Bill Text: VA HB2426 | 2025 | Regular Session | Introduced
Bill Title: Small renewable energy projects; permit by rule.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced) 2025-01-08 - Committee Referral Pending [HB2426 Detail]
Download: Virginia-2025-HB2426-Introduced.html
2025 SESSION
INTRODUCED
25102397D
HOUSE BILL NO. 2426
Offered January 8, 2025
Prefiled January 8, 2025
A BILL to amend and reenact § 10.1-1197.5 of the Code of Virginia, relating to small renewable energy projects; permit by rule.
—————
Patron—Callsen
—————
Committee Referral Pending
—————
Be it enacted by the General Assembly of Virginia:
1. That § 10.1-1197.5 of the Code of Virginia is amended and reenacted as follows:
§ 10.1-1197.5. Definitions.
As used in this article:
"Energy storage facility" means energy storage equipment or technology that is capable of absorbing energy, storing such energy for a period of time, and redelivering energy after it has been stored.
"Interconnection facilities" means generation tie lines, collector lines, substations, switching stations, and any other component required to connect an electrical generation facility with the electrical grid.
"Small renewable energy project" means (i) an electrical generation facility with a rated capacity not exceeding 150 megawatts that generates electricity only from sunlight or wind and its associated interconnection facilities; (ii) an electrical generation facility with a rated capacity not exceeding 100 megawatts that generates electricity only from falling water, wave motion, tides, or geothermal power and its associated interconnection facilities; (iii) an electrical generation facility with a rated capacity not exceeding 20 megawatts that generates electricity only from biomass, energy from waste, or municipal solid waste and its associated interconnection facilities; (iv) an energy storage facility that uses electrochemical cells to convert chemical energy with a rated capacity not exceeding 150 megawatts and its associated interconnection facilities; or (v) a hybrid project composed of an electrical generation facility that meets the parameters established in clause (i), (ii), or (iii) and an energy storage facility that meets the parameters established in clause (iv).