Bill Text: FL S1532 | 2024 | Regular Session | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Mitigation
Spectrum: Slight Partisan Bill (? 3-1)
Status: (Passed) 2024-05-07 - Chapter No. 2024-144 [S1532 Detail]
Download: Florida-2024-S1532-Introduced.html
Bill Title: Mitigation
Spectrum: Slight Partisan Bill (? 3-1)
Status: (Passed) 2024-05-07 - Chapter No. 2024-144 [S1532 Detail]
Download: Florida-2024-S1532-Introduced.html
Florida Senate - 2024 SB 1532 By Senator Brodeur 10-01364-24 20241532__ 1 A bill to be entitled 2 An act relating to mitigation; reordering and amending 3 s. 373.403, F.S.; defining the term “sponsor”; making 4 technical changes; s. 373.4134, F.S.; revising 5 legislative findings; revising the entities to and 6 purposes for which water quality enhancement credits 7 may be sold; requiring the Department of Environmental 8 Protection or water management districts to authorize 9 the sale and use of such credits to applicants, rather 10 than to governmental entities, to address adverse 11 water quality impacts of certain activities; revising 12 construction; amending s. 373.4135, F.S.; revising 13 legislative findings; requiring governmental entities 14 to consider certain proposals; authorizing 15 governmental entities to solicit proposals for 16 mitigation bank projects on public land; providing 17 requirements for the proposals and for agreements 18 between local governmental and private entities; 19 requiring the department and water management 20 districts to consider certain factors in assigning 21 mitigation bank credits to the bank; providing 22 applicability; providing construction; amending ss. 23 330.41, 373.414, and 373.461, F.S.; conforming cross 24 references; reenacting s. 403.9332(1)(a) and (c), 25 F.S., relating to mitigation and enforcement, to 26 incorporate the amendments made to s. 373.4135, F.S., 27 in references thereto; providing an effective date. 28 29 Be It Enacted by the Legislature of the State of Florida: 30 31 Section 1. Section 373.403, Florida Statutes, is reordered 32 and amended to read: 33 373.403 Definitions.—When appearing in this part or in any 34 rule, regulation, or order adopted pursuant thereto, the 35 following terms mean: 36 (4)(1)“Dam” means any artificial or natural barrier, with 37 appurtenant works, raised to obstruct or impound, or which does 38 obstruct or impound, any of the surface waters of the state. 39 (2) “Appurtenant works” means any artificial improvements 40 to a dam which might affect the safety of such dam or, when 41 employed, might affect the holding capacity of such dam or of 42 the reservoir or impoundment created by such dam. 43 (10)(3)“Impoundment” means any lake, reservoir, pond, or 44 other containment of surface water occupying a bed or depression 45 in the earth’s surface and having a discernible shoreline. 46 (17)(4)“Reservoir” means any artificial or natural holding 47 area which contains or will contain the water impounded by a 48 dam. 49 (23)(5)“Works” means all artificial structures, including, 50 but not limited to, ditches, canals, conduits, channels, 51 culverts, pipes, and other construction that connects to, draws 52 water from, drains water into, or is placed in or across the 53 waters in the state. 54 (3)(6)“Closed system” means any reservoir or works located 55 entirely within agricultural lands owned or controlled by the 56 user and which requires water only for the filling, 57 replenishing, and maintaining the water level thereof. 58 (1)(7)“Alter” means to extend a dam or works beyond 59 maintenance in its original condition, including changes which 60 may increase or diminish the flow or storage of surface water 61 which may affect the safety of such dam or works. 62 (12)(8)“Maintenance” or “repairs” means remedial work of a 63 nature as may affect the safety of any dam, impoundment, 64 reservoir, or appurtenant work or works, but excludes routine 65 custodial maintenance. 66 (5)(9)“Drainage basin” means a subdivision of a watershed. 67 (21)(10)“Stormwater management system” means a system 68which isdesigned and constructed or implemented to control 69 dischargeswhich arenecessitated by rainfall events, 70 incorporating methods to collect, convey, store, absorb, 71 inhibit, treat, use, or reuse water to prevent or reduce 72 flooding, overdrainage, environmental degradation, and water 73 pollution or otherwise affect the quantity and quality of 74 discharges from the system. 75 (20)(11)“State water quality standards” means water 76 quality standards adopted pursuant to chapter 403. 77 (22)(12)“Watershed” means the land area thatwhich78 contributes to the flow of water into a receiving body of water. 79 (6)(13)“Dredging” means excavation, by any means, in 80 surface waters or wetlands, as delineated in s. 373.421(1). The 81 termItalso means the excavation, or creation, of a water body 82 which is, or is to be, connected to surface waters or wetlands, 83 as delineated in s. 373.421(1), directly or via an excavated 84 water body or series of water bodies. 85 (9)(14)“Filling” means the deposition, by any means, of 86 materials in surface waters or wetlands, as delineated in s. 87 373.421(1). 88 (8)(15)“Estuary” means a semienclosed, naturally existing 89 coastal body of water thatwhichhas a free connection with the 90 open sea and within which seawater is measurably diluted with 91 fresh water derived from riverine systems. 92 (11)(16)“Lagoon” means a naturally existing coastal zone 93 depression thatwhichis below mean high water and thatwhich94 has permanent or ephemeral communications with the sea, but 95whichis protected from the sea by some type of naturally 96 existing barrier. 97 (18)(17)“Seawall” means a manmade wall or encroachment, 98 except riprap, which is made to break the force of waves and to 99 protect the shore from erosion. 100 (19) “Sponsor” means an individual or entity that 101 establishes and operates a wetland mitigation bank project and 102 is responsible for compliance with any permits or 103 authorizations, including, but not limited to, funding and 104 undertaking wetland enhancement, restoration or creation 105 activities, and the provision of financial assurances, as well 106 as any required monitoring, reporting, and maintenance of the 107 mitigation bank. 108 (7)(18)“Ecological value” means the value of functions 109 performed by uplands, wetlands, and other surface waters to the 110 abundance, diversity, and habitats of fish, wildlife, and listed 111 species. These functions include, but are not limited to, 112 providing cover and refuge; breeding, nesting, denning, and 113 nursery areas; corridors for wildlife movement; food chain 114 support; and natural water storage, natural flow attenuation, 115 and water quality improvement, which enhances fish, wildlife, 116 and listed species utilization. 117 (13)(19)“Mitigation bank” means a project permitted under 118 s. 373.4136 undertaken to provide for the withdrawal of 119 mitigation credits to offset adverse impacts authorized by a 120 permit under this part. 121 (14)(20)“Mitigation credit” means a standard unit of 122 measure which represents the increase in ecological value 123 resulting from restoration, enhancement, preservation, or 124 creation activities. 125 (15)(21)“Mitigation service area” means the geographic 126 area within which mitigation credits from a mitigation bank may 127 be used to offset adverse impacts of activities regulated under 128 this part. 129 (16)(22)“Offsite regional mitigation” means mitigation on 130 an area of land off the site of an activity permitted under this 131 part, where an applicant proposes to mitigate the adverse 132 impacts of only the applicant’s specific activity as a 133 requirement of the permit, which provides regional ecological 134 value, and which is not a mitigation bank permitted under s. 135 373.4136. 136 Section 2. Paragraphs (b), (d), and (e) of subsection (1), 137 paragraph (b) of subsection (3), and paragraphs (a) and (j) of 138 subsection (7) of section 373.4134, Florida Statutes, are 139 amended to read: 140 373.4134 Water quality enhancement areas.— 141 (1) LEGISLATIVE FINDINGS AND INTENT.—The Legislature finds 142 that: 143 (b) An expansion of existing authority for regional 144 treatment to include offsite compensatory treatment in water 145 quality enhancement areas to make enhancement credits available 146 for purchase by an applicant or a governmental entityentities147 to address impacts regulated under this part is needed. 148 (d) Water quality enhancement areas are a valuable tool to 149 assist an applicantgovernmental entitiesin satisfying the net 150 improvement performance standard under s. 373.414(1)(b)3. to 151 ensure significant reductions of pollutant loadings. 152 (e) Water quality enhancement areas that provide water 153 quality enhancement credits to applicantsgovernmental entities154 seeking permits under this part and to governmental entities 155 seeking to meet an assigned basin management action plan 156 allocation or reasonable assurance plan under s. 403.067 are 157 considered an appropriate and permittable option. 158 (3) WATER QUALITY ENHANCEMENT AREAS.— 159 (b) Water quality enhancement credits may be soldonlyto 160 governmental entities seeking to meet an assigned basin 161 management action plan allocation or reasonable assurance plan 162 or to applicants for the purpose of achieving the net 163 improvement performance standard under s. 373.414(1)(b)3. after 164the governmental entity has providedreasonable assurances have 165 been provided for theassurance of meeting department rules for166 design and construction of all onsite stormwater management 167 required by rule 62-330, Florida Administrative Code. 168 (7) ENHANCEMENT CREDITS.— 169 (a) The department or water management district shall 170 authorize the sale and use of enhancement credits to applicants 171governmental entitiesto address adverse water quality impacts 172 of activities regulated under this part or to assist 173 governmental entities seeking to meet required nonpoint source 174 contribution reductions assigned in a basin management action 175 plan or reasonable assurance plan under s. 403.067. 176 (j) Notwithstanding any other law, this section does not 177 limit or restrict the authority of the department to deny the 178 use of enhancement credits when the department is not reasonably 179 assured that the use of the credits will not cause or contribute 180 to a violation of water quality standards, even if the project 181 being implemented by the applicant or governmental entity is 182 within the enhancement service area. The department may allow 183 the use of enhancement credits if the department receives a 184 request for the use of enhancement credits and determines that 185 such use will not cause or contribute to a violation of water 186 quality standards. 187 Section 3. Subsection (1) of section 373.4135, Florida 188 Statutes, is amended, and subsection (8) is added to that 189 section, to read: 190 373.4135 Mitigation banks and offsite regional mitigation.— 191 (1) The Legislature finds that the adverse impacts of 192 activities regulated under this part may be offset by the 193 creation, maintenance, and use of mitigation banks and offsite 194 regional mitigation. Mitigation banks and offsite regional 195 mitigation can enhance the certainty of mitigation and provide 196 ecological value due to the improved likelihood of environmental 197 success associated with their proper construction, maintenance, 198 and management. Therefore, the department and the water 199 management districts are directed toparticipate in and200 encourage the establishment of privateand publicmitigation 201 banks and offsite regional mitigation on private and public 202 lands. Mitigation banks and offsite regional mitigation should 203 emphasize the restoration and enhancement of degraded ecosystems 204 and the preservation of uplands and wetlands as intact 205 ecosystems rather than alteration of landscapes to create 206 wetlands. This is best accomplished through restoration of 207 ecological communities that were historically present. 208 (a) The Legislature intends that the provisions for 209 establishing mitigation banks apply equally to both public and 210 private entities, except that the rules of the department and 211 water management districts may set forth different measures 212 governing financial responsibility, and different measures 213 governing legal interest, needed to ensure the construction and 214 perpetual protection of a mitigation bank. 215 (b) The Legislature recognizes the importance of mitigation 216 banks as an appropriate and allowable mitigation alternative to 217 permittee-responsible mitigation. However, the Legislature also 218 recognizes that certain timing and geographical constraints 219 could result in the unavailability of mitigation bank credits 220 for a certain project upon completion of the project’s 221 application. If state and federal mitigation credits are not 222 available to offset the adverse impacts of a project, a local 223 government may allow permittee-responsible mitigation consisting 224 of the restoration or enhancement of lands purchased and owned 225 by a local government for conservation purposes, and such 226 mitigation must conform to the permitting requirements of s. 227 373.4136. Except when a local government has allowed a public or 228 private permittee-responsible mitigation project to be created 229 on land it has purchased for conservation purposes pursuant to 230 this paragraph, a governmental entity may not create or provide 231 mitigation for a project other than its own unless the 232 governmental entity uses land that was not previously purchased 233 for conservation and unless the governmental entity provides the 234 same financial assurances as required for mitigation banks 235 permitted under s. 373.4136. This paragraph does not apply to: 236 1. Mitigation banks permitted before December 31, 2011, 237 under s. 373.4136; 238 2. Offsite regional mitigation areas established before 239 December 31, 2011, under subsection (6) or, when credits are not 240 available at a mitigation bank permitted under s. 373.4136, 241 mitigation areas created by a local government which were 242 awarded mitigation credits pursuant to the uniform mitigation 243 assessment method as provided in chapter 62-345, Florida 244 Administrative Code, under a permit issued before December 31, 245 2011; 246 3. Mitigation for transportation projects under ss. 247 373.4137 and 373.4139; 248 4. Mitigation for impacts from mining activities under s. 249 373.41492; 250 5. Mitigation provided for single-family lots or homeowners 251 under subsection (7); 252 6. Entities authorized in chapter 98-492, Laws of Florida; 253 7. Mitigation provided for electric utility impacts 254 certified under part II of chapter 403; or 255 8. Mitigation provided on sovereign submerged lands under 256 subsection (6). 257 (c) It is the further intent of the Legislature that 258 mitigation banks and offsite regional mitigation be considered 259 appropriate and a permittable mitigation option under the 260 conditions specified by the rules of the department and water 261 management districts. 262 (d) Offsite mitigation, including offsite regional 263 mitigation, may be located outside the regional watershed in 264 which the adverse impacts of an activity regulated under this 265 part are located, if such adverse impacts are offset by the 266 offsite mitigation. 267 (e) The department or water management district may allow 268 the use of a mitigation bank or offsite regional mitigation 269 alone or in combination with other forms of mitigation to offset 270 adverse impacts of activities regulated under this part. 271 (f) When an applicant seekingfora permit underthe272provisions ofthis part other than this section and s. 373.4136 273 submits more than one mitigation proposal to the department or a 274 water management district, the department or water management 275 district shall, in evaluating each proposal, ensure that such 276 proposal adequately offsets the adverse impacts. 277 (8) A governmental entity shall consider unsolicited 278 proposals for or may solicit proposals, in accordance with s. 279 255.065(3) or other established public procurement process, for 280 a mitigation bank project on public land. If a mitigation bank 281 is to be established and operated by a private entity on public 282 land, the governmental entity and private entity must enter into 283 an agreement requiring the private entity to serve as the 284 sponsor of the project and the agreement must require the 285 mitigation bank to conform to the permitting requirements of s. 286 373.4136. 287 (a) The agreement must require the private entity to pay a 288 usage fee to the governmental entity which reflects the market 289 value of the public land, as determined by a competitive process 290 in accordance with state law or such other method of assuring 291 that the cost of the use of the public land is fully accounted 292 for in the pricing of mitigation credits. 293 (b) In determining the number of mitigation bank credits 294 assigned to the mitigation bank, the department or water 295 management district shall reflect the conservation status of the 296 land in the location factor set forth in the uniform mitigation 297 assessment method. 298 (c) This subsection applies to drainage basins or 299 corresponding hydrologic units if the applicant demonstrates to 300 the department or water management district that in-kind credits 301 are not available. 302 (d) Rulemaking is not required to implement this 303 subsection. 304 Section 4. Paragraph (a) of subsection (2) of section 305 330.41, Florida Statutes, is amended to read: 306 330.41 Unmanned Aircraft Systems Act.— 307 (2) DEFINITIONS.—As used in this act, the term: 308 (a) “Critical infrastructure facility” means any of the 309 following, if completely enclosed by a fence or other physical 310 barrier that is obviously designed to exclude intruders, or if 311 clearly marked with a sign or signs which indicate that entry is 312 forbidden and which are posted on the property in a manner 313 reasonably likely to come to the attention of intruders: 314 1. A power generation or transmission facility, substation, 315 switching station, or electrical control center. 316 2. A chemical or rubber manufacturing or storage facility. 317 3. A water intake structure, water treatment facility, 318 wastewater treatment plant, or pump station. 319 4. A mining facility. 320 5. A natural gas or compressed gas compressor station, 321 storage facility, or natural gas or compressed gas pipeline. 322 6. A liquid natural gas or propane gas terminal or storage 323 facility. 324 7. Any portion of an aboveground oil or gas pipeline. 325 8. A refinery. 326 9. A gas processing plant, including a plant used in the 327 processing, treatment, or fractionation of natural gas. 328 10. A wireless communications facility, including the 329 tower, antennae, support structures, and all associated ground 330 based equipment. 331 11. A seaport as listed in s. 311.09(1), which need not be 332 completely enclosed by a fence or other physical barrier and 333 need not be marked with a sign or signs indicating that entry is 334 forbidden. 335 12. An inland port or other facility or group of facilities 336 serving as a point of intermodal transfer of freight in a 337 specific area physically separated from a seaport. 338 13. An airport as defined in s. 330.27. 339 14. A spaceport territory as defined in s. 331.303(18). 340 15. A military installation as defined in 10 U.S.C. s. 341 2801(c)(4) and an armory as defined in s. 250.01. 342 16. A dam as defined in s. 373.403s. 373.403(1)or other 343 structures, such as locks, floodgates, or dikes, which are 344 designed to maintain or control the level of navigable 345 waterways. 346 17. A state correctional institution as defined in s. 347 944.02 or a private correctional facility authorized under 348 chapter 957. 349 18. A secure detention center or facility as defined in s. 350 985.03, or a nonsecure residential facility, a high-risk 351 residential facility, or a maximum-risk residential facility as 352 those terms are described in s. 985.03(44). 353 19. A county detention facility as defined in s. 951.23. 354 20. A critical infrastructure facility as defined in s. 355 692.201. 356 Section 5. Paragraph (a) of subsection (8) of section 357 373.414, Florida Statutes, is amended to read: 358 373.414 Additional criteria for activities in surface 359 waters and wetlands.— 360 (8)(a) The governing board or the department, in deciding 361 whether to grant or deny a permit for an activity regulated 362 under this part shall consider the cumulative impacts upon 363 surface water and wetlands, as delineated in s. 373.421(1), 364 within the same drainage basin as defined in s. 373.403s.365373.403(9), of: 366 1. The activity for which the permit is sought. 367 2. Projects which are existing or activities regulated 368 under this part which are under construction or projects for 369 which permits or determinations pursuant to s. 373.421or s.370403.914have been sought. 371 3. Activities which are under review, approved, or vested 372 pursuant to s. 380.06, or other activities regulated under this 373 part which may reasonably be expected to be located within 374 surface waters or wetlands, as delineated in s. 373.421(1), in 375 the same drainage basin as defined in s. 373.403s. 373.403(9), 376 based upon the comprehensive plans, adopted pursuant to chapter 377 163, of the local governments having jurisdiction over the 378 activities, or applicable land use restrictions and regulations. 379 Section 6. Paragraph (c) of subsection (2) of section 380 373.461, Florida Statutes, is amended to read: 381 373.461 Lake Apopka improvement and management.— 382 (2) DEFINITIONS.—As used in this section: 383 (c) “Stormwater management system” has the meaning set 384 forth in s. 373.403s. 373.403(10). 385 Section 7. For the purpose of incorporating the amendment 386 made by this act to section 373.4135, Florida Statutes, in 387 references thereto, paragraphs (a) and (c) of subsection (1) of 388 section 403.9332, Florida Statutes, are reenacted to read: 389 403.9332 Mitigation and enforcement.— 390 (1)(a) Any area in which 5 percent or more of the trimmed 391 mangrove trees have been trimmed below 6 feet in height, except 392 as provided in s. 403.9326(1)(c), (d), (f), (g), and (h), 393 destroyed, defoliated, or removed as a result of trimming 394 conducted under s. 403.9326 or s. 403.9327 must be restored or 395 mitigated. Restoration must be accomplished by replanting 396 mangroves, in the same location and of the same species as each 397 mangrove destroyed, defoliated, removed, or trimmed, to achieve 398 within 5 years a canopy area equivalent to the area destroyed, 399 removed, defoliated, or trimmed; or mitigation must be 400 accomplished by replanting offsite, in areas suitable for 401 mangrove growth, mangroves to achieve within 5 years a canopy 402 area equivalent to the area destroyed, removed, defoliated, or 403 trimmed. Where all or a portion of the restoration or mitigation 404 is not practicable, as determined by the department or delegated 405 local government, the impacts resulting from the destruction, 406 defoliation, removal, or trimming of the mangroves must be 407 offset by donating a sufficient amount of money to offset the 408 impacts, which must be used for the restoration, enhancement, 409 creation, or preservation of mangrove wetlands within a 410 restoration, enhancement, creation, or preservation project 411 approved by the department or delegated local government; or by 412 purchasing credits from a mitigation bank created under s. 413 373.4135 at a mitigation ratio of 2-to-1 credits to affected 414 area. The donation must be equivalent to the cost, as verified 415 by the department or delegated local government, of creating 416 mangrove wetlands at a 2-to-1, created versus affected ratio, 417 based on canopy area. The donation may not be less than $4 per 418 square foot of created wetland area. 419 (c) If mangroves are to be trimmed or altered under a 420 permit issued under s. 403.9328, the department or delegated 421 local government may require mitigation. The department or 422 delegated local government shall establish reasonable mitigation 423 requirements that must include, as an option, the use of 424 mitigation banks created under s. 373.4135, where appropriate. 425 The department’s mitigation requirements must ensure that 426 payments received as mitigation are sufficient to offset impacts 427 and are used for mangrove creation, preservation, protection, or 428 enhancement. 429 Section 8. This act shall take effect July 1, 2024.