Bill Text: FL S0768 | 2013 | Regular Session | Comm Sub
Bill Title: Everglades Improvement and Management
Spectrum: Bipartisan Bill
Status: (Introduced - Dead) 2013-04-24 - Laid on Table, companion bill(s) passed, see CS/HB 7065 (Ch. 2013-59), SB 1502 (Ch. 2013-41) [S0768 Detail]
Download: Florida-2013-S0768-Comm_Sub.html
Florida Senate - 2013 CS for SB 768 By the Committee on Environmental Preservation and Conservation; and Senator Simpson 592-02851-13 2013768c1 1 A bill to be entitled 2 An act relating to Everglades improvement and 3 management; amending s. 373.4592, F.S.; revising 4 legislative findings for achieving water quality 5 goals; revising the definition of the term “Long-Term 6 Plan”; revising provisions for use of certain ad 7 valorem tax proceeds; directing the South Florida 8 Water Management District to complete a specified 9 analysis; revising provisions for collection of the 10 agricultural privilege tax; providing for the use of 11 such tax proceeds; providing that payment of the tax 12 and certain costs fulfills certain constitutional 13 obligations; providing appropriations; providing 14 effective dates. 15 16 Be It Enacted by the Legislature of the State of Florida: 17 18 Section 1. Paragraph (g) of subsection (1), paragraph (j) 19 of subsection (2), paragraphs (d) and (e) of subsection (3), 20 paragraph (a) of subsection (4), and paragraphs (c) and (h) of 21 subsection (6) of section 373.4592, Florida Statutes, are 22 amended, and paragraph (h) is added to subsection (4) of that 23 section, to read: 24 373.4592 Everglades improvement and management.— 25 (1) FINDINGS AND INTENT.— 26 (g) The Legislature finds that the Statement of Principles 27 of July 1993, the Everglades Construction Project, and the 28 regulatory requirements of this section provide a sound basis 29 for the state’s long-term cleanup and restoration objectives for 30 the Everglades. It is the intent of the Legislature to provide a 31 sufficient period of time for construction, testing, and 32 research, so that the benefits of the Long-Term PlanEverglades33Construction Projectwill be determined and maximized prior to 34 requiring additional measures. The Legislature finds that STAs 35 and BMPs are currently the best available technology for 36 achieving theinterimwater quality goals of the Everglades 37 Program and that implementation of BMPs, funded by the owners 38 and users of land in the EAA, effectively reduces nutrients in 39 waters flowing into the Everglades Protection Area. A combined 40 program of agricultural BMPs, STAs, and requirements of this 41 section is a reasonable method of achievinginterimtotal 42 phosphorus discharge reductions. The Everglades Program is an 43 appropriate foundation on which to build a long-term program to 44 ultimately achieve restoration and protection of the Everglades 45 Protection Area. 46 (2) DEFINITIONS.—As used in this section: 47 (j) “Long-Term Plan” or “Plan” means the district’s 48 “Everglades Protection Area Tributary Basins Conceptual Plan for 49 Achieving Long-Term Water Quality Goals Final Report” dated 50 March 2003, as subsequently modified in accordance with 51 paragraph (3)(b), and the district’s “Restoration Strategies 52 Regional Water Quality Plan” dated April 27, 2012, as may be 53 subsequently modified pursuant to paragraph (3)(b)modified54herein. 55 (3) EVERGLADES LONG-TERM PLAN.— 56 (d)The Legislature recognizes that the Long-Term Plan57contains an initial phase and a 10-year second phase.The 58 Legislature intends that a review of this act at least 10 years 59 after implementation of the Long-Term Planinitial phaseis 60 appropriate and necessary to the public interest. The review is 61 the best way to ensure that the Everglades Protection Area is 62 achieving state water quality standards, including phosphorus 63 reduction, and the Long-Term Plan is using the best technology 64 available.A 10-year second phase of the Long-Term Plan must be65approved by the Legislature and codified in this act prior to66implementation of projects, but not prior to development,67review, and approval of projects by the department.68 (e) The Long-Term Plan shall be implementedfor an initial6913-year phase (2003-2016)and shall achieve water quality 70 standards relating to the phosphorus criterion in the Everglades 71 Protection Area as determined by a network of monitoring 72 stations established for this purpose. Not later than December 73 31, 2008, and each 5 years thereafter, the department shall 74 review and approve incremental phosphorus reduction measures. 75 (4) EVERGLADES PROGRAM.— 76 (a) Everglades Construction Project.—The district shall 77 implement the Everglades Construction Project. By the time of 78 completion of the project, the state, district, or other 79 governmental authority shall purchase the inholdings in the 80 Rotenberger and such other lands necessary to achieve a 2:1 81 mitigation ratio for the use of Brown’s Farm and other similar 82 lands, including those needed for the STA 1 Inflow and 83 Distribution Works. The inclusion of public lands as part of the 84 project is for the purpose of treating waters not coming from 85 the EAA for hydroperiod restoration. It is the intent of the 86 Legislature that the district aggressively pursue the 87 implementation of the Everglades Construction Project in 88 accordance with the schedule in this subsection. The Legislature 89 recognizes that adherence to the schedule is dependent upon 90 factors beyond the control of the district, including the timely 91 receipt of funds from all contributors. The district shall take 92 all reasonable measures to complete timely performance of the 93 schedule in this section in order to finish the Everglades 94 Construction Project. The district shall not delay 95 implementation of the project beyond the time delay caused by 96 those circumstances and conditions that prevent timely 97 performance. The district shall not levy ad valorem taxes in 98 excess of 0.1 mill within the Okeechobee Basin for the purposes 99 of the design, construction, and acquisition of the Everglades 100 Construction Project. The ad valorem tax proceeds not exceeding 101 0.1 mill levied within the Okeechobee Basin for such purposes 102 shall also be used for design, construction, and implementation 103of the initial phaseof the Long-Term Plan, including operation 104 and maintenance, and research for the projects and strategies in 105the initial phase ofthe Long-Term Plan, and including the 106 enhancements and operation and maintenance of the Everglades 107 Construction Project and shall be the sole direct district 108 contribution from district ad valorem taxes appropriated or 109 expended for the design, construction, and acquisition of the 110 Everglades Construction Project unless the Legislature by 111 specific amendment to this section increases the 0.1 mill ad 112 valorem tax contribution, increases the agricultural privilege 113 taxes, or otherwise reallocates the relative contribution by ad 114 valorem taxpayers and taxpayers paying the agricultural 115 privilege taxes toward the funding of the design, construction, 116 and acquisition of the Everglades Construction Project. 117 Notwithstanding the provisions of s. 200.069 to the contrary, 118 any millage levied under the 0.1 mill limitation in this 119 paragraph shall be included as a separate entry on the Notice of 120 Proposed Property Taxes pursuant to s. 200.069. Once the STAs 121 are completed, the district shall allow these areas to be used 122 by the public for recreational purposes in the manner set forth 123 in s. 373.1391(1), considering the suitability of these lands 124 for such uses. These lands shall be made available for 125 recreational use unless the district governing board can 126 demonstrate that such uses are incompatible with the restoration 127 goals of the Everglades Construction Project or the water 128 quality and hydrological purposes of the STAs or would otherwise 129 adversely impact the implementation of the project. The district 130 shall give preferential consideration to the hiring of 131 agricultural workers displaced as a result of the Everglades 132 Construction Project, consistent with their qualifications and 133 abilities, for the construction and operation of these STAs. The 134 following milestones apply to the completion of the Everglades 135 Construction Project as depicted in the February 15, 1994, 136 conceptual design document: 137 1. The district must complete the final design of the STA 1 138 East and West and pursue STA 1 East project components as part 139 of a cost-shared program with the Federal Government. The 140 district must be the local sponsor of the federal project that 141 will include STA 1 East, and STA 1 West if so authorized by 142 federal law; 143 2. Construction of STA 1 East is to be completed under the 144 direction of the United States Army Corps of Engineers in 145 conjunction with the currently authorized C-51 flood control 146 project; 147 3. The district must complete construction of STA 1 West 148 and STA 1 Inflow and Distribution Works under the direction of 149 the United States Army Corps of Engineers, if the direction is 150 authorized under federal law, in conjunction with the currently 151 authorized C-51 flood control project; 152 4. The district must complete construction of STA 3/4 by 153 October 1, 2003; however, the district may modify this schedule 154 to incorporate and accelerate enhancements to STA 3/4 as 155 directed in the Long-Term Plan; 156 5. The district must complete construction of STA 6; 157 6. The district must, by December 31, 2006, complete 158 construction of enhancements to the Everglades Construction 159 Project recommended in the Long-Term Plan and initiate other 160 pre-2006 strategies in the plan; and 161 7. East Beach Water Control District, South Shore Drainage 162 District, South Florida Conservancy District, East Shore Water 163 Control District, and the lessee of agricultural lease number 164 3420 shall complete any system modifications described in the 165 Everglades Construction Project to the extent that funds are 166 available from the Everglades Fund. These entities shall divert 167 the discharges described within the Everglades Construction 168 Project within 60 days of completion of construction of the 169 appropriate STA. Such required modifications shall be deemed to 170 be a part of each district’s plan of reclamation pursuant to 171 chapter 298. 172 (h) After completion of all projects and improvements in 173 the Long-Term Plan, the district shall complete a use 174 attainability analysis to determine if those projects and 175 improvements will achieve the water quality based effluent 176 limits established in permits and orders authorizing the 177 operation of those facilities. 178 (6) EVERGLADES AGRICULTURAL PRIVILEGE TAX.— 179 (c) The initial Everglades agricultural privilege tax roll 180 shall be certified for the tax notices mailed in November 1994. 181 Incentive credits to the Everglades agricultural privilege taxes 182 to be included on the initial Everglades agricultural privilege 183 tax roll, if any, shall be based upon the total phosphorus load 184 reduction for the year ending April 30, 1993. The Everglades 185 agricultural privilege taxes for each year shall be computed in 186 the following manner: 187 1. Annual Everglades agricultural privilege taxes shall be 188 charged for the privilege of conducting an agricultural trade or 189 business on each acre of real property or portion thereof. The 190 annual Everglades agricultural privilege tax shall be $24.89 per 191 acre for the tax notices mailed in November 1994 through 192 November 1997; $27 per acre for the tax notices mailed in 193 November 1998 through November 2001; $31 per acre for the tax 194 notices mailed in November 2002 through November 2005; and $35 195 per acre for the tax notices mailed in November 2006 through 196 November 2013. 197 2. It is the intent of the Legislature to encourage the 198 performance of best management practices to maximize the 199 reduction of phosphorus loads at points of discharge from the 200 EAA by providing an incentive credit against the Everglades 201 agricultural privilege taxes set forth in subparagraph 1. The 202 total phosphorus load reduction shall be measured for the entire 203 EAA by comparing the actual measured total phosphorus load 204 attributable to the EAA for each annual period ending on April 205 30 to the total estimated phosphorus load that would have 206 occurred during the 1979-1988 base period using the model for 207 total phosphorus load determinations provided in chapter 40E-63, 208 Florida Administrative Code, utilizing the technical information 209 and procedures contained in Section IV-EAA Period of Record Flow 210 and Phosphorus Load Calculations; Section V-Monitoring 211 Requirements; and Section VI-Phosphorus Load Allocations and 212 Compliance Calculations of the Draft Technical Document in 213 Support of chapter 40E-63, Florida Administrative Code - Works 214 of the District within the Everglades, March 3, 1992, and the 215 Standard Operating Procedures for Water Quality Collection in 216 Support of the Everglades Water Condition Report, dated February 217 18, 1994. The model estimates the total phosphorus load that 218 would have occurred during the 1979-1988 base period by 219 substituting the rainfall conditions for such annual period 220 ending April 30 for the conditions that were used to calibrate 221 the model for the 1979-1988 base period. The data utilized to 222 calculate the actual loads attributable to the EAA shall be 223 adjusted to eliminate the effect of any load and flow that were 224 not included in the 1979-1988 base period as defined in chapter 225 40E-63, Florida Administrative Code. The incorporation of the 226 method of measuring the total phosphorus load reduction provided 227 in this subparagraph is intended to provide a legislatively 228 approved aid to the governing board of the district in making an 229 annual ministerial determination of any incentive credit. 230 3. Phosphorus load reductions calculated in the manner 231 described in subparagraph 2. and rounded to the nearest whole 232 percentage point for each annual period beginning on May 1 and 233 ending on April 30 shall be used to compute incentive credits to 234 the Everglades agricultural privilege taxes to be included on 235 the annual tax notices mailed in November of the next ensuing 236 calendar year. Incentive credits, if any, will reduce the 237 Everglades agricultural privilege taxes set forth in 238 subparagraph 1. only to the extent that the phosphorus load 239 reduction exceeds 25 percent. Subject to subparagraph 4., the 240 reduction of phosphorus load by each percentage point in excess 241 of 25 percent, computed for the 12-month period ended on April 242 30 of the calendar year immediately preceding certification of 243 the Everglades agricultural privilege tax, shall result in the 244 following incentive credits: $0.33 per acre for the tax notices 245 mailed in November 1994 through November 1997; $0.54 per acre 246 for the tax notices mailed in November 1998 through November 247 2001; $0.61 per acre for the tax notices mailed in November 2002 248 through November 2005, and $0.65 per acre for the tax notices 249 mailed in November 2006 through November 2013. The determination 250 of incentive credits, if any, shall be documented by resolution 251 of the governing board of the district adopted prior to or at 252 the time of the adoption of its resolution certifying the annual 253 Everglades agricultural privilege tax roll to the appropriate 254 tax collector. 255 4. Notwithstanding subparagraph 3., incentive credits for 256 the performance of best management practices shall not reduce 257 the minimum annual Everglades agricultural privilege tax to less 258 than $24.89 per acre, which annual Everglades agricultural 259 privilege tax as adjusted in the manner required by paragraph 260 (e) shall be known as the “minimum tax.” To the extent that the 261 application of incentive credits for the performance of best 262 management practices would reduce the annual Everglades 263 agricultural privilege tax to an amount less than the minimum 264 tax, then the unused or excess incentive credits for the 265 performance of best management practices shall be carried 266 forward, on a phosphorus load percentage basis, to be applied as 267 incentive credits in subsequent years. Any unused or excess 268 incentive credits remaining after certification of the 269 Everglades agricultural privilege tax roll for the tax notices 270 mailed in November 2013 shall be canceled. 271 5. Notwithstanding the schedule of Everglades agricultural 272 privilege taxes set forth in subparagraph 1., the owner, lessee, 273 or other appropriate interestholder of any property shall be 274 entitled to have the Everglades agricultural privilege tax for 275 any parcel of property reduced to the minimum tax, commencing 276 with the tax notices mailed in November 1996 for parcels of 277 property participating in the early baseline option as defined 278 in chapter 40E-63, Florida Administrative Code, and with the tax 279 notices mailed in November 1997 for parcels of property not 280 participating in the early baseline option, upon compliance with 281 the requirements set forth in this subparagraph. The owner, 282 lessee, or other appropriate interestholder shall file an 283 application with the executive director of the district prior to 284 July 1 for consideration of reduction to the minimum tax on the 285 Everglades agricultural privilege tax roll to be certified for 286 the tax notice mailed in November of the same calendar year and 287 shall have the burden of proving the reduction in phosphorus 288 load attributable to such parcel of property. The phosphorus 289 load reduction for each discharge structure serving the parcel 290 shall be measured as provided in chapter 40E-63, Florida 291 Administrative Code, and the permit issued for such property 292 pursuant to chapter 40E-63, Florida Administrative Code. A 293 parcel of property which has achieved the following annual 294 phosphorus load reduction standards shall have the minimum tax 295 included on the annual tax notice mailed in November of the next 296 ensuing calendar year: 30 percent or more for the tax notices 297 mailed in November 1994 through November 1997; 35 percent or 298 more for the tax notices mailed in November 1998 through 299 November 2001; 40 percent or more for the tax notices mailed in 300 November 2002 through November 2005; and 45 percent or more for 301 the tax notices mailed in November 2006 through November 2013. 302 In addition, any parcel of property that achieves an annual flow 303 weighted mean concentration of 50 parts per billion (ppb) of 304 phosphorus at each discharge structure serving the property for 305 any year ending April 30 shall have the minimum tax included on 306 the annual tax notice mailed in November of the next ensuing 307 calendar year. Any annual phosphorus reductions that exceed the 308 amount necessary to have the minimum tax included on the annual 309 tax notice for any parcel of property shall be carried forward 310 to the subsequent years’ phosphorus load reduction to determine 311 if the minimum tax shall be included on the annual tax notice. 312 The governing board of the district shall deny or grant the 313 application by resolution adopted prior to or at the time of the 314 adoption of its resolution certifying the annual Everglades 315 agricultural privilege tax roll to the appropriate tax 316 collector. 317 6. The annual Everglades agricultural privilege tax shall 318 be: for the tax notices mailed in November 2014 through November 319 2026,2016shall be$25 per acre; for the tax notices mailed in 320 November 2027 through 2029, $20 per acre; for the tax notices 321 mailed in November 2030 through 2035, $15 per acre; and for the 322 tax notices mailed in November 20362017and thereafter,shall323be$10 per acre. Proceeds from the tax shall be used for design, 324 construction, and implementation of the Long-Term Plan, 325 including operation and maintenance, and research for the 326 projects and strategies in the Long-Term Plan, including the 327 enhancements and operation and maintenance of the Everglades 328 Construction Project. 329 (h) In recognition of the findings set forth in subsection 330 (1), the Legislature finds that the assessment and use of the 331 Everglades agricultural privilege tax is a matter of concern to 332 all areas of Florida.andThe Legislature intends this act to be 333 a general law authorization of the Everglades agricultural 334 privilege tax within the meaning of s. 9, Art. VII of the State 335 Constitution and further intends that payment of the tax, in 336 addition to payment of the cost of continuing implementation of 337 BMPs, fulfillscomplies withthe obligations of owners and users 338 of land under s. 7(b), Art. II of the State Constitution. 339 Section 2. Beginning in the 2013-2014 fiscal year and each 340 year thereafter through the 2023-2024 fiscal year, the sum of 341 $12 million in recurring general revenue funds and $20 million 342 in recurring funds from the Water Management Lands Trust Fund is 343 appropriated to the Department of Environmental Protection for 344 the Restoration Strategies Regional Water Quality Plan. This 345 section shall take effect July 1, 2013. 346 Section 3. Except as otherwise expressly provided in this 347 act, this act shall take effect upon becoming a law.