1 | AN ACT concerning finance.
| |||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois,
| |||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||
4 | Section 5. The Design-Build
Procurement Act is amended by | |||||||||||||||||||
5 | changing Section 10 as follows:
| |||||||||||||||||||
6 | (30 ILCS 537/10) | |||||||||||||||||||
7 | (Section scheduled to be repealed on July 1, 2027)
| |||||||||||||||||||
8 | Sec. 10. Definitions. As used in this Act:
| |||||||||||||||||||
9 | "State construction agency" means the Capital Development | |||||||||||||||||||
10 | Board.
| |||||||||||||||||||
11 | "Delivery system" means the design and construction | |||||||||||||||||||
12 | approach used to develop
and construct a project.
| |||||||||||||||||||
13 | "Design-bid-build" means the traditional delivery system | |||||||||||||||||||
14 | used on public
projects in this State that incorporates the | |||||||||||||||||||
15 | Architectural, Engineering, and
Land Surveying Qualification | |||||||||||||||||||
16 | Based Selection Act (30 ILCS 535/) and the
principles of | |||||||||||||||||||
17 | competitive selection in the Illinois Procurement Code (30 | |||||||||||||||||||
18 | ILCS
500/).
| |||||||||||||||||||
19 | "Design-build" means a delivery system that provides | |||||||||||||||||||
20 | responsibility within a
single contract for the furnishing of | |||||||||||||||||||
21 | architecture, engineering, land surveying
and related services | |||||||||||||||||||
22 | as required, and the labor, materials, equipment, and
other | |||||||||||||||||||
23 | construction services for the project.
"Design-build" |
| |||||||
| |||||||
1 | includes, but is not limited to, the progressive design-build | ||||||
2 | delivery method.
| ||||||
3 | "Design-build contract" means a contract for a public | ||||||
4 | project under this Act
between the State construction agency | ||||||
5 | and a design-build entity to furnish
architecture,
| ||||||
6 | engineering, land surveying, and related services as required, | ||||||
7 | and to furnish
the labor, materials, equipment, and other | ||||||
8 | construction services for the
project. The design-build | ||||||
9 | contract may be conditioned upon subsequent
refinements in | ||||||
10 | scope and price and may allow the State construction agency to
| ||||||
11 | make
modifications in the project scope without invalidating | ||||||
12 | the design-build
contract.
| ||||||
13 | "Design-build entity" means any individual, sole | ||||||
14 | proprietorship, firm,
partnership, joint venture, corporation, | ||||||
15 | professional corporation, or other
entity that proposes to | ||||||
16 | design and construct any public project under this Act.
A | ||||||
17 | design-build entity and associated design-build professionals | ||||||
18 | shall conduct themselves in accordance with the laws of this | ||||||
19 | State and the related provisions of the Illinois | ||||||
20 | Administrative Code, as referenced by the licensed design | ||||||
21 | professionals Acts of this State.
| ||||||
22 | "Design professional" means any individual, sole | ||||||
23 | proprietorship, firm,
partnership, joint venture, corporation, | ||||||
24 | professional corporation, or other
entity that offers services | ||||||
25 | under the Illinois Architecture Practice Act of
1989 (225 ILCS | ||||||
26 | 305/), the Professional Engineering Practice Act of 1989 (225
|
| |||||||
| |||||||
1 | ILCS 325/),
the Structural Engineering Licensing Act of 1989 | ||||||
2 | (225 ILCS 340/), or the
Illinois Professional
Land Surveyor | ||||||
3 | Act of 1989 (225 ILCS 330/).
| ||||||
4 | "Evaluation criteria" means the requirements for the | ||||||
5 | separate phases of the
selection process as defined in this | ||||||
6 | Act and may include the specialized
experience, technical | ||||||
7 | qualifications and competence, capacity to perform, past
| ||||||
8 | performance, experience with similar projects, assignment of | ||||||
9 | personnel to the
project, and other appropriate factors. Price | ||||||
10 | may not be used as a factor in
the evaluation of Phase I | ||||||
11 | proposals.
| ||||||
12 | "Progressive design-build delivery method" means a | ||||||
13 | design-build project delivery method that consists of 2 | ||||||
14 | phases. The first phase includes budget-level design | ||||||
15 | development, preconstruction services, and negotiation of a | ||||||
16 | contract price (either lump sum or guaranteed maximum price), | ||||||
17 | and the second phase includes final design, construction, and | ||||||
18 | commissioning of the project. | ||||||
19 | "Proposal" means the offer to enter into a design-build | ||||||
20 | contract as submitted
by a design-build entity in accordance | ||||||
21 | with this Act.
| ||||||
22 | "Request for proposal" means the document used by the | ||||||
23 | State construction agency
to solicit
proposals for a | ||||||
24 | design-build contract.
| ||||||
25 | "Scope and performance criteria" means the requirements | ||||||
26 | for the public
project, including but not limited to, the |
| |||||||
| |||||||
1 | intended usage, capacity, size,
scope, quality and performance | ||||||
2 | standards, life-cycle costs, and other
programmatic criteria | ||||||
3 | that are expressed in performance-oriented and
quantifiable | ||||||
4 | specifications and drawings that can be reasonably inferred | ||||||
5 | and
are suited to allow a design-build entity to develop a | ||||||
6 | proposal.
| ||||||
7 | (Source: P.A. 94-716, eff. 12-13-05 .)
|