Bill Text: CA AB1533 | 2023-2024 | Regular Session | Amended
Bill Title: Electricity.
Spectrum: Committee Bill
Status: (Passed) 2024-09-22 - Chaptered by Secretary of State - Chapter 353, Statutes of 2024. [AB1533 Detail]
Download: California-2023-AB1533-Amended.html
Amended
IN
Senate
June 10, 2024 |
Amended
IN
Assembly
May 25, 2023 |
Amended
IN
Assembly
May 01, 2023 |
Amended
IN
Assembly
April 13, 2023 |
Introduced by Committee on Utilities and Energy |
February 17, 2023 |
LEGISLATIVE COUNSEL'S DIGEST
(1)
Existing law creates the Demand Side Grid Support Program, and requires the Energy Commission to implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events. Existing law requires entities with generation or load reduction assets that are incentivized pursuant to the Distributed Electricity Backup Assets Program to participate in the program, and requires all
energy produced as a result of the program to be settled at a relevant reference energy price.
This bill would delete the requirements that those entities participate in the program and the produced energy be settled at a relevant reference energy price.
(2)
(3)Existing law requires the PUC to convene or continue, until August 26, 2025, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, as specified. Existing law also
establishes the Independent Safety Committee for Diablo Canyon until, at least, the United States Nuclear Regulatory Commission operating permit for the Diablo Canyon powerplant has ceased.
This bill would extend that requirement on the PUC until August 26, 2030. The bill would require that the Independent Safety Committee for Diablo Canyon continue until the Diablo Canyon powerplant has ceased operations and make other changes related to that committee.
Existing law requires the PUC, in coordination with the Energy Commission, the Independent System Operator, and the Department of Water Resources, to submit a report to the Legislature each year on the status of new resource additions and revisions to the state’s electric demand forecast and the impact of these updates on the need for keeping the Diablo Canyon powerplant online.
(5)
(6)This bill would make legislative findings and declarations as to the necessity of a special statute for the Diablo Canyon powerplant.
(7)Under existing law, a violation of the Public Utilities Act or any order, decision, rule, direction, demand, or requirement of the PUC is a crime.
Because certain of the above provisions would be part of the act and a violation of a PUC action implementing this bill’s requirements would be a crime, the bill would impose a state-mandated local program.
The California Constitution requires the state to reimburse local agencies and school districts for certain costs mandated by the state. Statutory provisions establish procedures for making that reimbursement.
This bill would provide that no reimbursement is required by this act for a specified reason.
(8)This bill would declare that it is to take effect immediately as an urgency statute.
Digest Key
Vote:Bill Text
The people of the State of California do enact as follows:
SECTION 1.
Section 25106 of the Public Resources Code is amended to read:25106.
SEC. 2.
Section 25207 of the Public Resources Code is amended to read:25207.
(a) The members of the commission shall receive the salary provided for by Chapter 6 (commencing with Section 11550) of Part 1 of Division 3 of Title 2 of the Government Code.Each
SEC. 3.
Section 25213 of the Public Resources Code is amended to read:25213.
(b)(1)Notwithstanding any other law, the television product labeling regulations adopted by the commission shall not take effect, and the commission shall not enforce those regulations, before July 1, 2011.
(2)On and after July 1, 2011, the television product labeling regulations shall be effective if a Federal Trade Commission labeling rule for television products is not effective on or before July 1, 2011, and shall remain in effect until a Federal Trade Commission final labeling rule is effective for television products.
SEC. 4.
Section 25217.1 of the Public Resources Code is amended to read:25217.1.
The commission shall nominate and the Governor shall appoint for a term of three years a publicSEC. 5.
Section 25217.5 of the Public Resources Code is amended to read:25217.5.
The chair of the commission shall direct theSEC. 6.
Section 25222 of the Public Resources Code is amended to read:25222.
TheSEC. 7.
Section 25224 of the Public Resources Code is amended to read:25224.
(a) The commission and other state agencies shall, to the fullest extent possible, exchange records, reports, material, and other information relating to energy resources and conservation and power facilities siting, or any areas of mutual concern, to the end that unnecessary duplication of effort may be avoided.SEC. 8.
Section 25227 of the Public Resources Code is repealed.By July 1, 2011, the commission, in consultation with the Public Utilities Commission, shall develop and maintain an Internet Web site containing specific links to electrical corporation and local publicly owned electric utility Internet Web sites or other Internet Web sites that contain information specific to plug-in hybrid or fully electric vehicles, including information on the following:
(a)Resources to
direct a consumer on how to find out if his or her residence will require a utility service upgrade.
(b)Basic charging circuit requirements.
(c)Utility rate options.
(d)Load management techniques.
SEC. 9.
Section 25228 of the Public Resources Code is repealed.(a)The commission, in consultation with the Public Utilities Commission, cities, counties, special districts, and other stakeholders, shall evaluate and recommend policies and implementation strategies to overcome barriers to the deployment and use of geothermal heat pump and geothermal ground loop technologies. In evaluating these policies and strategies, the commission shall consider all of the following:
(1)The quantitative benefits and costs to ratepayers specific to safer, more reliable, or less costly gas or electrical service and through greater energy efficiency, reduction of health and environmental impacts from air pollution, and reduction of greenhouse gas emissions related to electricity and natural gas production and use, through the use of geothermal heat pump and geothermal ground loop technologies.
(2)The existing statutory and permit requirements that impact the use of geothermal heat pumps and geothermal ground loop technologies and any other existing legal impediments to the use of geothermal heat pump and geothermal ground loop technologies.
(3)The impact of the use of the geothermal heat pump and geothermal ground loop technologies on achieving the state’s goals pursuant to the California Global Warming Solutions Act of 2006 (Division 25.5 (commencing with Section 38500) of the Health and Safety Code) and achieving the state’s energy efficiency goals.
(b)The commission shall include the evaluations and recommendations made pursuant to this section in the integrated energy policy report
that is required to be adopted for calendar year 2013, pursuant to subdivision (a) of Section 25302.
SEC. 10.
Section 25302.2 of the Public Resources Code is repealed.As part of the 2019 edition of the integrated energy policy report, and as part of each integrated energy policy report adopted biennially thereafter, the commission shall evaluate the actual energy efficiency savings, as defined in Section 25310, from negative therm interactive effects generated as a result of electricity efficiency improvements.
SECTION 1.SEC. 11.
Section 25305.5 of the Public Resources Code is amended to read:25305.5.
(a) The commission shall timely incorporate firm zero-carbon resources into the integrated energy policy report prepared pursuant to Section 25302.(a)The Demand Side Grid Support Program is hereby created. The commission shall implement and administer the program to incentivize dispatchable customer load reduction and backup generation operation as on-call emergency supply and load reduction for the state’s electrical grid during extreme events.
(b)The commission shall allocate moneys to develop a new statewide program that provides incentives to reduce customer net load during extreme events with upfront capacity commitments and for per-unit reductions in net load. Eligible recipients may include all energy customers in the state, except those enrolled in demand response or emergency load reduction programs offered by
entities under the jurisdiction of the Public Utilities Commission. The commission, in consultation with the Public Utilities Commission, may adopt additional participation requirements or limitations. Payments shall be made to any of the following:
(1)Participating individual entities.
(2)Participating aggregators of multiple energy customers.
(3)Participating local publicly owned electric utilities and load-serving entities.
(c)Participants shall provide load reduction or backup generation service, or both, in response to a dispatch by an applicable California balancing authority of a California balancing authority area in which participants are located during
extreme events.
(d)The commission, in consultation with California balancing
authorities and the state board, shall adopt guidelines to determine when to implement the program, including which resources are dispatched first to minimize local pollution and emissions of greenhouse gases. The dispatch order of resources in the program shall follow a loading order that prioritizes, to the maximum extent feasible to ensure electricity reliability, cost-effective demand response and efficiency resources, then feasible, cost-effective renewable and zero-emission resources, and then feasible, cost-effective conventional resources. The guidelines shall also consider the anticipated useful life of the resources in relation to the state’s climate and air quality requirements.
(e)The state board, in consultation with the commission, shall develop a plan, including determining the funding amounts allocated after
the dispatch of resources participating in the program, to mitigate impacts from these resources.
(a)Beginning on January 31, 2023, and on May 1, August 1, and December 1 annually thereafter, the Department of Water Resources, in consultation with the commission, shall issue a written report to the Joint Legislative Budget Committee detailing the actions undertaken by the
Department of Water Resources and the commission in the period since the previous report pursuant to this chapter through that date, including, but not limited to, all of the following:
(1)Amount of funds expended.
(2)Purpose of funds expended.
(3)Status of actions funded.
(4)For new and expanded resources, the amount by megawatt, resource type, operational date, and expected lifetime of that capacity.
(5)The frequency at which resources funded by the Department of Water Resources or the commission have been used and the extent to which they complied with the requirements of this chapter.
(6)In consultation with the state board, an estimate or the best available information on the emissions of greenhouse gases, criteria air pollutants, and toxic air contaminants emitted by the resources funded by the Department of Water Resources or the commission over the period since the previous report.
(7)Summary of contracts, grants, and loans issued pursuant to this chapter.
(b)Each report submitted pursuant to this section shall be submitted to the Joint Legislative Budget Committee at the same time and in the same manner as reports submitted pursuant to Section 80730 of the Water Code.
(a)It is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90 percent of all retail sales of electricity to California end-use customers by December 31, 2035, 95 percent of all retail sales of electricity to California end-use customers by December 31, 2040, 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045, and 100 percent of electricity procured to serve all state agencies by December 31, 2035. The achievement of this policy for California shall not increase carbon emissions elsewhere in the western grid and shall not allow resource shuffling. The commission and Energy Commission, in consultation with the State Air Resources Board, shall take
steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas emissions increases elsewhere in the western grid, and is undertaken in a manner consistent with clause 3 of Section 8 of Article I of the United States Constitution. The commission, the Energy Commission, the State Air Resources Board, and all other state agencies shall incorporate this policy into all relevant planning.
(b)The commission, Energy Commission, State Air Resources Board, and all other state agencies shall ensure that actions taken in furtherance of subdivision (a) do all of the following:
(1)Maintain and protect the safety, reliable operation, and balancing of the electric system.
(2)Prevent unreasonable impacts to electricity, gas, and water customer rates and bills resulting from implementation of this section, taking into full consideration the economic and environmental costs and benefits of renewable energy and zero-carbon resources.
(3)To the extent feasible and authorized under law, lead to the adoption of policies and taking of actions in other sectors to obtain greenhouse gas emission reductions that ensure equity between other sectors and the electricity sector.
(4)Not affect in any manner the rules and requirements for the oversight of, and enforcement against, retail sellers and local publicly owned utilities pursuant to the California Renewables Portfolio Standard Program (Article 16 (commencing with Section 399.11) of Chapter 2.3) and Sections 454.51, 454.52, 9621, and 9622.
(5)Not consider the energy, capacity, or any attribute from the Diablo Canyon Unit 1 or Unit 2 powerplant after August 26, 2025, in achieving the policy described in subdivision (a).
(c)Nothing in this section shall affect a retail seller’s obligation to comply with the federal Public Utility Regulatory Policies Act of 1978 (16 U.S.C. Sec. 2601 et seq.).
(d)The commission, Energy Commission, and State Air Resources Board shall use programs authorized under existing statutes to achieve the policy described in subdivision (a).
(e)In a proceeding evaluating the issuance of a certificate of public convenience and necessity for a proposed transmission project, the commission shall establish a rebuttable presumption with regard to need for the proposed transmission project in favor of an Independent System Operator governing board-approved need evaluation if all of the following are satisfied:
(1)The Independent System Operator governing board has made explicit findings regarding the need for the proposed transmission project.
(2)The Independent System Operator is a party to the proceeding.
(3)The Independent System Operator governing board-approved need evaluation is submitted to the commission within sufficient time to be included within the scope of the proceeding.
(f)This section does not authorize the commission to establish any requirements on a nonmobile self-cogeneration or cogeneration facility that served onsite load, or that served load pursuant to an over-the-fence arrangement if that arrangement existed on or before December 20, 1995.
(g)This section does not limit any entity, including local governments, from accelerating their achievement of the state’s electric sector decarbonization
targets.
(a)The commission shall convene, or continue, until August 26, 2030, an independent peer review panel to conduct an independent review of enhanced seismic studies and surveys of the Diablo Canyon Units 1 and 2 powerplant, including the surrounding areas of the facility and areas of nuclear waste storage.
(b)The independent peer review panel shall contract with the Energy Commission, the California Geological Survey of the Department of Conservation, the California Coastal Commission, the Alfred E. Alquist Seismic Safety Commission, the Office of Emergency Services, and the County of San Luis Obispo to participate on the panel and provide expertise.
(c)The independent peer review panel shall review the seismic studies and hold public meetings.
(d)The commission shall make reports by the independent peer review panel publicly available on the internet website maintained by the commission.
(a)The Legislature finds and declares that in commission Decision 88-12-083 (December 19, 1988) Re Pacific Gas and Electric Company (30 CPUC.2d 189), the commission created the Independent Safety Committee for Diablo Canyon to make recommendations appropriate to enhance the safety of the operation of the Diablo Canyon powerplant.
(b)The Independent Safety Committee for Diablo Canyon shall continue to have the rights established pursuant to commission Decision 88-12-083, as amended by Decisions 07-01-028 and 21-09-003, to conduct annual examinations of the Diablo Canyon powerplant and make additional site visits. The committee shall cease operations no sooner than when the Diablo
Canyon powerplant has ceased operations and all spent nuclear fuel has been moved to dry storage at the Diablo Canyon Independent Spent Fuel Storage Installation.
(c)The Independent Safety Committee for Diablo Canyon shall be composed of three experts, one each shall be appointed by the Governor, the Attorney General, and the Chair of the Energy Commission, from a list of candidates nominated by the President of the commission that shall include not more than three qualified candidates as alternatives to the reappointment of the appointing authority’s designated committee member whose term is expiring, and which shall also include the incumbent committee member if the member consents to being an additional candidate. The incumbent as of August 1, 2022, may continue to serve their current term until it expires.
(d)The commission shall ensure the funding of the Independent Safety Committee for Diablo Canyon to attract qualified experts during the period of extended operations of the Diablo Canyon powerplant, as defined by Section 712.8.
(e)In addition to the duties and responsibilities set forth in commission decisions, the Independent Safety Committee for Diablo Canyon shall do both of the following:
(1)Consult with and incorporate into its assessments and recommendations the independent peer review panel established pursuant to Section 712.
(2)Transmit annually its findings and recommendations for improved safety, and any response required pursuant to subdivision (f), to the Legislature, the Governor, the commission, the Energy Commission, the United States Nuclear Regulatory Commission, and the company licensed to operate the Diablo Canyon Units 1 and 2 powerplant. The report transmitted to the Legislature shall be in accordance with Section 9795 of the Government Code.
(f)The company licensed to operate the Diablo Canyon Units 1 and 2 powerplant shall annually respond to the annual report provided for in paragraph (2) of subdivision (e) and distribute its response to the governmental entities specified in that paragraph.
(a)For purposes of this section, the following definitions apply:
(1)“Current expiration dates” has the same meaning as defined in Section 25548.1 of the Public Resources Code.
(2)“Diablo Canyon powerplant operations” has the same meaning as defined in Section 25548.1 of the Public Resources Code.
(3)“Load-serving entity” has the same meaning as defined in Section 380.
(4)“Operator” has the same meaning as defined in Section 25548.1 of the Public Resources Code.
(b)(1)Ordering paragraphs (1) and (14) of commission Decision 18-01-022 (January 11, 2018) Decision Approving Retirement of Diablo Canyon Nuclear Power Plant, are hereby invalidated.
(2)The commission shall reopen commission Application 16-08-006 and take other actions as are necessary to implement this section.
(c)(1)(A)Notwithstanding any other law, within 120 days of September 2, 2022, the commission shall direct and authorize the operator of the Diablo Canyon Units 1 and 2 to take all actions that would be necessary to operate the powerplant beyond the current expiration dates, so as to preserve the option of extended operations, until the
following retirement dates, conditional upon continued authorization to operate by the United States Nuclear Regulatory Commission:
(i)For Unit 1, October 31, 2029.
(ii)For Unit 2, October 31, 2030.
(B)If the loan provided for by Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code is terminated under that chapter, the commission shall modify its order under this paragraph and direct an earlier retirement date.
(C)Actions taken by the operator pursuant to the commission’s actions under this paragraph, including in preparation for extended operations, shall not be funded by ratepayers of any load-serving entities, but may be funded by the loan provided for by Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code or other nonratepayer funds available to the operator. The commission shall not allow the recovery from ratepayers of costs incurred by the operator to prepare for, seek, or receive any extended license to operate by the United States Nuclear Regulatory Commission.
(2)(A)No later than December 31, 2023, and notwithstanding the 180-day time limitation in subdivision (a) of Section 25548.2 of the Public Resources Code, the commission shall direct and authorize extended operations at the Diablo Canyon powerplant until the new retirement dates specified in subparagraph (A) of paragraph (1).
(B)The commission shall review the reports and recommendations of the Independent Safety Committee for Diablo Canyon described in Section 712.1. If the Independent Safety Committee for Diablo Canyon’s reports or recommendations cause the commission to determine, in its discretion, that the costs of any upgrades necessary to address seismic safety or issues of deferred maintenance that may have arisen due to the expectation of the plant closing sooner are too high to justify incurring, or if the United States Nuclear Regulatory Commission’s conditions of license renewal require expenditures that are too high to justify incurring, the commission may issue an order that reestablishes the current expiration dates as the retirement date, or that establishes new retirement dates that are earlier than provided in subparagraph (A) of paragraph (1), to the extent allowable under federal law, and shall provide sufficient time for orderly shutdown and authorize recovery of any outstanding uncollected costs and fees.
(C)If the loan provided for by Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code is terminated under that chapter, the commission may issue an order that reestablishes the current expiration dates as the retirement date, or that establishes new retirement dates that are earlier than provided in subparagraph (A) of paragraph (1), and shall provide sufficient time for orderly shutdown and authorize recovery of any outstanding uncollected costs and fees.
(D)If the commission determines that new renewable energy and zero-carbon resources that are adequate to substitute for the Diablo Canyon powerplant and that meet the state’s planning standards for energy reliability have already been constructed and interconnected by the time of its decision, the commission may issue an order that reestablishes the current expiration dates as the retirement date, or that establishes new retirement dates that are earlier than provided in subparagraph (A) of paragraph (1), and shall provide sufficient time for orderly shutdown and authorize recovery of any outstanding uncollected costs and fees.
(E)Any retirement date established under this paragraph shall be conditioned upon continued authorization to operate by the United States Nuclear Regulatory Commission. If the United States Nuclear Regulatory Commission does not extend the current expiration dates or renews the licenses for Diablo Canyon Units 1 or 2 for a period shorter than the extended operations authorized by the commission, the commission shall modify any orders issued under this paragraph to direct a retirement date that is the same as the United States Nuclear Regulatory Commission license expiration date.
(3)The commission shall do all things necessary and appropriate to implement this section, including, but not limited to, allocating financial responsibility for the extended operations of the Diablo Canyon powerplant to customers of all load-serving entities and ensuring completion of funding of the community impacts mitigation settlement described in Section 712.7. The commission shall not require any funds already disbursed or committed under the community impacts mitigation settlement described in Section 712.7 to be returned because of extended operations of the Diablo Canyon powerplant.
(4)Except as authorized by this section, customers of load-serving entities shall have no other financial responsibility for the costs of the extended operations of the Diablo Canyon powerplant. In no event shall load-serving entities other than the operator and their customers have any liability for the operations of the Diablo Canyon powerplant.
(5)Consistent with Section 25548.4 of the Public Resources Code, the commission shall collaborate with the Department of Water Resources to oversee the operator’s actions that are funded by the loan provided for by Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code.
(d)The commission shall not increase cost recovery from ratepayers for operations and maintenance expenses incurred by the operator during the period from August 1, 2022, to November
2, 2024, for Diablo Canyon Unit 1 and from August 1, 2022, to August 26, 2025, for Diablo Canyon Unit 2, above the amounts approved in the most recent general rate case for the operator pursuant to commission proceeding A.21-06-021 (June 30, 2021) Application of Pacific Gas and Electric Company for Authority, Among Other Things, to Increase Rates and Charges for Electric and Gas Service Effective on January 1, 2023.
(e)The commission shall order the operator to track all costs associated with continued and extended operations of Diablo Canyon Units 1 and 2. The commission shall authorize the operator to establish accounts as necessary to track all costs incurred under paragraph (1) of subdivision (c), all costs incurred under the loan provided for by Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources
Code, all costs to be borne only by the operator’s ratepayers, all costs to be borne by ratepayers of all load-serving entities, consistent with this section, and any other costs as determined by the commission. Among these accounts shall be a Diablo Canyon Extended Operations liquidated damages balancing account, described in subdivisions (g) and (i).
(f)(1)Notwithstanding any approval of extended operations, the commission shall continue to authorize the operator to recover in rates all of the reasonable costs incurred to prepare for the retirement of Diablo Canyon Units 1 and 2, including any reasonable additional costs associated with decommissioning planning resulting from the license renewal applications or license renewals. The reasonable costs incurred to prepare for the retirement of Diablo Canyon Power
Plant Units 1 and 2 shall be recovered on a fully nonbypassable basis from customers of all load-serving entities subject to the commission’s jurisdiction in the operator’s service territory, as determined by the commission,
except that the reasonable additional costs associated with decommissioning planning resulting from the license renewal applications or license renewals shall be recovered on a fully nonbypassable basis from customers of all load-serving entities subject to the commission’s jurisdiction in the state.
(2)The commission shall continue to fund the employee retention program approved in Decision 18-11-024 (December 2, 2018) Decision Implementing Senate Bill 1090 and Modifying Decision 18-01-022, as modified to incorporate 2024, 2025, and additional years of extended operations, on an ongoing basis until the end of operations of both units with program costs tracked under subdivision (e) and fully recovered in rates. Any additional funding for the employee retention program beyond what was already approved in commission Decision 18-11-024 shall be submitted by the operator in an application for review by the commission.
(3)The commission shall determine the amount or allocation that the customers of all load-serving entities subject to the commission’s jurisdiction shall contribute towards the reasonable additional costs of decommissioning planning resulting from the license renewal applications or license renewals and shall authorize the operator to recover in rates those costs through a nonbypassable charge applicable to the customers of all load-serving entities subject to the commission’s jurisdiction in the state as set forth in paragraph (1) of subdivision (l).
(4)The commission shall authorize the operator to recover in rates all of the reasonable costs incurred to prepare for, respond to, provide information to, or otherwise participate in or engage the independent peer review panel under Section 712.
(5)In lieu of a rate-based return on investment and in acknowledgment of the greater risk of outages in an older plant that the operator could be held liable for, the commission shall authorize the operator to recover in rates a volumetric payment equal to six dollars and fifty cents ($6.50), in 2022 dollars, for each megawatthour generated by the Diablo Canyon powerplant during the period of extended operations beyond the current expiration dates, to be borne by customers of all load-serving entities, and an additional volumetric payment equal to six dollars and fifty cents ($6.50), in 2022 dollars, to be borne by customers in the service territory of the operator. The amount of the operating risk payment shall be adjusted annually by the commission using commission-approved escalation methodologies and adjustment factors.
(6)(A)In lieu of a rate-based return on investment and in acknowledgment of the greater risk of outages in an older plant that the operator could be held liable for, the commission shall authorize the operator to recover in rates a fixed payment of fifty million dollars ($50,000,000), in 2022 dollars, for each unit for each year of extended operations, subject to adjustment in subparagraphs (B) to (D), inclusive. The amount of the fixed payment shall be adjusted annually by the commission using commission-approved escalation methodologies and adjustment factors.
(B)In the first year of extended operations for each unit, the operator shall continue to receive the full fixed payment during periods in which a unit is out of service due to an unplanned outage for nine months or less, and shall receive 50 percent of the payment for months in excess of nine months that a unit is down.
(C)In the second year of extended operations, the operator shall continue to receive the fixed payment during periods in which a unit is out of service due to an unplanned outage for eight months or less, and shall receive 50 percent of the payment for months in excess of eight months that a unit is down.
(D)In each subsequent year of extended operations, the period in which the full fixed payment is received during periods when a unit is out of service due to an unplanned outage shall decline by one additional month.
(g)The commission shall authorize and fund as part of the charge under paragraph (1) of subdivision (l), the Diablo Canyon Extended Operations liquidated damages balancing account in the amount of twelve million five hundred thousand dollars ($12,500,000) each month for each unit until the liquidated damages balancing account has a balance of three hundred million dollars ($300,000,000).
(h)(1)The commission shall authorize the operator to recover all reasonable costs and expenses necessary to operate Diablo Canyon Units 1 and 2 beyond the current expiration dates, including those in subdivisions (f) and (g), net of market revenues for
those operations and any production tax credits of the operator, on a forecast basis in a new proceeding structured similarly to its annual Energy Resource Recovery Account forecast proceeding with a subsequent true-up to actual costs and market revenues for the prior calendar year via an expedited Tier 3 advice letter process, provided that there shall be no further review of the reasonableness of costs incurred if actual costs are below 115 percent of the forecasted costs. All costs shall be recovered as an operating expense and shall not be eligible for inclusion in the operator’s rate base.
(2)As the result of any significant one-time capital expenditures during the extended operation period, the commission may authorize, and the operator may propose, cost recovery of these expenditures as operating expenses amortized over more than one year for the purpose of reducing rate volatility, at an amortization interest rate determined by the commission. The commission shall allow cost recovery if the costs and expenses are just and reasonable. Those costs and expenses are just and reasonable if the operator’s conduct is consistent with the actions that a reasonable utility would have undertaken in good faith under similar circumstances, at the relevant point in time and with information that the operator should have known at the relevant point in time.
(3)If, as a result of the annual true-up for extended operations in paragraph (1), the commission determines that market revenues for the prior year exceeded the annual costs and expenses, including those in subdivisions (f) and (g), the commission shall direct that any available surplus revenues in an account created under subdivision (e) be credited solely to customers in the operator’s service territory. For customers outside the operator’s service territory, market revenues may be credited up to, but not to exceed, their respective annual costs and expenses. If excess funds remain in an account created under subdivision (e) as a result of market revenues exceeding costs and expenses in the final year of the extended operating period, after truing up the final operating year’s market revenues against costs and expenses, the remaining funds shall be the sole source of loan repayment per the requirements provided under Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code, except that any federal funds received as described in paragraph (1) of subdivision (c) of Section 25548.3 of the Public Resources Code shall also be used to repay the loan. Ratepayer funds shall not otherwise be used in any manner to repay the loan provided for under Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code.
(i)(1)During any unplanned outage periods, the commission shall authorize the operator to recover reasonable replacement power costs, if incurred, associated with Diablo Canyon powerplant operations. If the commission finds that replacement power costs incurred when a unit is out of service due to an unplanned outage are the result of a failure of the operator to meet the reasonable manager standard, then the commission shall authorize payment of the replacement power costs from the Diablo Canyon Extended Operations liquidated damages balancing account described in subdivision (g).
(2)After commencing payments from the Diablo Canyon Extended Operations liquidated damages balancing account under the conditions described in paragraph (1), the commission shall authorize the replenishment of the Diablo Canyon Extended Operations liquidated damages balancing account in the amount of twelve million five hundred thousand dollars ($12,500,000) for each unit for each month up to a maximum account balance of three hundred million dollars ($300,000,000).
(j)If the commission finds that the operator is requesting recovery of costs that were previously authorized by the commission or other state or federal agency or paid to the operator for cost recovery, the commission may fine the operator an amount up to three times the amount of the penalty provided in Section 2107 for each violation.
(k)If at any
point during the license renewal process or extended operations period the operator believes that, as a result of an unplanned outage, an emergent operating risk, or a new compliance requirement, the cost of performing upgrades needed to continue operations of one or both units exceed the benefits to ratepayers of the continued operation of doing so, the operator shall promptly notify the commission. The commission shall promptly review and determine whether expending funds to continue operations is reasonable, will remain beneficial to ratepayers, and is in the public interest or direct the operator to cease operations. The operator shall take all actions necessary to safely operate or maintain the Diablo Canyon powerplant pending the commission determination.
(l)(1)Any costs the commission authorizes the operator
to recover in rates under this section shall be recovered on a fully nonbypassable basis from customers of all load-serving entities subject to the commissions’s jurisdiction, as determined by the commission, except as otherwise provided in this section. The recovery of these nonbypassable costs by the load-serving entities shall be based on each customer’s gross consumption of electricity regardless of a customer’s net metering status or purchase of electric energy and service from an electric service provider, community choice aggregator, or other third-party source of electric energy or electricity service.
(2)The commission shall establish mechanisms, including authorizing balancing and memorandum accounts and, as needed, agreements with, or orders with respect to, electrical corporations, community choice aggregators, and electric service providers, to ensure that the revenues received to pay a charge or cost payable pursuant to this section are recovered in rates from those entities and promptly remitted to the entity entitled to those revenues.
(m)This section does not alter the recovery of costs, including those previously approved by the commission, to operate Diablo Canyon Units 1 and 2 until the current expiration dates.
(n)The commission shall halt disbursements from the Diablo Canyon Nuclear Decommissioning Non-Qualified Trust, excluding refunds to ratepayers.
(o)The commission, in consultation with the relevant federal and state agencies and appropriate California Native American tribes, shall, in a new or existing proceeding, determine
the disposition of the Diablo Canyon powerplant real property and its surrounding real properties owned by the applicable public utility or any legally related, affiliated, or associated companies, in a manner that best serves the interests of the local community, ratepayers, California Native America tribes, and the state. It is the intent of the Legislature that the existing efforts to transfer lands owned by the operator and Eureka Energy shall not be impeded by the extension of the Diablo Canyon powerplant.
(p)Except as otherwise provided in this section, this section does not alter or limit any proceeding of the commission relating to the decommissioning of the Diablo Canyon powerplant.
(q)The Legislature finds and declares that the purpose of the extension of the
Diablo Canyon powerplant operations is to protect the state against significant uncertainty in future demand resulting from the state’s greenhouse gas reduction efforts involving electrification of transportation and building energy end uses and regional climate-related weather phenomenon, and to address the
risk that currently ordered procurement will be insufficient to meet this supply or that there may be delays in bringing the ordered resources online on schedule. Consequently, the continued operation of Diablo Canyon Units 1 and 2 beyond their current expiration dates shall not be factored into the analyses used by the commission or by load-serving entities not subject to the commission’s jurisdiction when determining future generation and transmission needs to ensure electrical grid reliability and to meet the state’s greenhouse gas emissions reduction goals. To the extent the commission decides to allocate any benefits or attributes from extended operations of the Diablo Canyon powerplant, the commission
may consider the higher cost to customers in the operator’s service area.
(r)Any sale, mortgage, transfer of operational control, or any other encumbrance of disposition of the Diablo Canyon powerplant shall continue to be subject to Article 6 (commencing with Section 851).
(s)(1)The operator shall submit to the commission for its review, on an annual basis the amount of compensation earned under paragraph (5) of subdivision (f), how it was spent, and a plan for prioritizing the uses of such compensation the next year. Such compensation shall not be paid out to shareholders. Such compensation, to the extent it is not needed for Diablo Canyon, shall be spent to accelerate, or increase spending on, the following critical public purpose priorities:
(A)Accelerating customer and generator interconnections.
(B)Accelerating actions needed to bring renewable and zero-carbon energy online and modernize the electrical grid.
(C)Accelerating building decarbonization.
(D)Workforce and customer safety.
(E)Communications and education.
(F)Increasing resiliency and reducing operational and system risk.
(2)The operator shall not earn a rate of return for any of the expenditures described in paragraph (1) so that no profit shall be realized by the operator’s shareholders. Neither the operator nor any of its affiliates or holding company may increase existing public earning per share guidance as a result of compensation provided under this section. The commission shall ensure no double recovery in rates.
(t)The commission shall verify at the conclusion of extended operations that the operator’s sole compensation during the period of extended operations is limited to and in accordance with paragraphs (5) and (6) of subdivision (f) and shall be in lieu of a rate-based return on investment in the Diablo Canyon powerplant. Any excess funds remaining in an account created under subdivision (e) as a result of market revenues exceeding costs and expenses across the extended operating period, after truing up the final operating year’s market revenues against costs and expenses, following
loan repayment under paragraph (3) of subdivision (h), shall not be paid out to shareholders. Instead, such excess funds
shall be returned in full to customers in a manner to be determined by the commission, except that any funds remaining in the Diablo Canyon Extended Operations liquidated damages balancing account specified in subdivisions (g) and (i), shall be returned to customers in the operator’s service territory in a manner to be determined by the commission.
(u)The efforts to transfer lands owned by the operator and Eureka Energy, including North Ranch, Parcel P, South Ranch, and Wild Cherry Canyon, shall not be impeded by the extension of the operation of the Diablo Canyon powerplant.
(v)In the event of a final determination by the United States Department of Energy that the Diablo Canyon powerplant is not eligible for the Civil Nuclear Credit Program established by Section 18753
of Title 42 of the United States Code, subdivisions (d) to (m), inclusive, (p), (q), (s), and (t) shall cease to be operative, and the commission shall instead undertake ordinary ratemaking with respect to the Diablo Canyon powerplant.
SEC. 12.
Section 25320 of the Public Resources Code is amended to read:25320.
(a) The commission shall manage a data collection system for obtaining information necessary to develop the policy reports and analyses required by Sections 25301 to 25307, inclusive, the energy shortage contingency planning efforts in Chapter 8 (commencing with Section 25700), and to support other duties of the commission.SEC. 13.
Section 25401.6 of the Public Resources Code is repealed.(a)In its administration of Section 25744, the commission shall establish a separate rebate for eligible distributed emerging technologies for affordable housing projects including, but not limited to, projects undertaken pursuant to Section 50052.5, 50053, or 50199.4 of the Health and Safety Code. In establishing the rebate, where the commission determines that the occupants of the housing shall have individual meters, the commission may adjust the amount of the rebate based on the capacity of the system, provided that a system may receive a rebate only up to 75 percent of the total installed costs. The commission may establish a reasonable limit on the total amount of funds dedicated for purposes of this section.
(b)It is the intent of the Legislature that this section fulfills the purpose of paragraph (5) of subdivision (b) of Section 25744.
SEC. 14.
Section 25402 of the Public Resources Code is amended to read:25402.
The commission shall, after one or more public hearings, do all of the following(5)Notwithstanding paragraph (4), the commission may adopt standards pursuant to Commission Order No. 84-0111-1, on or before June 30, 1985.
(e)(1)Not later than January 1, 2004, amend any regulations in effect on January 1, 2003, pertaining to the energy efficiency standards for residential clothes washers to require that residential clothes washers manufactured on or after January 1, 2007, be at least as water efficient as commercial clothes washers.
(2)Not later than April 1, 2004, petition the federal Department of Energy for an exemption from any relevant federal regulations governing energy efficiency standards that apply to residential clothes washers.
(f)
SEC. 15.
Section 25402.1 of the Public Resources Code is amended to read:25402.1.
SEC. 16.
Section 25402.6 of the Public Resources Code is repealed.The commission shall investigate options and develop a plan to decrease wasteful peakload energy consumption in existing residential and nonresidential buildings. On or before January 1, 2004, the commission shall report its findings to the Legislature, including, but not limited to, any changes in law necessary to implement the plan to decrease wasteful peakload energy consumption in existing residential and nonresidential buildings.
SEC. 17.
Section 25402.7 of the Public Resources Code is amended to read:25402.7.
(a) In consultation with the commission, electric and gas utilities shall provide support for building standards and other regulations pursuant to SectionSEC. 18.
Section 25402.11 of the Public Resources Code is amended to read:25402.11.
(a) (1) The commission may adopt regulations establishing an administrative enforcement process for a violation of a regulation adopted pursuant to subdivisions (c) andSEC. 19.
Section 25403.8 of the Public Resources Code is amended to read:25403.8.
(a) The commission shall develop and implement a program to provide battery backup power for those official traffic control signals, operated by a city, county, or city and county, that the commission, in consultation with cities, counties, or cities and counties, determines to be high priority traffic control signals.(e)If a city, county, or city and county has installed a backup battery system for LED traffic control signals between January 1, 2001, and the effective date of the act adding this section, the commission may reimburse the city, county, or city and county for up to 30 percent of the cost incurred for the backup battery system installation. However, the commission may not spend more than one million five hundred thousand dollars ($1,500,000) for reimbursements pursuant to this subdivision.
SEC. 20.
Section 25405.5 of the Public Resources Code is amended to read:25405.5.
(a) As used in this section, the following terms have the following meanings:SEC. 21.
Chapter 5.1 (commencing with Section 25406) of Division 15 of the Public Resources Code is repealed.SEC. 22.
Section 25486 of the Public Resources Code is repealed.The department is encouraged to establish as soon as possible preferential lanes for the use of buses and three-passenger carpool vehicles in both directions on State Highway Route 10, the Santa Monica Freeway, at least from Centinela Avenue to Vermont Avenue in Los Angeles County. Due to the high-density traffic flow on such a highway, it is necessary that the department establish such preferential lanes as a pilot project so that data can be developed for implementation of similar projects in other areas of the state.
SEC. 23.
Section 25519 of the Public Resources Code is amended to read:25519.
(a)SEC. 24.
Section 25555 of the Public Resources Code is amended to read:(a)Not later than September 15, 2017, the commission shall report to the respective budget committees of each house of the Legislature on the resources needed to develop a plan for tracking natural gas, and a recommendation for developing the plan, considering cost-effectiveness and efficacy. This report shall include the resources needed to do all of the following:
(1)Collect data from natural gas participants to support the work described in subdivision (c). The commission shall consult with the State Air Resources Board to determine the most appropriate data to collect.
(2)Consider participation in, or formation of, interstate and federal working groups, compacts, or agreements.
(3)Establish methods to ensure natural gas tracking data reporting compliance by buyers of natural gas, and natural gas producers, marketers, storers, and transporters.
(4)Provide data collected pursuant to paragraph (1) to the State Air Resources Board to support the implementation of Section 39731 of the Health and Safety Code.
(b)In the consideration of the report pursuant to subdivision (a), the commission consult with, and receive information from, stakeholders, including, but not limited to, the Public Utilities Commission, the United States Environmental Protection Agency, the United States Department of Energy, the State Air Resources Board, the division, the Federal Energy Regulatory Commission, the United States Department of Transportation Office of
Pipeline Safety, appropriate agencies in states where gas consumed in California is produced, gathered and boosted, processed, transmitted, stored, or distributed, representatives of the oil and gas industry, and independent experts from academia and nongovernmental organizations.
(c)
25555.
The State Air Resources Board, in consultation with the commission, shall develop a model of fugitive and vented emissions of methane from natural gas infrastructure. The model shall do all of the following:(1)
(2)
(3)
SEC. 25.
Section 25601 of the Public Resources Code is amended to read:25601.
The commission shall develop and coordinate a program of research and development in energy supply, consumption, and conservation and the technology of siting facilities and shall give priority to those forms of research and development(f)To accomplish the purposes of subdivision (c), an amount not more than one-half of the total state funds appropriated for the solar energy research and development program as proposed in the budget prepared pursuant to Section 25604 shall be allocated for large-scale demonstration of alternative energy systems.
SEC. 26.
Section 25603.5 of the Public Resources Code is repealed.(a)Pursuant to the duties of the commission described in subdivision (a) of Section 25401 and Section 25603, the commission shall conduct a statewide architectural design competition to select outstanding designs for new single-family and multifamily residential units which incorporate passive solar and other energy-conserving design features.
The purpose of the competition, to be known as the “State Solar Medallion Passive Design Competition”, is to demonstrate the technical and economic feasibility of passive solar design for residential construction, to speed its commercialization, and to promote its use by developers in housing for moderate-income families in the state. The competition shall be carried out with the assistance and cooperation of the Office of the State Architect.
(b)The competition shall be conducted for each of the state’s six regional climate zones. Each climate zone shall have the following four categories of competition:
(1)Single-family dwellings. The construction costs of these dwellings shall not exceed thirty-five thousand dollars ($35,000) and the market price, inclusive of land, construction, permits, fees, overhead and profit shall not exceed fifty-five thousand dollars ($55,000); provided that, if the commission determines that, as of the date construction is completed, the cost of housing construction in this state has increased due to economic inflation since January 1, 1979, the commission may increase these sums by the amount of such inflation as indicated by the construction cost index.
(2)Single-family dwellings. The construction costs of these dwellings shall not exceed fifty-five thousand dollars ($55,000) and the market price, inclusive of land, construction, permits, fees, overhead and profit shall not exceed eighty-five thousand dollars ($85,000); provided that, if the commission determines that, as of the date construction is completed, the cost of housing construction in this state has increased due to economic inflation since January 1, 1979, the commission may increase these sums by the amount of such inflation as indicated by the construction cost index.
(3)Multifamily housing units with a market price or rental value comparable to paragraph (1) of this subdivision.
(4)Multifamily housing units with a market price or rental value comparable to paragraph (2) of this subdivision.
(c)In order to qualify for the competition, entrants shall be a team composed of at least one member from each of the following categories:
(1)A building designer or architect.
(2)A builder, developer, or contractor.
(d)With submission of designs to the competition, all entrants shall agree to comply with the following provisions, if awarded the Solar Medallion or the first place prize in any category:
(1)To build five models of the winning design for single-family home categories if the builder, developer, or contractor member of the winning team constructed more than 30 single-family detached units during the one-year period ending on the date of the award, or
(2)To build three models of the winning design for single-family home categories if the builder, developer, or contractor member of the winning team constructed 30 or fewer single-family detached units during the one-year period ending on the date of the award, or
(3)To build one model of the winning design for all multifamily categories.
(4)To commence construction within 18 months of the announcement of awards.
(5)To permit the commission to install monitoring equipment for measuring energy conservation performance of the structure on all models constructed in compliance with paragraphs (1), (2), and (3) of this subdivision.
(6)To permit the commission to document, exhibit, and publicize the constructed designs.
All models of winning designs shall be built on the site or sites described in the submission or on an alternate site or sites with comparable features.
Cash awards to authors of the winning designs may be made prior to commencement of the agreed upon construction.
All winning designs in the competition shall become the property of the state and may be published and exhibited by the state after completion of competition.
(e)The judging panel for the competition shall consist of the following five jurors:
(1)One representative of the Office of the State Architect.
(2)One representative of the commission.
(3)One certificated architect.
(4)One representative of the state’s lending institutions.
(5)One developer, builder, or contractor.
The nonagency members shall be appointed by the State Architect.
In recognition of the wide variation in construction costs statewide, and in order to ensure fair and equitable competition in all areas of the state, a cost index shall be used to determine different construction cost and market price requirements for each category of competition in the major metropolitan areas of the state. The construction cost and market price figures specified in paragraphs (1) and (2) of subdivision (b) shall be used as the upper limit values on which the index shall be based. Construction cost and market price figures reflecting the diversity in costs in different areas of the state shall be determined in relation to upper limit values specified in this section.
The cost index shall be prepared by the Office of the State Architect and shall be published in the competition program.
The evaluation shall take place in two stages, with an initial technical review by the commission staff. The staff shall submit to the judging panel a rigorous technical assessment of the anticipated energy conservation performance of all submissions. Final selection shall be made by the judging panel.
Designs submitted to the competition shall be judged on the extent to which they satisfy the following criteria:
(1)Use of passive solar and other energy conserving design features.
(2)Amount of energy savings achieved by the design.
(3)Adaptability of the design to widespread use.
(f)The commission shall be responsible for developing rules and procedures for the conduct of the competition and for the judging, which rules shall ensure anonymity of designs submitted prior to final awarding of prizes, shall ensure impartiality of the judging panel, and shall ensure uniform treatment of competitors.
In administering the competition, the commission shall accomplish the following tasks:
(1)Preparation of a competition program, including climatological data for each of the six regional climate zones.
(2)Distribution of competition information and ongoing publicity.
(3)Development of rules and procedures for competitors and judges.
(4)Preparation of a summary document for the competition, including a portfolio of winning designs and followup publicity.
(5)Instrumentation of winning dwellings constructed in accordance with requirements of this section; instrumentation for measurement of energy conservation performance of the units and ongoing data collection shall be provided by the commission pursuant to Section 25607.
For purposes of administering the competition, the commission shall contract with the Office of the State Architect for materials and services that cannot be performed by its staff.
(g)Cash awards to authors of the winning designs shall be made on the following basis:
Using the criteria in subdivision (e) of this section, the judging panel shall select, as follows:
(1)The most outstanding design statewide selected from among the first place winners in either of two single-family categories in any of the six climate zones which shall receive the State Solar Medallion Award and five thousand dollars ($5,000) in addition to the cash award specified in paragraph (3) of this subdivision.
(2)The most outstanding design statewide selected from among the first place winners in either of the two multifamily categories in any of the six climate zones which shall receive the State Solar Medallion Award and five thousand dollars ($5,000) in addition to the cash award specified in paragraph (3) of this subdivision.
(3)The first place designs in each of the four competition categories within each of the six climate zones, which shall each receive a cash award of five thousand dollars ($5,000).
(4)The second place designs in each of the four competition categories within each of the six climate zones, which shall each receive a cash award of two thousand dollars ($2,000).
SEC. 27.
Section 25605 of the Public Resources Code is amended to read:25605.
On or before November 1, 1978, the commission shall develop and adopt, in cooperation with affected industry and consumer representatives, and after one or more public hearings, regulations governing solar devices. The regulations shall be designed to encourage the development and use of solar energy and to provide maximum information to the public concerning solar devices. The regulations may include, but need not be limited to, any or all of the following:SEC. 28.
Chapter 7.7 (commencing with Section 25678) of Division 15 of the Public Resources Code is repealed.SEC. 29.
Chapter 7.9 (commencing with Section 25695) of Division 15 of the Public Resources Code is repealed.SEC. 30.
Section 25795 of the Public Resources Code is amended to read:25795.
(a) Beginning on January 31, 2023, and on May 1, August 1, and December 1 annually thereafter, theSEC. 31.
Section 25803 of the Public Resources Code is amended to read:25803.
SEC. 32.
Section 25805 of the Public Resources Code is repealed.On July 1, 1983, all funds in the State Energy Resources Conservation and Development Reserve Account shall be transferred to the Energy Resources Programs Account.
SEC. 33.
Section 25806 of the Public Resources Code is amended to read:25806.
(a) A person who submits to the commission an application for certification under Chapter 6 (commencing with Section 25500) or Chapter 6.2 (commencing with Section 25545) shall submit with the application a fee of two hundred fifty thousand dollars ($250,000) plus five hundred dollars ($500) per megawatt of gross generating capacity or per megawatthour of gross energy storage capacity, as applicable, or seventy cents ($0.70) per square foot for a facility described in paragraphSEC. 34.
Section 25901 of the Public Resources Code is amended to read:25901.
(a) Within 30 days after the commission issues its determination on any matter specified in this division, except as provided in Section 25531, any aggrieved person may file with the superior court a petition for a writ of mandate for review thereof. Failure to file such an action does not preclude a person from challenging the reasonableness and validity of a decision in any judicial proceedings brought to enforce the decision or to obtain other civil remedies.(d)The amendment of this section made at the 1989–90 Regular Session of the Legislature does not constitute a change in, but is declaratory of, existing law.
SEC. 35.
Section 25953 of the Public Resources Code is amended to read:25953.
As used in this chapter, the following terms have the following meanings:SEC. 36.
Section 454.53 of the Public Utilities Code is amended to read:454.53.
(a) It is the policy of the state that eligible renewable energy resources and zero-carbon resources supply 90 percent of all retail sales of electricity to California end-use customers by December 31, 2035, 95 percent of all retail sales of electricity to California end-use customers by December 31, 2040, 100 percent of all retail sales of electricity to California end-use customers by December 31, 2045, and 100 percent of electricity procured to serve all state agencies by December 31, 2035. The achievement of this policy for California shall not increase carbon emissions elsewhere in the western grid and shall not allow resource shuffling. The commission and Energy Commission, in consultation with the State Air Resources Board, shall take steps to ensure that a transition to a zero-carbon electric system for the State of California does not cause or contribute to greenhouse gas emissions increases elsewhere in the western grid, and is undertaken in a manner consistent with clause 3 of Section 8 of Article I of the United States Constitution. The commission, the Energy Commission, the State Air Resources Board, and all other state agencies shall incorporate this policy into all relevant planning.(1)Use programs authorized under existing statutes to achieve the policy described in subdivision (a).
(2)In consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter. The joint report shall include all of the following:
(A)A review of the policy described in subdivision (a) focused on technologies, forecasts, then-existing transmission, and maintaining safety, environmental and public safety protection, affordability, and system and local reliability.
(B)An evaluation identifying the potential benefits and impacts on system and local reliability associated with achieving the policy described in subdivision (a).
(C)An evaluation identifying the nature of any anticipated financial costs and benefits to electric, gas, and water utilities, including customer rate impacts and benefits.
(D)The barriers to, and benefits of, achieving the policy described in subdivision (a).
(E)Alternative scenarios in which the policy described in subdivision (a) can be achieved and the estimated costs and benefits of each scenario.
(3)On or before December 1, 2023, and annually thereafter, in consultation with California balancing authorities, as defined in subdivision (d) of Section 399.12, and as part of, or an interim addendum to, the quadrennial joint report required by paragraph (2), as applicable, issue a joint reliability progress report that reviews system and local reliability within the context of the policy described in subdivision (a), with a particular focus on summer reliability. The joint reliability progress report shall identify challenges and gaps, if any, to achieving system and local reliability and identify the amount and cause of any delays to achieving compliance with all energy and capacity procurement requirements set by the commission.
(e)
(f)
SEC. 37.
Section 779.1 of the Public Utilities Code is amended to read:779.1.
(a) Every electrical, gas, heat, or water corporation shall allow every residential customer at least 19 days from the date of mailing its bill for services, postage prepaid, or the date of electronic mailing to customers who have opted to receive electronic communications from the corporation, for payment of the charges demanded. A corporation subject to this section shall not terminate residential service for nonpayment of a delinquent account unless the corporation first gives notice of the delinquency and impending termination, at least 10 days(1)
(2)
(3)
(4)
(5)
(6)
(7)
(8)
All
SEC. 8.SEC. 38.
Section 910.4 of the Public Utilities Code is amended to read:910.4.
By February 1 of each year, the commission shall report to the Joint Legislative Budget Committee and appropriate fiscal and policy committees of the Legislature, on all sources and amounts of funding and actual and proposed expenditures, both in the two prior fiscal years and for the proposed fiscal year, including any costs to ratepayers, related to all of the following:SEC. 9.SEC. 39.
Section 913.11 is added to the Public Utilities Code, to read:913.11.
(a) Notwithstanding Section 10231.5 of the Government Code, the commission, Energy Commission, and State Air Resources Board shall, in consultation with all California balancing authorities, as defined in subdivision (d) of Section 399.12, as part of a public process, issue a joint report to the Legislature by January 1, 2021, and at least every four years thereafter.Notwithstanding Section 10231.5 of the Government Code, the commission, in coordination with the Energy Commission, the Independent System Operator, and the Department of Water Resources, shall annually submit a report to the Legislature on the status of new resource additions and revisions to the state’s electric demand forecast and the impact of these new resource additions and revisions to the forecast on the need for keeping the Diablo Canyon powerplant online.
SEC. 11.SEC. 40.
Section 913.17 is added to the Public Utilities Code, to read:913.17.
Notwithstanding Section 10231.5 of the Government Code, on or before December 1, 2023, and annually thereafter, the commission, in consultation with California balancing authorities, as defined in subdivision (d) of Section 399.12, and as part of, or an interim addendum to, the quadrennial joint report required pursuant to Section 913.11, as applicable, shall issue a joint reliability progress report that reviews system and local reliability within the context of the policy described in subdivision (a) of Section 454.53, with a particular focus on summer reliability. The joint reliability progress report shall identify challenges and gaps, if any, to achieving system and local reliability and identify the amount and cause of any delays to achieving compliance with all energy and capacity procurement requirements set by the commission.(a)The department, in consultation with the commission, shall implement projects, purchases, and contracts to carry out the purposes of Chapter 8.9 (commencing with Section 25790) of Division 15 of the Public Resources Code, including, but not limited to, the Distributed Electricity Backup Assets Program and the Demand Side Grid Support Program.
(b)(1)In furtherance of subdivision (a) and notwithstanding any other law, the department may construct, own and operate, or contract for the construction and operation of, contract for the purchase of electricity from, or finance through loans, reimbursement agreements, or other contracts actions to secure resources
for summer reliability or to preserve the option to extend the life of only the following facilities:
(A)Extension of the operating life of existing nonnuclear generating facilities planned for retirement.
(B)New emergency and temporary power generators of five megawatts or more. If a generator is operated using diesel fuel, the department shall not operate it after July 31, 2023.
(C)New energy storage systems that are located outside of the coastal zone and the jurisdiction of the San Francisco Bay Conservation and Development Commission, of 20 megawatts or more, that are capable of discharging for at least two hours, and with an operational date no later than December 31, 2024.
(D)Generation facilities that are located outside of the coastal zone and the jurisdiction of the San Francisco Bay Conservation and Development Commission and use clean, zero-emission fuel technology of any size to produce electricity.
(E)Supporting the development of zero-emission generation capacity with a point of interconnection at a California balancing authority, with the majority of its capacity contracted for by a load-serving entity that has a service area primarily in California, with an operational date no later than December 31, 2024. For purposes of this subparagraph, only a facility with a net qualifying capacity of at least 50 percent of its nameplate capacity, as estimated at 8:00 p.m. on a date in September, shall be eligible.
(2)In furtherance of subdivision (a) of Section 80700, the department may reimburse electrical corporations, as defined in Section 218 of the Public Utilities Code, for the value of imported energy or import capacity products that was (A) delivered or capable of being delivered between July 1, 2022, and on or before September 30, 2022, and (B) was procured at above-market costs or in excess of procurement authorizations set by the Public Utilities Commission and above the requirements needed to serve its bundled customers in support of summer electric service reliability.
(c)Facilities constructed by the department or under a contract with the department pursuant to this division that use any form of fossil fuel shall only operate as necessary to respond to extreme events, as defined in subdivision (b) of Section 25790.5 of the Public Resources Code, and shall not
operate at any other time.
(d)Facilities constructed by the department or under a contract with the department pursuant to this division shall not constitute State Water Resources Development System facilities under Chapter 8 (commencing with Section 12930) of Part 6 of Division 6.
(e)(1)The department shall consult with the commission, the Public Utilities Commission, the Independent System Operator or other applicable California balancing authorities, and the State Air Resources Board in carrying out the purposes of this division.
(2)Beginning October 1, 2022, and at least every three months thereafter, the department shall provide an update on the investments made and being considered into the strategic reliability reserve at a commission business meeting. The President of the Public Utilities Commission or the president’s designee and the President of the Independent System Operator or the president’s designee shall attend the presentation.
(3)The department shall prioritize investments that do not compete with generating facilities already planned for development and disclosed by load-serving entities or local publicly owned electric utilities.
(4)In fulfilling the requirements of this division to achieve electricity reliability, the department shall prioritize investments in feasible, cost-effective zero-emission resources, and then feasible, cost-effective conventional resources.
(f)The department
shall develop, execute, and implement contracts covering power generation, operation and maintenance, fuel management, site leases, power settlements, invoice verification, billing, and other associated items. The department shall also enter into contracts for external services to provide specialized expertise.
(g)(1)Contracts entered into pursuant to this division, amendments to those contracts during their terms, or contracts for services reasonably related to those contracts, and entered on or before December 31, 2023, shall not be subject to competitive bidding or any other state contracting requirements, shall not require the review, consent, or approval of the Department of General Services or any other state department or agency, and are not subject to the requirements of the State Contracting Manual,
the Public Contract Code, or the personal services contracting requirements of Article 4 (commencing with Section 19130) of Chapter 5 of Part 2 of Division 5 of Title 2 of the Government Code.
(2)This subdivision shall not apply to any contract, grant, or loan entered into for purposes of this chapter that does not directly contribute to electrical grid reliability by October 31, 2027.
(3)This subdivision is inoperative December 1, 2026.
(h)For contracts entered into pursuant to this division, amendments to those contracts during their terms, or contracts for services reasonably related to those contracts, and executed after December 31, 2023, Sections 10295, 10297, and 10340 of the Public Contact Code
do not apply to a contract that meets the conditions established by the department for those contracts.
(i)For contracts entered into pursuant to this division by the department after October 31, 2022, the department shall notify the commission through an investment plan of the terms, costs, and scope at a commission business meeting and the commission shall consider the investment plan for approval in a meeting held consistent with the terms of Chapter 3 (commencing with Section 25200) of Division 15 of the Public Resources Code. No less than 10 days after the commission approves the investment plan, the executive director of the commission shall give written notice to the Joint Legislative Budget Committee of the action.
(j)A contract entered into, or an approval granted by, the department
pursuant to this division is not subject to the California Environmental Quality Act (Division 13 (commencing with Section 21000) of the Public Resources Code) and regulations adopted
pursuant to that act.
(k)The department may adopt guidelines to implement this division. The Administrative Procedure Act (Chapter 3.5 (commencing with Section 11340) of Part 1 of Division 3 of Title 2 of the Government Code) does not apply to any regulation or guidelines adopted by the department pursuant to this division.
SEC. 13.SEC. 41.
Section 80730 of the Water Code is amended to read:80730.
(a) Beginning on January 31, 2023, and every May 1, August 1, and December 1 annually thereafter, the department shall issue a written report to the Joint Legislative Budget Committee, detailing the actions undertaken by the department in the period since the previous report was submitted pursuant to this division and up until that date, including, but not limited to, all of the following:The Legislature finds and declares that a special statute is necessary and that a general statute cannot be made applicable within the meaning of Section 16 of Article IV of the California Constitution because of the unique circumstances impacting the Diablo Canyon powerplant, as described in Chapter 6.3 (commencing with Section 25548) of Division 15 of the Public Resources Code.
No reimbursement is required by this act pursuant to Section 6 of Article XIII B of the California Constitution because the only costs that may be incurred by a local agency or school district will be incurred because this act creates a new crime or infraction, eliminates a crime or infraction, or changes the penalty for a crime or infraction, within the meaning of Section 17556 of the Government Code, or changes the definition of a crime within the meaning of Section 6 of Article XIII B of the California Constitution.
This act is an urgency statute necessary for the immediate preservation of the public peace, health, or safety within the meaning of Article IV of the California Constitution and shall go into immediate effect. The facts constituting the necessity are:
In order to ensure the expeditious relicensing of the Diablo Canyon powerplant, which is already underway, does not limit or slow the procurement of additional renewable energy resources, it is necessary for this act to take effect
immediately.