Bill Text: TX SB2002 | 2023-2024 | 88th Legislature | Introduced
Bill Title: Relating to a limitation on the generation capacity provided for the ERCOT power grid from wind and solar generation facilities.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2023-03-21 - Referred to Business & Commerce [SB2002 Detail]
Download: Texas-2023-SB2002-Introduced.html
88R13223 ANG-D | ||
By: Hall | S.B. No. 2002 |
|
||
|
||
relating to a limitation on the generation capacity provided for | ||
the ERCOT power grid from wind and solar generation facilities. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 39.159, Utilities Code, as added by | ||
Chapter 426 (S.B. 3), Acts of the 87th Legislature, Regular | ||
Session, 2021, is amended by amending Subsection (b) and adding | ||
Subsection (d) to read as follows: | ||
(b) The commission shall ensure that the independent | ||
organization certified under Section 39.151 for the ERCOT power | ||
region: | ||
(1) subject to Subsection (d), establishes | ||
requirements to meet the reliability needs of the power region; | ||
(2) periodically, but at least annually, determines | ||
the quantity and characteristics of ancillary or reliability | ||
services necessary to ensure appropriate reliability during | ||
extreme heat and extreme cold weather conditions and during times | ||
of low non-dispatchable power production in the power region; | ||
(3) procures ancillary or reliability services on a | ||
competitive basis to ensure appropriate reliability during extreme | ||
heat and extreme cold weather conditions and during times of low | ||
non-dispatchable power production in the power region; | ||
(4) develops appropriate qualification and | ||
performance requirements for providing services under Subdivision | ||
(3), including appropriate penalties for failure to provide the | ||
services; and | ||
(5) sizes the services procured under Subdivision (3) | ||
to prevent prolonged rotating outages due to net load variability | ||
in high demand and low supply scenarios. | ||
(d) Beginning January 1, 2027, notwithstanding any other | ||
law, if the commission determines that installed generation | ||
capacity from wind and solar generation facilities is contributing | ||
more than 20 percent of the available generation capacity for the | ||
ERCOT power region, the commission shall: | ||
(1) prohibit the interconnection of new wind and solar | ||
generation facilities to the power grid; and | ||
(2) by rule establish standards for the disconnection | ||
of wind and solar power facilities from the power grid to ensure | ||
that wind and solar generation is not contributing more than 20 | ||
percent of the available generation capacity for the ERCOT power | ||
region at any time. | ||
SECTION 2. This Act takes effect September 1, 2023. |