Bill Text: HI SB2235 | 2024 | Regular Session | Introduced


Bill Title: Relating To Capital Improvement Projects For The Benefit Of The Fifteenth Senatorial District.

Spectrum: Partisan Bill (Democrat 1-0)

Status: (Introduced - Dead) 2024-01-19 - Referred to WAM. [SB2235 Detail]

Download: Hawaii-2024-SB2235-Introduced.html

THE SENATE

S.B. NO.

2235

THIRTY-SECOND LEGISLATURE, 2024

 

STATE OF HAWAII

 

 

 

 

 

 

A BILL FOR AN ACT

 

 

relating to capital improvement projects for the benefit of the fifteenth senatorial district.

 

 

BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF HAWAII:

 


     SECTION 1.  The director of finance is authorized to issue general obligation bonds in the sum of $32,401,000 or so much thereof as may be necessary and the same sum or so much thereof as may be necessary is appropriated for fiscal year 2024-2025 for the purpose of capital improvement projects for the fifteenth senatorial district, as follows:

1.   Aliamanu Elementary School

     A.   Plans, design, and construction for a chain link fence with gate access to surround the campus.

          Plans                            $1,000

          Design                          $24,000

          Construction                   $175,000

          Total funding                                 $200,000

2.   Kalihi Kai Elementary School

     A.   Design and construction for repairs and improvements to the parking lot adjacent to building K and administration building fronting Kaumualii street; ground and site improvements; equipment and appurtenances.

          Design                          $50,000

          Construction                   $450,000

          Total funding                                 $500,000

     B.   Construction for repaving and restriping of Kalihi street parking lot.

          Construction                   $200,000

          Total funding                                 $200,000

3.   Lehua Elementary School

     A.   Construction and equipment and appurtenances for a covered play court.

          Construction                 $3,000,000

          Equipment                       $50,000

          Total funding                               $3,050,000

4.   Makalapa Elementary School

     A.   Plans, design, and construction for covered walkways from C building to the dining room and from F building to A building.

          Plans                            $1,000

          Design                         $100,000

          Construction                 $1,100,000

          Total funding                               $1,201,000

5.   Moanalua High School

     A.   Design and construction for synthetic turf field and track improvements; ground and site improvements; equipment and appurtenances.

          Design                         $600,000

          Construction                 $5,200,000

          Total funding                               $5,800,000

6.   Mokulele Elementary School

     A.   Plans, design, and construction for installation of a French drain system on the side of library and administration office buildings.

          Plans                            $1,000

          Design                          $60,000

          Construction                   $639,000

          Total funding                                 $700,000

7.   Pearl Harbor Elementary School

     A.   Plans, design, and construction for the expansion of library and computer lab.

          Plans                            $1,000

          Design                         $400,000

          Construction                 $1,100,000

          Total funding                               $1,501,000

     B.   Plans, design, and construction for the expansion and pavement of the rear parking lot.

          Plans                            $1,000

          Design                         $300,000

          Construction                   $900,000

          Total funding                               $1,201,000

8.   Pearl Harbor Kai Elementary School

     A.   Construction for playground shade structure.

          Construction                   $162,000

          Total funding                                 $162,000

9.   Puuhale Elementary School

     A.   Plans, design, construction, and equipment and appurtenances for a covered multi-use outdoor learning space.

          Plans                          $150,000

          Design                         $150,000

          Construction                   $400,000

          Equipment                      $150,000

          Total funding                                 $850,000

10.  Radford High School

     A.   Construction for restriping and cleaning of the track.

          Construction                    $36,000

          Total funding                                  $36,000

11.  Salt Lake Elementary School

     A.   Plans, design, construction, and equipment and appurtenances for the installation of air conditioning in classrooms F4, F5, F6, and F7.

          Plans                          $200,000

          Design                         $300,000

          Construction                   $500,000

          Equipment                    $1,000,000

          Total funding                               $2,000,000

12.  Waipahu Elementary School

     A.   Construction for the integrated academy facility, including renovations and relocation for the academic health center; other related improvements; ground and site improvements; equipment and appurtenances.

          Construction                $15,000,000

          Total funding                              $15,000,000

     SECTION 2.  The appropriation made for the capital improvement projects authorized by this Act shall not lapse at the end of the fiscal biennium for which the appropriation is made; provided that all moneys from the appropriation unencumbered as of June 30, 2026, shall lapse as of that date.

     SECTION 3.  The sums appropriated for the respective capital improvement projects set forth in section 1 shall be expended for the purposes of this Act by the department of education.

     SECTION 4.  This Act shall take effect on July 1, 2024.

 

INTRODUCED BY:

_____________________________

 

 


 


 


 

Report Title:

CIP; 15th Senatorial District; Appropriation

 

Description:

Appropriates funds for capital improvement projects in the 15th senatorial district.

 

 

 

The summary description of legislation appearing on this page is for informational purposes only and is not legislation or evidence of legislative intent.

feedback