Bill Text: GA SB155 | 2009-2010 | Regular Session | Comm Sub
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Soil Erosion and Sedimentation; 25 foot buffers along state waters; change certain provisions
Spectrum: Partisan Bill (Republican 6-0)
Status: (Passed) 2009-07-01 - Effective Date [SB155 Detail]
Download: Georgia-2009-SB155-Comm_Sub.html
Bill Title: Soil Erosion and Sedimentation; 25 foot buffers along state waters; change certain provisions
Spectrum: Partisan Bill (Republican 6-0)
Status: (Passed) 2009-07-01 - Effective Date [SB155 Detail]
Download: Georgia-2009-SB155-Comm_Sub.html
09 LC
25 5609S
The
House Committee on Natural Resources and Environment offers the following
substitute
to SB 155:
A
BILL TO BE ENTITLED
AN ACT
AN ACT
To
amend Code Section 12-7-6 of the Official Code of Georgia Annotated, relating to
best management practices for control of soil erosion and sedimentation and
minimum requirements for rules, regulations, ordinances, or resolutions, so as
to change certain provisions relating to 25 foot buffers along state waters; to
repeal conflicting laws; and for other purposes.
BE
IT ENACTED BY THE GENERAL ASSEMBLY OF GEORGIA:
SECTION
1.
Code
Section 12-7-6 of the Official Code of Georgia Annotated, relating to best
management practices for control of soil erosion and sedimentation and minimum
requirements for rules, regulations, ordinances, or resolutions, is amended by
revising subparagraph (b)(15)(A) as follows:
"(15)(A)
There is established a 25 foot buffer along the banks of all state waters, as
measured horizontally from the point where vegetation has been wrested by normal
stream flow or wave action, except:
(i)
As provided by paragraph (16) of this subsection;
(ii)
Where the director determines to allow a variance that is at least as protective
of natural resources and the environment;
(iii)
Where otherwise allowed by the director pursuant to Code Section 12-2-8;
or
(iv)
Where a drainage structure or a roadway drainage structure must be constructed,
provided that adequate erosion control measures are incorporated in the project
plans and specifications and are implemented;
or
(v)
Along any ephemeral stream. As used in this division, the term 'ephemeral
stream' means a stream:
(I)
That under normal circumstances has water flowing only during and for a short
duration after precipitation events;
(II)
That has the channel located above the ground-water table year
round;
(III)
For which ground water is not a source of water; and
(IV)
For which runoff from precipitation is the primary source of water
flow.
provided,
however, that buffers
Unless
exempted under division (v) of this subparagraph,
buffers of at least 25 feet established
pursuant to Part 6 of Article 5 of Chapter 5 of this title shall remain in force
unless a variance is granted by the director as provided in this
paragraph."
SECTION
2.
All
laws and parts of laws in conflict with this Act are repealed.