Bill Text: TX SB391 | 2025-2026 | 89th Legislature | Introduced


Bill Title: Relating to a reliability plan for electric transmission service in the Permian Basin.

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced) 2024-11-19 - Filed [SB391 Detail]

Download: Texas-2025-SB391-Introduced.html
  89R4419 SCR-F
 
  By: Sparks S.B. No. 391
 
 
 
A BILL TO BE ENTITLED
 
AN ACT
  relating to a reliability plan for electric transmission service in
  the Permian Basin.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Section 39.167(a), Utilities Code, as added by
  Chapter 892 (H.B. 5066), Acts of the 88th Legislature, Regular
  Session, 2023, is amended to read as follows:
         (a)  The [Not later than January 30, 2024, the] commission
  shall direct the independent organization certified under Section
  39.151 for the ERCOT power region to develop a reliability plan
  under Section 39.166 for the Permian Basin region and update the
  plan every five years.
         SECTION 2.  Section 39.167(c), Utilities Code, as added by
  Chapter 892 (H.B. 5066), Acts of the 88th Legislature, Regular
  Session, 2023, is repealed.
         SECTION 3.  This Act takes effect September 1, 2025.
feedback