HI SR36 | 2017 | Regular Session
Note: Carry Foward to future SR36
Status
Spectrum: Partisan Bill (Democrat 2-0)
Status: Introduced on March 10 2017 - 25% progression, died in committee
Action: 2017-03-16 - Referred to TRE/WTL/PSM, WAM.
Pending: Senate Transportation and Energy Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on March 10 2017 - 25% progression, died in committee
Action: 2017-03-16 - Referred to TRE/WTL/PSM, WAM.
Pending: Senate Transportation and Energy Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Requesting The State Auditor To Conduct A Study Comparing The Costs Of Using Elevated Rail Versus Street-level Rail To Complete The Middle Street To Downtown Honolulu Portion Of The Honolulu Rail Project.
Title
Requesting The State Auditor To Conduct A Study Comparing The Costs Of Using Elevated Rail Versus Street-level Rail To Complete The Middle Street To Downtown Honolulu Portion Of The Honolulu Rail Project.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2017-03-16 | Senate | Referred to TRE/WTL/PSM, WAM. |
2017-03-10 | Senate | Offered. |
Same As/Similar To
SR36 (Carry Over) 2017-03-16 - Referred to TRE/WTL/PSM, WAM.
HR61 (Same As) 2017-03-22 - The committee(s) on TRN recommend(s) that the measure be deferred.
HR61 (Same As) 2017-03-22 - The committee(s) on TRN recommend(s) that the measure be deferred.
Subjects
Hawaii State Sources
Type | Source |
---|---|
Summary | http://www.capitol.hawaii.gov/measure_indiv.aspx?billtype=SR&billnumber=36&year=2017 |
Text | http://www.capitol.hawaii.gov/session2017/bills/SR36_.HTM |