Bill Text: TX SB937 | 2011-2012 | 82nd Legislature | Enrolled
Bill Title: Relating to priorities for restoration of electric service following an extended power outage.
Spectrum: Partisan Bill (Democrat 2-0)
Status: (Passed) 2011-06-17 - Effective on 9/1/11 [SB937 Detail]
Download: Texas-2011-SB937-Enrolled.html
S.B. No. 937 |
|
||
relating to priorities for restoration of electric service | ||
following an extended power outage. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter D, Chapter 38, Utilities Code, is | ||
amended by adding Section 38.072 to read as follows: | ||
Sec. 38.072. PRIORITIES FOR POWER RESTORATION TO CERTAIN | ||
MEDICAL FACILITIES. (a) In this section: | ||
(1) "Assisted living facility" has the meaning | ||
assigned by Section 247.002, Health and Safety Code. | ||
(2) "Extended power outage" has the meaning assigned | ||
by Section 13.1395, Water Code. | ||
(3) "Hospice services" has the meaning assigned by | ||
Section 142.001, Health and Safety Code. | ||
(4) "Nursing facility" has the meaning assigned by | ||
Section 242.301, Health and Safety Code. | ||
(b) The commission by rule shall require an electric utility | ||
to give to the following the same priority that it gives to a | ||
hospital in the utility's emergency operations plan for restoring | ||
power after an extended power outage: | ||
(1) a nursing facility; | ||
(2) an assisted living facility; and | ||
(3) a facility that provides hospice services. | ||
(c) The rules adopted by the commission under Subsection (b) | ||
must allow an electric utility to exercise the electric utility's | ||
discretion to prioritize power restoration for a facility after an | ||
extended power outage in accordance with the facility's needs and | ||
with the characteristics of the geographic area in which power must | ||
be restored. | ||
(d) A municipally owned utility shall report the emergency | ||
operations plan for restoring power to a facility listed in | ||
Subsection (b) to the municipality's governing body or the body | ||
vested with the power to manage and operate the municipally owned | ||
utility. | ||
(e) An electric cooperative shall report the emergency | ||
operations plan for restoring power to a facility listed in | ||
Subsection (b) to the board of directors of the electric | ||
cooperative. | ||
SECTION 2. This Act takes effect September 1, 2011. | ||
______________________________ | ______________________________ | |
President of the Senate | Speaker of the House | |
I hereby certify that S.B. No. 937 passed the Senate on | ||
April 7, 2011, by the following vote: Yeas 29, Nays 2. | ||
______________________________ | ||
Secretary of the Senate | ||
I hereby certify that S.B. No. 937 passed the House on | ||
May 25, 2011, by the following vote: Yeas 147, Nays 0, one | ||
present not voting. | ||
______________________________ | ||
Chief Clerk of the House | ||
Approved: | ||
______________________________ | ||
Date | ||
______________________________ | ||
Governor |