Bill Text: CA AB2748 | 2023-2024 | Regular Session | Enrolled
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Tri-Dam Project: board of directors: meetings.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Passed) 2024-06-26 - Chaptered by Secretary of State - Chapter 26, Statutes of 2024. [AB2748 Detail]
Download: California-2023-AB2748-Enrolled.html
Bill Title: Tri-Dam Project: board of directors: meetings.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Passed) 2024-06-26 - Chaptered by Secretary of State - Chapter 26, Statutes of 2024. [AB2748 Detail]
Download: California-2023-AB2748-Enrolled.html
Enrolled
June 14, 2024 |
Passed
IN
Senate
June 06, 2024 |
Passed
IN
Assembly
April 25, 2024 |
Amended
IN
Senate
May 23, 2024 |
Amended
IN
Assembly
April 03, 2024 |
CALIFORNIA LEGISLATURE—
2023–2024 REGULAR SESSION
Assembly Bill
No. 2748
Introduced by Assembly Member Flora |
February 15, 2024 |
An act to amend Section 21377.5 of the Water Code, relating to irrigation districts.
LEGISLATIVE COUNSEL'S DIGEST
AB 2748, Flora.
Tri-Dam Project: board of directors: meetings.
The Irrigation District Law provides for the formation of irrigation districts with prescribed powers. The law authorizes an irrigation district to control, distribute, store, spread, sink, treat, purify, recapture, and salvage any water, as specified. Existing law requires the board of directors of a district to hold a regular meeting on the first Tuesday of each month at the district office. Existing law authorizes the Board of Directors of the Tri-Dam Project to hold no more than 4 regular meetings annually at the Tri-Dam Project offices located in Strawberry, California.
This bill would instead authorize the board of directors to hold those regular meetings at a Tri-Dam Project office that is located in Sonora, California, or Strawberry, California, or within 30 miles of either city.
The bill would require the board of directors to adopt, at a regular Tri-Dam Project meeting, a resolution that designates Tri-Dam Project office locations.
Digest Key
Vote: MAJORITY Appropriation: NO Fiscal Committee: NO Local Program: NOBill Text
The people of the State of California do enact as follows:
SECTION 1.
Section 21377.5 of the Water Code is amended to read:21377.5.
(a) (1) Notwithstanding Section 21377 of this code or Section 54954 of the Government Code or any other provision of law, the Board of Directors of the Tri-Dam Project, which is composed of the directors of the Oakdale Irrigation District and the South San Joaquin Irrigation District, may hold no more than four regular meetings annually at a Tri-Dam Project office that is located in Sonora, California, or Strawberry, California, or within 30 miles of either city.(2) The Board of Directors of the Tri-Dam Project shall adopt, at a regular Tri-Dam Project meeting, a resolution that designates Tri-Dam Project office locations.
(b) The notice and conduct of these meetings shall comply with the provisions of the Ralph M. Brown Act (Chapter 9 (commencing with Section 54950) of Part 1 of Division 2 of Title 5 of the Government Code).