under this section is subject to the motion and hearing | ||
requirements of this subchapter. | ||
(f) Not later than the 180th day after the date the | ||
commission determines that a water right or an amendment to a water | ||
right under this section is administratively complete, the | ||
commission shall complete a technical review of the application. | ||
(g) The commission shall adopt rules providing for the | ||
considerations for determining the frequency that the water must be | ||
available before it may be appropriated. | ||
Sec. 11.158. AMENDMENT TO CONVERT USE FROM RESERVOIR | ||
STORAGE TO AQUIFER STORAGE AND RECOVERY. (a) In this section, | ||
"aquifer storage and recovery project" has the meaning assigned by | ||
Section 27.151. | ||
(b) A holder of a water right that authorizes the storage of | ||
water for a beneficial use in a reservoir that has not been | ||
constructed may file an application to amend the water right to | ||
remove the authorization for storage in a reservoir provided that | ||
the water diverted under the right will be stored in an aquifer | ||
storage and recovery project authorized under Section 27.153 for | ||
later retrieval and use as authorized by the original water right. | ||
(c) An application for an amendment to a water right | ||
described by Subsection (b) may request an increase in the amount of | ||
water that may be diverted or the rate of diversion on the basis of | ||
an evaporation credit that takes into account the amount of water | ||
that would have evaporated if the storage reservoir had been | ||
constructed. | ||
(d) A holder of a water right authorizing an appropriation | ||
of water for storage in a storage reservoir that has lost storage | ||
because of sedimentation, as determined by a survey performed by | ||
the board, may file an application for an amendment to the water | ||
right to change the use or purpose for which the appropriation is to | ||
be made from storage by diversion to storage as part of an aquifer | ||
storage and recovery project for later retrieval and use as | ||
authorized by the original water right in an amount equal to all or | ||
part of the amount of water yield lost to sedimentation. | ||
(e) An application for an amendment to a water right | ||
described by Subsection (b) is exempt from any notice and hearing | ||
requirements of a statute, commission rule, or permit condition and | ||
may not be referred to the State Office of Administrative Hearings | ||
for a contested case hearing if the requested change will not cause | ||
a negative effect on other water rights holders or the environment | ||
that is greater than the effect that the original permit would have | ||
had were the permit rights exercised to the full extent of the | ||
original permit. | ||
(f) An application for an amendment to a water right | ||
described by Subsection (c) or (d) is subject to the notice and | ||
hearing requirements of this chapter. | ||
(g) If the commission grants an application for an amendment | ||
to a water right described by Subsection (c) or (d), the commission | ||
shall include in the amendment any special conditions the | ||
commission considers necessary to: | ||
(1) protect existing water rights; and | ||
(2) comply with any applicable requirements | ||
established under Section 11.147 or 11.1471. | ||
(h) The commission may adopt rules providing an expedited | ||
procedure for acting on an application for an amendment to a water | ||
right described by Subsection (b) and the procedures to file and act | ||
on an application for an amendment to a water right described by | ||
Subsection (c) or (d). | ||
SECTION 3. Chapter 27, Water Code, is amended by adding | ||
Subchapter H to read as follows: | ||
SUBCHAPTER H. AQUIFER RECHARGE PROJECTS | ||
Sec. 27.201. DEFINITIONS. In this subchapter: | ||
(1) "Aquifer recharge project" means a project | ||
involving the intentional recharge of an aquifer by means of an | ||
injection well authorized under this chapter or other means of | ||
infiltration, including actions designed to: | ||
(A) reduce declines in the water level of the | ||
aquifer; | ||
(B) supplement the quantity of groundwater | ||
available; | ||
(C) improve water quality in an aquifer; | ||
(D) improve spring flows and other interactions | ||
between groundwater and surface water; or | ||
(E) mitigate subsidence. | ||
(2) "Native groundwater" means the groundwater | ||
naturally occurring in a geologic formation. | ||
(3) "Project operator" means a person holding an | ||
authorization under this subchapter to undertake an aquifer | ||
recharge project. | ||
(4) "Recharge injection well" means a Class V | ||
injection well used for the injection of water into a geologic | ||
formation for an aquifer recharge project, including an improved | ||
sinkhole or cave connected to an aquifer. | ||
Sec. 27.202. JURISDICTION. The commission has exclusive | ||
jurisdiction over the regulation and permitting of recharge | ||
injection wells. | ||
Sec. 27.203. AUTHORIZATION FOR USE OF CLASS V INJECTION | ||
WELLS. (a) The commission may authorize the use of a Class V | ||
injection well as a recharge injection well: | ||
(1) by rule; | ||
(2) under an individual permit; or | ||
(3) under a general permit. | ||
(b) In adopting a rule or issuing a permit under this | ||
section, the commission shall consider: | ||
(1) whether the injection of water will comply with | ||
the standards established by the federal Safe Drinking Water Act | ||
(42 U.S.C. Section 300f et seq.); | ||
(2) the effect of the aquifer recharge project on | ||
existing water wells; and | ||
(3) whether the introduction of water into the | ||
receiving geologic formation will alter the physical, chemical, or | ||
biological quality of the native groundwater to a degree that | ||
would: | ||
(A) render the groundwater produced from the | ||
receiving geologic formation harmful or detrimental to people, | ||
animals, vegetation, or property; or | ||
(B) require an unreasonably higher level of | ||
treatment of the groundwater produced from the receiving geologic | ||
formation than is necessary for the native groundwater to render | ||
the groundwater suitable for beneficial use. | ||
(c) The commission by rule shall provide for public notice | ||
and comment on a proposed general permit authorized under this | ||
section. The commission shall require an applicant for an | ||
individual permit authorized under this section to provide notice | ||
of the application by first class mail to any groundwater | ||
conservation district in which the wells associated with the | ||
aquifer recharge project will be located and by publishing notice | ||
in a newspaper of general circulation in the county in which the | ||
wells will be located. | ||
Sec. 27.204. TECHNICAL STANDARDS. (a) The commission shall | ||
adopt technical standards governing the approval of the use of a | ||
Class V injection well as a recharge injection well. | ||
(b) The commission may not adopt or enforce groundwater | ||
quality protection standards for the quality of water injected into | ||
a recharge injection well that are more stringent than applicable | ||
federal standards. | ||
Sec. 27.205. REPORTING OF INJECTION VOLUMES. (a) A project | ||
operator shall install a meter on each recharge injection well | ||
associated with the aquifer recharge project. | ||
(b) Each calendar year, the project operator shall provide | ||
to the commission a written or electronic report showing for the | ||
preceding calendar year the volume of water injected for recharge. | ||
Sec. 27.206. REPORTING OF WATER QUALITY DATA. A project | ||
operator shall: | ||
(1) perform water quality testing annually on water to | ||
be injected into a geologic formation as part of the aquifer | ||
recharge project; and | ||
(2) provide the results of the testing described by | ||
Subdivision (1) in written or electronic form to the commission. | ||
Sec. 27.207. OTHER LAWS NOT AFFECTED. (a) This subchapter | ||
does not affect the ability to regulate an aquifer recharge project | ||
as authorized under: | ||
(1) Chapter 626, Acts of the 73rd Legislature, Regular | ||
Session, 1993, for the Edwards Aquifer Authority; | ||
(2) Chapter 8801, Special District Local Laws Code, | ||
for the Harris-Galveston Subsidence District; | ||
(3) Chapter 8834, Special District Local Laws Code, | ||
for the Fort Bend Subsidence District; | ||
(4) Chapter 8802, Special District Local Laws Code, | ||
for the Barton Springs-Edwards Aquifer Conservation District; or | ||
(5) Chapter 8811, Special District Local Laws Code, | ||
for the Corpus Christi Aquifer Storage and Recovery Conservation | ||
District. | ||
(b) This subchapter does not affect the authority of the | ||
commission regarding: | ||
(1) recharge projects in certain portions of the | ||
Edwards underground reservoir under Sections 11.023(c) and (d); | ||
(2) injection wells that transect or terminate in | ||
certain portions of the Edwards Aquifer under Section 27.0516; or | ||
(3) aquifer storage and recovery projects under | ||
Section 11.155 or Subchapter G of this chapter. | ||
SECTION 4. Not later than June 1, 2020, the Texas Commission | ||
on Environmental Quality shall adopt rules to implement Sections | ||
11.157 and 11.158, Water Code, as added by this Act, and Subchapter | ||
H, Chapter 27, Water Code, as added by this Act. | ||
SECTION 5. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2019. | ||
______________________________ | ______________________________ | |
President of the Senate | Speaker of the House | |
I certify that H.B. No. 720 was passed by the House on May 1, | ||
2019, by the following vote: Yeas 135, Nays 3, 2 present, not | ||
voting. | ||
______________________________ | ||
Chief Clerk of the House | ||
I certify that H.B. No. 720 was passed by the Senate on May | ||
22, 2019, by the following vote: Yeas 25, Nays 6. | ||
______________________________ | ||
Secretary of the Senate | ||
APPROVED: _____________________ | ||
Date | ||
_____________________ | ||
Governor |