CT SB01090 | 2025 | General Assembly
Status
Spectrum: Partisan Bill (Democrat 1-0)
Status: Introduced on January 22 2025 - 25% progression
Action: 2025-01-22 - Referred to Joint Committee on Transportation
Pending: Joint Transportation Committee
Text: Latest bill text (Introduced) [PDF]
Status: Introduced on January 22 2025 - 25% progression
Action: 2025-01-22 - Referred to Joint Committee on Transportation
Pending: Joint Transportation Committee
Text: Latest bill text (Introduced) [PDF]
Summary
To study the feasibility of installing pipes or tunnels underneath the Long Island Sound.
Title
An Act Studying The Feasibility Of Installing Pipes For Utility Or Fiber-optic Wiring Or Building A Tunnel Underneath The Long Island Sound.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2025-01-22 | Senate | Referred to Joint Committee on Transportation |
Connecticut State Sources
Type | Source |
---|---|
Summary | https://www.cga.ct.gov/asp/cgabillstatus/cgabillstatus.asp?selBillType=Bill&bill_num=SB01090&which_year=2025 |
Text | https://www.cga.ct.gov/2025/TOB/S/PDF/2025SB-01090-R00-SB.PDF |