Bill Text: IL SB1421 | 2015-2016 | 99th General Assembly | Enrolled
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Amends the Public Utilities Act. Provides that a public utility that provides both water and wastewater service may request in a general rate proceeding that the Commission allocate a portion of the public utility's water service revenue requirement for recovery through wastewater base rates or allocate a portion of the public utility's wastewater revenue requirement for recovery through water base rates, and, if requested, the Commission may approve the allocation if it can be shown to be in the public interest.
Spectrum: Slight Partisan Bill (Democrat 7-3)
Status: (Failed) 2015-09-24 - Total Veto Stands [SB1421 Detail]
Download: Illinois-2015-SB1421-Enrolled.html
Bill Title: Amends the Public Utilities Act. Provides that a public utility that provides both water and wastewater service may request in a general rate proceeding that the Commission allocate a portion of the public utility's water service revenue requirement for recovery through wastewater base rates or allocate a portion of the public utility's wastewater revenue requirement for recovery through water base rates, and, if requested, the Commission may approve the allocation if it can be shown to be in the public interest.
Spectrum: Slight Partisan Bill (Democrat 7-3)
Status: (Failed) 2015-09-24 - Total Veto Stands [SB1421 Detail]
Download: Illinois-2015-SB1421-Enrolled.html
| |||||||
| |||||||
| |||||||
1 | AN ACT concerning regulation.
| ||||||
2 | Be it enacted by the People of the State of Illinois,
| ||||||
3 | represented in the General Assembly:
| ||||||
4 | Section 5. The Public Utilities Act is amended by adding | ||||||
5 | Section 9-211.5 as follows:
| ||||||
6 | (220 ILCS 5/9-211.5 new) | ||||||
7 | Sec. 9-211.5. Recovery of water and wastewater service | ||||||
8 | revenue requirements. A public utility that provides both water | ||||||
9 | and wastewater service may request in a general rate proceeding | ||||||
10 | that the Commission allocate a portion of the public utility's | ||||||
11 | water service revenue requirement for recovery through | ||||||
12 | wastewater base rates or allocate a portion of the public | ||||||
13 | utility's wastewater revenue requirement for recovery through | ||||||
14 | water base rates, and, if requested, the Commission may approve | ||||||
15 | the allocation if it can be shown to be in the public interest.
|