Bill Text: TX SB937 | 2011-2012 | 82nd Legislature | Enrolled


Bill Title: Relating to priorities for restoration of electric service following an extended power outage.

Spectrum: Partisan Bill (Democrat 2-0)

Status: (Passed) 2011-06-17 - Effective on 9/1/11 [SB937 Detail]

Download: Texas-2011-SB937-Enrolled.html
 
 
  S.B. No. 937
 
 
 
 
AN ACT
  relating to priorities for restoration of electric service
  following an extended power outage.
         BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS:
         SECTION 1.  Subchapter D, Chapter 38, Utilities Code, is
  amended by adding Section 38.072 to read as follows:
         Sec. 38.072.  PRIORITIES FOR POWER RESTORATION TO CERTAIN
  MEDICAL FACILITIES. (a)  In this section:
               (1)  "Assisted living facility" has the meaning
  assigned by Section 247.002, Health and Safety Code.
               (2)  "Extended power outage" has the meaning assigned
  by Section 13.1395, Water Code.
               (3)  "Hospice services" has the meaning assigned by
  Section 142.001, Health and Safety Code.
               (4)  "Nursing facility" has the meaning assigned by
  Section 242.301, Health and Safety Code.
         (b)  The commission by rule shall require an electric utility
  to give to the following the same priority that it gives to a
  hospital in the utility's emergency operations plan for restoring
  power after an extended power outage:
               (1)  a nursing facility;
               (2)  an assisted living facility; and
               (3)  a facility that provides hospice services.
         (c)  The rules adopted by the commission under Subsection (b)
  must allow an electric utility to exercise the electric utility's
  discretion to prioritize power restoration for a facility after an
  extended power outage in accordance with the facility's needs and
  with the characteristics of the geographic area in which power must
  be restored.
         (d)  A municipally owned utility shall report the emergency
  operations plan for restoring power to a facility listed in
  Subsection (b) to the municipality's governing body or the body
  vested with the power to manage and operate the municipally owned
  utility.
         (e)  An electric cooperative shall report the emergency
  operations plan for restoring power to a facility listed in
  Subsection (b) to the board of directors of the electric
  cooperative.
         SECTION 2.  This Act takes effect September 1, 2011.
 
 
 
 
 
  ______________________________ ______________________________
     President of the Senate Speaker of the House     
 
         I hereby certify that S.B. No. 937 passed the Senate on
  April 7, 2011, by the following vote:  Yeas 29, Nays 2.
 
 
  ______________________________
  Secretary of the Senate    
 
         I hereby certify that S.B. No. 937 passed the House on
  May 25, 2011, by the following vote:  Yeas 147, Nays 0, one
  present not voting.
 
 
  ______________________________
  Chief Clerk of the House   
 
 
 
  Approved:
 
  ______________________________ 
              Date
 
 
  ______________________________ 
            Governor
feedback