Bill Text: TX HB922 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to the imposition of tolls on Fairmont Parkway in Harris County.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2023-03-02 - Referred to Transportation [HB922 Detail]
Download: Texas-2023-HB922-Introduced.html
By: Cain | H.B. No. 922 |
|
||
|
||
relating to the imposition of tolls on Fairmont Parkway in Harris | ||
County. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 228.011(a), Transportation Code, is | ||
amended to read as follows: | ||
(a) This section applies only to a county acting under | ||
Chapter 284 for: | ||
(1) the widening, expansion, reconstruction, and | ||
continued operation of existing toll projects of the county; or | ||
(2) the development, construction, and operation of | ||
all or a portion of any of the following toll projects, a component | ||
of that project, or the functional equivalent of that project: | ||
(A) Beltway 8 Tollway East, between US 59 North | ||
and US 90 East; | ||
(B) Hardy Downtown Connector, consisting of the | ||
proposed direct connection from the Hardy Toll Road southern | ||
terminus at Loop 610 to downtown Houston; | ||
(C) State Highway 288, between US 59 and Grand | ||
Parkway South (State Highway 99); | ||
(D) US 290 Toll Lanes, between IH 610 West and the | ||
Grand Parkway Northwest (State Highway 99); | ||
(E) [ |
||
[ |
||
610 South and near the intersection of Beltway 8 and Hillcroft in | ||
the vicinity of the Fort Bend Parkway Tollway; | ||
(F) [ |
||
Grand Parkway (State Highway 99) and FM 1463; | ||
(G) [ |
||
Highway 6 and the Brazos River; and | ||
(H) [ |
||
State Highway 242 and the Grand Parkway (State Highway 99), and if | ||
the Grand Parkway project has not begun construction, a nontolled | ||
extension of the Montgomery County Parkway to allow a connection to | ||
Interstate Highway 45. | ||
SECTION 2. Subchapter B, Chapter 372, Transportation Code, | ||
is amended by adding Section 372.059 to read as follows: | ||
Sec. 372.059. FAIRMONT PARKWAY. A toll project entity may | ||
not impose a toll on any portion of Fairmont Parkway in Harris | ||
County. | ||
SECTION 3. This Act takes effect September 1, 2023. |