Bill Text: TX SB1894 | 2013-2014 | 83rd Legislature | Introduced
Bill Title: Relating to the procedure for review by the Texas Commission on Environmental Quality and related entities of environmental flow standards and environmental flow set-asides for river basin and bay systems and related matters.
Spectrum: Partisan Bill (Republican 1-0)
Status: (N/A - Dead) 2013-04-23 - No action taken in committee [SB1894 Detail]
Download: Texas-2013-SB1894-Introduced.html
83R16676 SMH-F | ||
By: Fraser | S.B. No. 1894 |
|
||
|
||
relating to the procedure for review by the Texas Commission on | ||
Environmental Quality and related entities of environmental flow | ||
standards and environmental flow set-asides for river basin and bay | ||
systems and related matters. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 11.02362(p), Water Code, is amended to | ||
read as follows: | ||
(p) In recognition of the importance of adaptive | ||
management, after submitting its recommendations regarding | ||
environmental flow standards and strategies to meet the | ||
environmental flow standards to the commission, each basin and bay | ||
area stakeholders committee, with the assistance of the pertinent | ||
basin and bay expert science team, shall prepare and submit for | ||
approval by the advisory group a work plan. The work plan must: | ||
(1) [ |
||
|
||
|
||
|
||
[ |
||
activities; and | ||
(2) [ |
||
validation or refinement of the basin and bay environmental flow | ||
analyses and environmental flow regime recommendations, the | ||
environmental flow standards adopted by the commission, and the | ||
strategies to achieve those standards. | ||
SECTION 2. Section 11.1471, Water Code, is amended by | ||
amending Subsection (f) and adding Subsection (g) to read as | ||
follows: | ||
(f) An environmental flow standard or environmental flow | ||
set-aside adopted under Subsection (a) may be altered by the | ||
commission in a rulemaking process undertaken in accordance with a | ||
schedule established by the commission. The [ |
||
|
||
|
||
|
||
|
||
|
||
|
||
commission shall [ |
||
undertaken for each river basin and bay system for which | ||
environmental flow standards have been adopted not more frequently | ||
than every 10 years beginning January 1, 2022, unless the | ||
commission determines that the process should be undertaken before | ||
that date [ |
||
|
||
rulemaking process undertaken under this subsection must provide | ||
for the participation of stakeholders having interests in the | ||
particular river basin and bay system for which the process is | ||
undertaken. | ||
(g) The commission shall evaluate the status of the work | ||
plans submitted by the basin and bay area stakeholders committees | ||
and approved by the advisory group under Section 11.02362(p) in | ||
accordance with a schedule established by the commission. The | ||
commission's schedule must provide for the first evaluation of work | ||
plan status for each river basin and bay system for which | ||
environmental flow standards have been adopted to be performed not | ||
later than January 1, 2017, and for subsequent evaluations to be | ||
performed every five years thereafter. | ||
SECTION 3. This Act takes effect September 1, 2013. |