Bill Text: CA AB401 | 2013-2014 | Regular Session | Amended

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Transportation: design-build: highways.

Spectrum: Slight Partisan Bill (Democrat 3-1)

Status: (Passed) 2013-10-05 - Chaptered by Secretary of State - Chapter 586, Statutes of 2013. [AB401 Detail]

Download: California-2013-AB401-Amended.html
BILL NUMBER: AB 401	AMENDED
	BILL TEXT

	AMENDED IN ASSEMBLY  APRIL 22, 2013
	AMENDED IN ASSEMBLY  APRIL 3, 2013

INTRODUCED BY   Assembly Member Daly

                        FEBRUARY 15, 2013

   An act to add and repeal Chapter 6.5 (commencing with Section
6820) of Part 1 of Division 2 of the Public Contract Code, relating
to highways, and making an appropriation therefor.


	LEGISLATIVE COUNSEL'S DIGEST


   AB 401, as amended, Daly. Public contracts: design-build: State
Highway Route 405.
   Existing law, until January 1, 2014, authorizes certain state and
local transportation entities, if authorized by the California
Transportation Commission, to use a design-build process for
contracts on transportation projects, as specified. Existing law
establishes a procedure for submitting bids that includes a
requirement that design-build entities provide a statement of
qualifications submitted to the transportation entity that is
verified under oath, subject to penalty of perjury.
   This bill  , until January 1, 2018,  would authorize the
Orange County Transportation Authority to utilize design-build
procurement for the Interstate 405 Improvement Project on the state
highway system, subject to commission approval. The bill would
require the Department of Transportation to perform construction
inspection services for the project, as specified. The bill would
require a transportation entity, as defined, awarding a contract for
a public works project pursuant to these provisions, to reimburse the
Department of Industrial Relations for costs of performing
prevailing wage monitoring and enforcement of the public works
project and would require moneys collected to be deposited into the
State Public Works Enforcement Fund, a continuously appropriated
fund. By depositing money in a continuously appropriated fund, the
bill would make an appropriation.
   The bill would make findings and declarations as to the necessity
of a special statute for Orange County.
   Because the bill would extend the use of design-build procurement
to the authority, subject to existing procedures, the bill would, by
extension, impose the statement of qualifications requirement upon
the authority, subject to penalty of perjury, thereby creating a new
crime and imposing a state-mandated local program.
   The California Constitution requires the state to reimburse local
agencies and school districts for certain costs mandated by the
state. Statutory provisions establish procedures for making that
reimbursement.
   This bill would provide that no reimbursement is required by this
act for a specified reason.
   Vote: majority. Appropriation: yes. Fiscal committee: yes.
State-mandated local program: yes.


THE PEOPLE OF THE STATE OF CALIFORNIA DO ENACT AS FOLLOWS:

  SECTION 1.  Chapter 6.5 (commencing with Section 6820) is added to
Part 1 of Division 2 of the Public Contract Code, to read:
      CHAPTER 6.5.  ORANGE COUNTY TRANSPORTATION AUTHORITY
DESIGN-BUILD PROGRAM


   6820.  For purposes of this chapter, the following definitions
apply:
   (a) "Best value" means a value determined by objective criteria,
including, but not limited to, price, features, functions, life-cycle
costs, and other criteria deemed appropriate by the transportation
entity.
   (b) "Commission" means the California Transportation Commission.
   (c) "Design-build" means a procurement process in which both the
design and construction of a project are procured from a single
entity.
   (d) "Design-build entity" means a partnership, corporation, or
other legal entity that is able to provide appropriately licensed
contracting, architectural, and engineering services as needed
pursuant to a design-build contract.
   (e) "Design-build team" means the design-build entity itself and
the individuals and other entities identified by the design-build
entity as members of its team.
   (f) "Department" means the Department of Transportation as
established under Part 5 (commencing with Section 14000) of Division
3 of Title 2 of the Government Code.
   (g) "Transportation entity" means  the department or
 the Orange County Transportation Authority.
   6821.  (a) The Orange County Transportation Authority, if
authorized by the commission, may utilize design-build procurement
for the Interstate 405 Improvement Project on the state highway
system.
   (b) Notwithstanding any other provision of this chapter, the
department shall perform construction inspection services for the
project authorized pursuant to this subdivision. Department
construction inspection services for the project authorized pursuant
to this subdivision include, but are not limited to, surveying,
material source testing, certification testing, monitoring of
environmental compliance, independent quality control testing and
inspection, and quality assurance audits. The department construction
inspection duties and responsibilities shall include a direct
reporting relationship between the inspectors and senior department
engineers responsible for all inspectors and construction inspection
services. The senior department engineer responsible for construction
inspection services shall be responsible for the acceptance or
rejection of the work.
   (c) Notwithstanding any other law, the department shall retain the
authority to stop the contractor's operation wholly or in part and
take appropriate action when public safety is jeopardized. The
department shall ensure that public safety and convenience is
maintained whenever work is performed under an encroachment permit
within the state highway right-of-way, including, but not limited to,
work performed that includes lane closures, signing, work performed
at night, detours, dust control, temporary pavement quality, crash
cushions, temporary railings, pavement transitions, falsework,
shoring, and delineation. The department shall regularly inspect the
job sites for safety compliance and any possible deficiencies. If any
deficiency is observed, a written notice shall be sent by the
department to the Orange County Transportation Authority's designated
resident engineer to correct the deficiency. Once the deficiency is
corrected, a written notice describing the resolution of the
deficiency shall be sent to the department and documented.
   (d) The department shall use department employees or consultants
under contract with the department to perform the services described
in subdivisions  (a) and (b),   (b) and (c),
 consistent with Article XXII of the California Constitution.
Department employee and consultant resources necessary for the
performance of those services, including personnel requirements,
shall be included in the department's capital outlay support program
for workload purposes in the annual Budget Act.
   (e) (1) Not later than the first day of July that occurs two years
after a design-build contract is awarded, and each July 1 thereafter
until the project is completed, the Orange County Transportation
Authority shall submit a report on the progress of the project and
compliance with this section to the legislative policy committees
having jurisdiction over transportation matters.
   (2) The requirement of submitting a report imposed under paragraph
(1) is inoperative on the first day of July four years after the
first report was submitted, pursuant to Section 10231.5 of the
Government Code.
   (3) A report to be submitted pursuant to paragraph (1) shall be
submitted in compliance with Section 9795 of the Government Code.
   6822.  The commission shall develop guidelines for a standard
organizational conflict-of-interest policy, consistent with
applicable law, regarding the ability of a person or entity, that
performs services for the transportation entity relating to the
solicitation of a design-build project, to submit a proposal as a
design-build entity, or to join a design-build team. This
conflict-of-interest policy shall apply to each transportation entity
entering into design-build contracts authorized under this chapter.
   6823.  (a) For contracts for public works projects awarded prior
to the effective date of the regulations adopted by the Department of
Industrial Relations pursuant to subdivision (g) of Section 1771.5
of the Labor Code, a transportation entity authorized to use the
design-build method of procurement shall establish and enforce a
labor compliance program containing the requirements outlined in
Section 1771.5 of the Labor Code or shall contract with a third party
to operate a labor compliance program containing the requirements
outlined in Section 1771.5 of the Labor Code. This requirement shall
not apply to projects where the transportation entity or design-build
entity has entered into any collective bargaining agreement that
binds all of the contractors performing work on the projects.
   (b) For contracts for public works projects awarded on or after
the effective date of the regulations adopted by the Department of
Industrial Relations pursuant to subdivision (g) of Section 1771.5 of
the Labor Code, the transportation entity shall reimburse the
Department of Industrial Relations for its reasonable and directly
related costs of performing prevailing wage monitoring and
enforcement on public works projects pursuant to rates established by
the Department of Industrial Relations as set forth in subdivision
(h) of Section 1771.5 of the Labor Code. All moneys collected
pursuant to this subdivision shall be deposited in the State Public
Works Enforcement Fund, created by Section 1771.3 of the Labor Code,
and shall be used only for enforcement of prevailing wage
requirements on those projects.
   (c) In lieu of reimbursing the Department of Industrial Relations
for its reasonable and directly related costs of performing
monitoring and enforcement on public works projects, the
transportation entity may elect to continue operating an existing
previously approved labor compliance program to monitor and enforce
prevailing wage requirements on the project if it has either not
contracted with a third party to conduct its labor compliance program
and requests and receives approval from the department to continue
its existing program or it enters into a collective bargaining
agreement that binds all of the contractors performing work on the
project and that includes a mechanism for resolving disputes about
the payment of wages.
   6824.  The procurement process for the design-build project shall
progress as follows:
   (a) The transportation entity shall prepare a set of documents
setting forth the scope and estimated price of the project. The
documents may include, but need not be limited to, the size, type,
and desired design character of the project, performance
specifications covering the quality of materials, equipment,
workmanship, preliminary plans, and any other information deemed
necessary to describe adequately the transportation entity's needs.
The performance specifications and any plans shall be prepared by a
design professional who is duly licensed and registered in
California.
   (b) Based on the documents prepared as described in subdivision
(a), the transportation entity shall prepare a request for proposals
that invites interested parties to submit competitive sealed
proposals in the manner prescribed by the transportation entity. The
request for proposals shall include, but need not be limited to, the
following elements:
   (1) Identification of the basic scope and needs of the project or
contract, the estimated cost of the project, the methodology that
will be used by the transportation entity to evaluate proposals,
whether the contract will be awarded on the basis of the lowest
responsible bid or on best value, and any other information deemed
necessary by the transportation entity to inform interested parties
of the contracting opportunity.
   (2) Significant factors that the transportation entity reasonably
expects to consider in evaluating proposals, including, but not
limited to, cost or price and all nonprice-related factors.
   (3) The relative importance or the weight assigned to each of the
factors identified in the request for proposals.
   (4) For transportation entities authorized to utilize best value
as a selection method, the transportation entity reserves the right
to request proposal revisions and hold discussions and negotiations
with responsive bidders and shall so specify in the request for
proposals and shall publish separately or incorporate into the
request for proposals applicable rules and procedures to be observed
by the transportation entity to ensure that any discussions or
negotiations are conducted in good faith.
   (c) Based on the documents prepared under subdivision (a), the
transportation entity shall prepare and issue a request for
qualifications in order to prequalify the design-build entities whose
proposals shall be evaluated for final selection. The request for
qualifications shall include, but need not be limited to, the
following elements:
   (1) Identification of the basic scope and needs of the project or
contract, the expected cost range, the methodology that will be used
by the transportation entity to evaluate proposals, the procedure for
final selection of the design-build entity, and any other
information deemed necessary by the transportation entity to inform
interested parties of the contracting opportunity.
   (2) (A) Significant factors that the transportation entity
reasonably expects to consider in evaluating qualifications,
including technical design and construction expertise, skilled labor
force availability, and all other nonprice-related factors.
   (B) For purposes of subparagraph (A), skilled labor force
availability shall be determined by the existence of an agreement
with a registered apprenticeship program, approved by the California
Apprenticeship Council, that has graduated at least one apprentice in
each of the preceding five years. This graduation requirement shall
not apply to programs providing apprenticeship training for any craft
that was first deemed by the Department of Labor and the Department
of Industrial Relations to be an apprenticeable craft within the five
years prior to the effective date of this article.
   (3) A standard form request for statements of qualifications
prepared by the transportation entity. In preparing the standard
form, the transportation entity may consult with the construction
industry, the building trades and surety industry, and other public
agencies interested in using the authorization provided by this
chapter. The standard form shall require information including, but
not limited to, all of the following:
   (A) If the design-build entity is a partnership, limited
partnership, joint venture, or other association, a listing of all of
the partners, general partners, or association members known at the
time of statement of qualification submission who will participate in
the design-build contract.
   (B) Evidence that the members of the design-build entity have
completed, or demonstrated the experience, competency, capability,
and capacity to complete projects of similar size, scope, or
complexity, and that proposed key personnel have sufficient
experience and training to competently manage and complete the design
and construction of the project, and a financial statement that
assures the transportation entity that the design-build entity has
the capacity to complete the project.
   (C) The licenses, registration, and credentials required to design
and construct the project, including, but not limited to,
information on the revocation or suspension of any license,
credential, or registration.
   (D) Evidence that establishes that the design-build entity has the
capacity to obtain all required payment and performance bonding,
liability insurance, and errors and omissions insurance.
   (E) Information concerning workers' compensation experience
history and a worker safety program.
   (F) A full disclosure regarding all of the following that are
applicable:
   (i) Any serious or willful violation of Part 1 (commencing with
Section 6300) of Division 5 of the Labor Code or the federal
Occupational Safety and Health Act of 1970 (Public Law 91-596),
settled against any member of the design-build entity.
   (ii) Any debarment, disqualification, or removal from a federal,
state, or local government public works project.
   (iii) Any instance where the design-build entity, or its owners,
officers, or managing employees submitted a bid on a public works
project and were found to be nonresponsive or were found by an
awarding body not to be a responsible bidder.
   (iv) Any instance where the design-build entity, or its owners,
officers, or managing employees defaulted on a construction contract.

   (v) Any violations of the Contractors' State License Law, as
described in Chapter 9 (commencing with Section 7000) of Division 3
of the Business and Professions Code, including alleged violations of
federal or state law regarding the payment of wages, benefits,
apprenticeship requirements, or personal income tax withholding, or
Federal Insurance Contribution Act (FICA) withholding requirements
settled against any member of the design-build entity.
   (vi) Any bankruptcy or receivership of any member of the
design-build entity, including, but not limited to, information
concerning any work completed by a surety.
   (vii) Any settled adverse claims, disputes, or lawsuits between
the owner of a public works project and any member of the
design-build entity during the five years preceding submission of a
bid under this article, in which the claim, settlement, or judgment
exceeds fifty thousand dollars ($50,000). Information shall also be
provided concerning any work completed by a surety during this
five-year period.
   (G) If the proposed design-build entity is a partnership, limited
partnership, joint-venture, or other association, a copy of the
organizational documents or agreement committing to form the
organization, and a statement that all general partners, joint
venture members, or other association members agree to be fully
liable for the performance under the design-build contract.
   (H) An acceptable safety record. A bidder's safety record shall be
deemed acceptable if its experience modification rate for the most
recent three-year period is an average of 1.00 or less, and its
average total recordable injury/illness rate and average lost work
rate for the most recent three-year period does not exceed the
applicable statistical standards for its business category or if the
bidder is a party to an alternative dispute resolution system as
provided for in Section 3201.5 of the Labor Code.
   (4) The information required under this subdivision shall be
verified under oath by the design-build entity and its members in the
manner in which civil pleadings in civil actions are verified.
Information required under this subdivision that is not a public
record under the California Public Records Act, as described in
Chapter 3.5 (commencing with Section 6250) of Division 7 of Title 1
of the Government Code, shall not be open to public inspection.
   (d) For those projects utilizing low bid as the final selection
method, the competitive bidding process shall result in lump-sum bids
by the prequalified design-build entities. Awards shall be made to
the lowest responsible bidder.
   (e) For those projects utilizing best value as a selection method,
the design-build competition shall progress as follows:
   (1) Competitive proposals shall be evaluated by using only the
criteria and selection procedures specifically identified in the
request for proposals. However, the following minimum factors shall
be weighted as deemed appropriate by the contracting transportation
entity:
   (A) Price.
   (B) Technical design and construction expertise.
   (C) Life-cycle costs over 15 years or more.
   (2) Pursuant to subdivision (b), the transportation entity may
hold discussions or negotiations with responsive bidders using the
process articulated in the transportation entity's request for
proposals.
   (3) When the evaluation is complete, the top three responsive
bidders shall be ranked sequentially based on a determination of
value provided.
   (4) The award of the contract shall be made to the responsible
bidder whose proposal is determined by the transportation entity to
have offered the best value to the public.
   (5) Notwithstanding any other provision of this code, upon
issuance of a contract award, the transportation entity shall
publicly announce its award, identifying the contractor to whom the
award is made, along with a written decision supporting its contract
award and stating the basis of the award. The notice of award shall
also include the transportation entity's second- and third-ranked
design-build entities.
   (6) The written decision supporting the transportation entity's
contract award, described in paragraph (5), and the contract file
shall provide sufficient information to satisfy an external audit.
   6825.  (a) The design-build entity shall provide payment and
performance bonds for the project in the form and in the amount
required by the transportation entity, and issued by a California
admitted surety. In no case shall the amount of the payment bond be
less than the amount of the performance bond.
   (b) The design-build contract shall require errors and omissions
insurance coverage for the design elements of the project.
   6826.  (a) The transportation entity, in each design-build request
for proposals, may identify specific types of subcontractors that
must be included in the design-build entity statement of
qualifications and proposal. All construction subcontractors that are
identified in the proposal shall be afforded all the protections of
Chapter 4 (commencing with Section 4100) of Part 1 of Division 2.
   (b) In awarding subcontracts not listed in the request for
proposals, the design-build entity shall do all of the following:
   (1) Provide public notice of availability of work to be
subcontracted in accordance with the publication requirements
applicable to the competitive bidding process of the transportation
entity.
   (2) Provide a fixed date and time on which the subcontracted work
will be awarded.
   (3) Establish reasonable qualification criteria and standards.
   (4) Provide that the subcontracted construction work shall be
awarded either on a best value basis or to the lowest responsible
bidder. For construction work awarded on a best value basis, the
design-build entity shall evaluate all bids utilizing the factors
described in paragraph (1) of subdivision (e) of Section 6824, and
shall award the contract to the bidder determined by the design-build
entity to have offered the best value.
   (c) Subcontractors awarded subcontracts under this chapter shall
be afforded all the protections of Chapter 4 (commencing with Section
4100) of Part 1 of Division 2.
   6827.  Nothing in this chapter affects, expands, alters, or limits
any rights or remedies otherwise available at law.
   6828.  The provisions of this chapter are severable. If any
provision of this chapter or its application is held invalid, that
invalidity shall not affect other provisions or applications that can
be given effect without the invalid provision or application.
   6829.  This chapter shall remain in effect only until January 1,
2018, and as of that date is repealed, unless a later enacted
statute, that is enacted before January 1, 2018, deletes or extends
that date.
  SEC. 2.  The Legislature finds and declares that a special law is
necessary and that a general law cannot be made applicable within the
meaning of Section 16 of Article IV of the California Constitution
because of the unique need to build and improve highways located in
the County of Orange in a cost-effective manner.
  SEC. 3.  No reimbursement is required by this act pursuant to
Section 6 of Article XIII B of the California Constitution because
the only costs that may be incurred by a local agency or school
district will be incurred because this act creates a new crime or
infraction, eliminates a crime or infraction, or changes the penalty
for a crime or infraction, within the meaning of Section 17556 of the
Government Code, or changes the definition of a crime within the
meaning of Section 6 of Article XIII B of the California
Constitution.                    
feedback