Bill Text: HI HB791 | 2020 | Regular Session | Introduced
Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Forty-seventh Representative District.
Spectrum: Partisan Bill (Democrat 1-0)
Status: (Introduced - Dead) 2019-12-01 - Carried over to 2020 Regular Session. [HB791 Detail]
Download: Hawaii-2020-HB791-Introduced.html
HOUSE OF REPRESENTATIVES |
H.B. NO. |
791 |
THIRTIETH LEGISLATURE, 2019 |
|
|
STATE OF HAWAII |
|
|
|
|
|
|
||
|
A BILL FOR AN ACT
RELATING TO CAPITAL IMPROVEMENT PROJECTS FOR THE BENEFIT OF THE FORTY-SEVENTH REPRESENTATIVE DISTRICT.
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:
SECTION 1. The following sums, or so much thereof as shall be sufficient to finance the projects listed in this Act, are hereby appropriated out of the general revenues of the State of Hawaii for fiscal year 2019-2020:
1. To be expended by the department of education:
A. Haleiwa elementary school, Oahu
Design and construction to renovate the multi-purpose dining room; ground and site improvements; and equipment and appurtenances.
Design $180,000
Construction $800,000
Total $980,000
B. Haleiwa elementary school, Oahu
Design and construction to irrigate the grass field; and ground and site improvements.
Design $25,000
Construction $225,000
Total $250,000
C. Hauula elementary school, Oahu
Construction to upgrade the electrical system; and ground and site improvements.
Construction $1,000,000
Total $1,000,000
D. Hauula elementary school, Oahu
Design and construction for a new security system; ground and site improvements; and equipment and appurtenances.
Design $25,000
Construction $175,000
Total $200,000
E. Kaaawa elementary school, Oahu
Design and construction to install air conditioning systems; ground and site improvements; and equipment and appurtenances.
Design $250,000
Construction $3,250,000
Total $3,500,000
F. Kaaawa elementary school, Oahu
Design and construction for ADA transition accessibility; and ground and site improvements.
Design $25,000
Construction $350,000
Total $375,000
G. Kahuku elementary school, Oahu
Design and construction to install lighting in the parking lot; ground and site improvements; and equipment and appurtenances.
Design $50,000
Construction $250,000
Total $300,000
H. Kahuku high and intermediate school, Oahu
Design and construction to upgrade the fire alarm system; ground and site improvements; and equipment and appurtenances.
Design $350,000
Construction $1,650,000
Total $2,000,000
I. Kahuku high and intermediate school, Oahu
Design and construction to replace the gymnasium bleachers; and ground and site improvements.
Design $200,000
Construction $550,000
Total $750,000
J. Kahuku high and intermediate school, Oahu
Design and construction to implement a master plan for flood mitigation; and ground and site improvements.
Design $500,000
Construction $2,600,000
Total $3,100,000
K. Laie elementary school, Oahu
Design and construction for ADA transition accessibility; and ground and site improvements.
Design $25,000
Construction $350,000
Total $375,000
L. Laie elementary school, Oahu
Design and construction to install air conditioning systems campus-wide; ground and site improvements; and equipment and appurtenances.
Design $250,000
Construction $4,250,000
Total $4,500,000
M. Laie elementary school, Oahu
Design and construction for drainage improvements in the building B parking lot; and ground and site improvements.
Design $50,000
Construction $225,000
Total $275,000
N. Laie elementary school, Oahu
Design and construction to install a handicap ramp for P5; and ground and site improvements.
Design $10,000
Construction $40,000
Total $50,000
O. Sunset Beach elementary school, Oahu
Design and construction to install a sidewalk from one side of the portable classrooms to the other; and ground and site improvements.
Design $25,000
Construction $150,000
Total $175,000
P. Sunset Beach elementary school, Oahu
Design and construction to repave and restripe the parking lot; and ground and site improvements.
Design $25,000
Construction $450,000
Total $475,000
Q. Waiahole elementary school, Oahu
Design and construction for a portable classroom for the special education classes; ground and site improvements; and equipment and appurtenances.
Design $88,000
Construction $612,000
Total $700,000
R. Waiahole elementary school, Oahu
Design and construction for heat abatement; and ground and site improvements.
Design $250,000
Construction $5,200,000
Total $5,450,000
S. Waialua elementary school, Oahu
Design and construction for library building improvements; ground and site improvements; and equipment and appurtenances.
Design $50,000
Construction $800,000
Total $850,000
T. Waialua elementary school, Oahu
Design and construction for a covered walkway leading to the portable classrooms; and ground and site improvements.
Design $50,000
Construction $350,000
Total $400,000
U. Waialua high and intermediate school, Oahu
Design and construction to relocate the visitor parking area; and ground and site improvements.
Design $2,000
Construction $748,000
Total $750,000
V. Waialua high and intermediate school, Oahu
Design and construction for new men's and women's restrooms at the football stadium; ground and site improvements; and equipment and appurtenances.
Design $2,000
Construction $298,000
Total $300,000
W. Waialua high and intermediate school, Oahu
Design and construction for a STEM innovation center; ground and site improvements; and equipment and appurtenances.
Design $650,000
Construction $350,000
Total $1,000,000
X. Waialua high and intermediate school, Oahu
Design and construction for a new rubber track for track and field, cross country, and physical education; ground and site improvements; and equipment and appurtenances.
Design $2,000
Construction $998,000
Total $1,000,000
2. To be expended by the department of land and natural resources:
A. Kahana Bay boat ramp, Oahu
Design and construction to repair the boat ramp and loading dock; and ground and site improvements.
Design $300,000
Construction $2,000,000
Total $2,300,000
SECTION 2. The sums appropriated for the respective capital projects set forth in section 1 shall be expended by the designated expending agency for the purposes of this Act.
SECTION 3. This Act shall take effect on July 1, 2019.
INTRODUCED BY: |
_____________________________ |
|
|
Report Title:
CIP; 47th Representative District
Description:
Appropriates funds for capital improvement projects for the benefit of the 47th Representative District.