HI HB12 | 2013 | Regular Session
Status
Spectrum: Bipartisan Bill
Status: Introduced on January 17 2013 - 25% progression, died in committee
Action: 2013-01-18 - Referred to CPC, FIN, referral sheet 1
Pending: House Consumer Protection & Commerce Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on January 17 2013 - 25% progression, died in committee
Action: 2013-01-18 - Referred to CPC, FIN, referral sheet 1
Pending: House Consumer Protection & Commerce Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Prohibits an electric utility company from commencing its capital cost recovery for the construction of the on-island transmission infrastructure earlier than 10 years after the commercial operations date of the high-voltage electric transmission cable system.
Title
Interisland Transmission System; Electric Utility Company Costs
Sponsors
History
Date | Chamber | Action |
---|---|---|
2013-01-18 | House | Referred to CPC, FIN, referral sheet 1 |
2013-01-17 | House | Introduced and Passed First Reading |
2013-01-16 | House | Pending introduction. |
Hawaii State Sources
Type | Source |
---|---|
Summary | http://www.capitol.hawaii.gov/measure_indiv.aspx?billtype=HB&billnumber=12&year=2013 |
Text | http://www.capitol.hawaii.gov/session2013/Bills/HB12_.HTM |