Bill Text: HI HB2752 | 2024 | Regular Session | Introduced
Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Forty-fifth Representative District.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2024-01-26 - Referred to FIN, referral sheet 3 [HB2752 Detail]
Download: Hawaii-2024-HB2752-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
2752 |
THIRTY-SECOND LEGISLATURE, 2024 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
relating to capital improvement projects for the benefit of THE Forty-fifth REPRESENTATIVE DISTRICT.
BE IT
ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The director of finance is authorized to issue general obligation bonds in the sum of $229,475,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2024-2025 for the purpose of capital improvement projects for the forty-fifth representative district, as follows:
1. Kamaile academy public charter school
Design, construction, and equipment and appurtenances for installation of air conditioning systems in the cafeteria, library, and administrative buildings; ground and site improvements.
Design $330,000
Construction $1,000,000
Equipment $370,000
Total funding $1,700,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
2. Kamaile academy public charter school
Design, construction, and equipment and appurtenances for installing a campus playground, additional parking, irrigation system, and fencing; grading and conditioning the soil; ground and site improvements.
Design $80,000
Construction $1,000,000
Equipment $120,000
Total funding $1,200,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
3. Leihoku elementary school
Design and construction for parking lot expansion.
Design $150,000
Construction $350,000
Total funding $500,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
4. Leihoku elementary school
Design, construction, and equipment and appurtenances for covered walkways throughout the campus; ground and site improvements.
Design $210,000
Construction $470,000
Equipment $20,000
Total funding $700,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
5. Waianae elementary school
Design, construction, and equipment and appurtenances for a covered play court; ground and site improvements.
Design $600,000
Construction $1,200,000
Equipment $200,000
Total funding $2,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
6. Waianae high school
Design and construction for a multipurpose sports facility.
Design $1,000,000
Construction $9,000,000
Total funding $10,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
7. Waianae high school
Design and construction for a Waianae cultural center.
Design $300,000
Construction $2,700,000
Total funding $3,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
8. Waianae high school
Design, construction, and equipment and appurtenances for electrical upgrades for building A; ground and site improvements.
Design $600,000
Construction $1,200,000
Equipment $200,000
Total funding $2,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
9. Waianae high school
Land, design, construction, and equipment and appurtenances for installation of a pool.
Land $500,000
Design $1,000,000
Construction $18,000,000
Equipment $500,000
Total funding $20,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
10. Waianae intermediate school
Design, construction, and equipment and appurtenances for a covered campus playground and basketball court; ground and site improvements.
Design $1,000,000
Construction $1,500,000
Equipment $500,000
Total funding $3,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
11. Waianae intermediate school
Design, construction, and equipment and appurtenances for a sixth grade building; ground and site improvements.
Design $13,500,000
Construction $31,050,000
Equipment $450,000
Total funding $45,000,000
The sum appropriated for this capital improvement project shall be expended by the department of education.
12. Breach repair in the Makaha stream berm
Design and construction for repair of the earthen berm at the breach.
Design $50,000
Construction $400,000
Total funding $450,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
13. Eku stream channel and off-line detention basin
Plans, land, design, construction, and equipment and appurtenances for improvements to Eku stream to extend the channel upstream.
Plans $2,000,000
Land $310,000
Design $457,000
Construction $31,000,000
Equipment $1,000,000
Total funding $34,767,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
14. In-stream detention basins for Makaha stream
Plans, design, and construction for the in-stream detention basins for the Makaha stream project.
Plans $100,000
Design $1,000,000
Construction $2,000,000
Total funding $3,100,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
15. Kili drive channel
Plans, design, and construction for a trapezoidal-shaped, open concrete-lined ditch.
Plans $937,000
Design $3,000,000
Construction $16,000,000
Total funding $19,937,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
16. Makaha stream levee
Plans, design, and construction for a reinforced concrete levee (flood wall) system along the northern and western side of affected properties on Manuku and Nukea streets.
Plans $21,000
Design $3,000,000
Construction $21,000,000
Total funding $24,021,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
17. Mauna Olu Estates drainage improvements
Plans, design, and construction for the Mauna Olu Estates drainage improvements project.
Plans $1,000,000
Design $2,000,000
Construction $3,000,000
Total funding $6,000,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
18. Noholio road drain line
Design and construction for installation of a drain line on Noholio road with a closed culvert system.
Design $500,000
Construction $2,800,000
Total funding $3,300,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
19. Restoration of Makaha surfing beach "pond"
Plans, design, and construction for restoration of the "pond" at Makaha beach that served as a natural debris basin.
Plans $100,000
Design $1,000,000
Construction $2,000,000
Total funding $3,100,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
20. Waianae small boat harbor
Land, design, and construction for asphalt pavement, drainage improvements for the dirt parking area near the harbor entrance, and repair of damage to the main loading dock at the harbor.
Land $200,000
Design $600,000
Construction $900,000
Total funding $1,700,000
The sum appropriated for this capital improvement project shall be expended by the department of land and natural resources.
21. Farrington highway
Plans, land, design, construction, and equipment and appurtenances for the extension of the fifth lane to widen Farrington highway; creation of a parallel route for the Waianae coast; extension of Paakea road; and other traffic improvements.
Plans $1,500,000
Land $1,000,000
Design $1,500,000
Construction $20,000,000
Equipment $1,000,000
Total funding $25,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
22. New Eku stream bridge at Farrington highway
Design, construction, and equipment and appurtenances for a new reinforced concrete bridge at Farrington highway crossing Eku stream.
Design $2,000,000
Construction $16,000,000
Equipment $1,000,000
Total funding $19,000,000
The sum appropriated for this capital improvement project shall be expended by the department of transportation.
SECTION 2. The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal year for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2026, shall lapse as of that date.
SECTION 3. This Act shall take effect on July 1, 2024.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; Forty-fifth Representative District; Appropriation
Description:
Appropriates funds for capital improvement projects in the forty-fifth representative district.
The summary description
of legislation appearing on this page is for informational purposes only and is
not legislation or evidence of legislative intent.