Bill Text: HI HB1373 | 2013 | Regular Session | Introduced


Bill Title: CIP; 47th Representative District ($)

Spectrum: Partisan Bill (Republican 1-0)

Status: (Introduced - Dead) 2013-01-28 - Referred to FIN, referral sheet 7 [HB1373 Detail]

Download: Hawaii-2013-HB1373-Introduced.html

HOUSE OF REPRESENTATIVES

H.B. NO.

1373

TWENTY-SEVENTH LEGISLATURE, 2013

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE forty-seventh REPRESENTATIVE DISTRICT.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $24,155,000 or so much thereof as may be necessary, and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2013-2014, and $7,892,000 for fiscal year 2014-2015, as indicated, for the purpose of capital improvement projects for the forty-seventh representative district, as follows:

I.   To be expended by the department of education:

1. Ka'a'awa Elementary School, Oahu

A. Plans, design, and construction of a new office portable building.

Plans                                          $1,000

Design                                         $1,000

Construction                                 $398,000

     Total Funding                           $400,000

2. Kahuku Elementary School, Oahu

A. Plans, design, and construction of a second storey on the school cafeteria.

Plans                                          $1,000

Design                                         $1,000

Construction                                 $998,000

     Total Funding                         $1,000,000

3. Kahuku High School, Oahu

A. Design and construction to replace Sunset Beach-side bleachers at football field for safety concerns.

Design                                         $1,000

Construction                                 $299,000

     Total Funding                           $300,000

B. Plans, design, and construction of a new football field and other infrastructure improvements; ground and site improvements; equipment and appurtenances.

Plans                                          $1,000

Design                                         $1,000

Construction                               $1,498,000

     Total Funding                         $1,500,000

C. Plans, design, and construction of an all weather track and field; ground and site improvements; equipment and appurtenances.

Plans                                          $1,000

Design                                         $1,000

Construction                               $1,498,000

     Total Funding                         $1,500,000

D. Plans, design, and construction for air conditioning of certain classrooms and administrative facilities.

Plans                                          $1,000

Design                                         $1,000

Construction                               $9,998,000

     Total Funding                        $10,000,000

4. Waiahole Elementary School, Oahu

A. Plans, design, and construction for ADA transition accessibility.

Plans                                          $1,000

Design                                         $1,000

Construction                                 $373,000

     Total Funding                           $375,000

B. Plans, design, and construction for campus-wide air conditioning.

Plans                                          $1,000

Design                                         $1,000

Construction                               $3,498,000

     Total Funding                         $3,500,000

C. Plans, design, and construction of a special needs education trailer.

Plans                                          $1,000

Design                                         $1,000

Construction                                 $348,000

     Total Funding                           $350,000

D. Plans, design, and construction of new air conditioning in office.

Plans                                          $1,000

Design                                         $1,000

Construction                                   $8,000

     Total Funding                            $10,000

II.  To be expended by the department of transportation:

1. Kamehameha Highway, Oahu

A. Plans, design, and construction for the rehabilitation and/or replacement of the South Kahana Stream bridge.

Plans                           $1,000 (FY 2014-2015)

Design                          $1,000 (FY 2014-2015)

Construction                $3,298,000 (FY 2014-2015)

     Total Funding          $3,300,000 (FY 2014-2015)

B. Plans, design, and construction for the rehabilitation and/or replacement of the Laieloa Stream bridge.

Plans                                          $1,000

Design                                         $1,000

Construction                                 $136,000

     Total Funding                           $138,000

C. Plans, design, and construction for the rehabilitation and/or replacement of the Waipilopilo Stream bridge.

Plans                           $1,000 (FY 2014-2015)

Design                          $1,000 (FY 2014-2015)

Construction                $1,518,000 (FY 2014-2015)

     Total Funding          $1,520,000 (FY 2014-2015)

D. Plans, design, and construction for the rehabilitation and/or replacement of the Makaua Stream bridge.

Plans                           $1,000 (FY 2014-2015)

Design                          $1,000 (FY 2014-2015)

Construction                $1,016,000 (FY 2014-2015)

     Total Funding          $1,018,000 (FY 2014-2015)

E. Plans, design, and construction for the rehabilitation and/or replacement of the Waikane Stream bridge.

Plans                                          $1,000

Design                                         $1,000

Construction                                  $30,000

                            $1,714,000 (FY 2014-2015)

     Total Funding                            $32,000

                            $1,714,000 (FY 2014-2015)

F. Design, and construction for the improvement of the Helemano-Wailua junction to Haleiwa Beach Park.

Design                                         $1,000

Construction                                 $164,000

     Total Funding                           $165,000

III. To be expended by the department of health:

1. Kahuku Medical Center, Oahu

A. Design and construction to upgrade the generator and electrical system.

Design                                         $1,000

Construction                                 $980,000

     Total Funding                           $981,000

B. Design and construction to replace the fire alarm system.

Design                                         $1,000

Construction                                 $480,000

     Total Funding                           $481,000

C. Design and construction to improve patient rooms.

Design                          $1,000 (FY 2014-2015)

Construction                  $339,000 (FY 2014-2015)

     Total Funding            $340,000 (FY 2014-2015)

D. Design and construction to replace the nurse call system.

Design                                         $1,000

Construction                                 $318,000

     Total Funding                           $319,000

E. Design and construction to replace exit doors and frames.

Design                                         $1,000

Construction                                 $103,000

     Total Funding                           $104,000

IV.  To be expended by the department of business, economic development, and tourism:

1. Waiahole, Oahu

A. Waiahole Water System

Improvements                               $3,000,000

     Total Funding                         $3,000,000

     SECTION 2.  The appropriations made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that:

     (1)  From the appropriations made for fiscal year 2013-

          2014, all moneys unencumbered as of June 30, 2016,

          shall lapse as of that date; and

     (2)  From the appropriations made for fiscal year 2014-

          2015, all moneys unencumbered as of June 30, 2017,

          shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.

     SECTION 4.  This Act shall take effect on July 1, 2013.

 

INTRODUCED BY:

_____________________________

 

 


 


 

Report Title:

CIP; 47th Representative District

 

Description:

Authorizes the issuance of GO bonds and appropriates funds for capital improvement projects in the 47th representative district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

 

 

feedback