Bill Text: IL SB3968 | 2023-2024 | 103rd General Assembly | Introduced
Bill Title: Amends the Environmental Protection Act. Provides that no person shall conduct a carbon sequestration activity within a sequestration facility that overlies, underlies, or passes through a sole-source aquifer. Defines "sole-source aquifer". Effective immediately.
Spectrum: Moderate Partisan Bill (Democrat 7-2)
Status: (Introduced) 2024-12-05 - Added as Co-Sponsor Sen. Mary Edly-Allen [SB3968 Detail]
Download: Illinois-2023-SB3968-Introduced.html
| ||||||||||||||||||||||
| ||||||||||||||||||||||
| ||||||||||||||||||||||
1 | AN ACT concerning safety.
| |||||||||||||||||||||
2 | Be it enacted by the People of the State of Illinois, | |||||||||||||||||||||
3 | represented in the General Assembly:
| |||||||||||||||||||||
4 | Section 5. The Environmental Protection Act is amended by | |||||||||||||||||||||
5 | changing Sections 59 and 59.5 as follows:
| |||||||||||||||||||||
6 | (415 ILCS 5/59) | |||||||||||||||||||||
7 | Sec. 59. Definitions. As used in this Title: | |||||||||||||||||||||
8 | "Carbon dioxide capture project" mean a project or | |||||||||||||||||||||
9 | facility that: | |||||||||||||||||||||
10 | (1) uses equipment to capture a significant quantity | |||||||||||||||||||||
11 | of carbon dioxide directly from the ambient air or uses a | |||||||||||||||||||||
12 | process to separate carbon dioxide from industrial or | |||||||||||||||||||||
13 | energy-related sources, other than oil or gas production | |||||||||||||||||||||
14 | from a well; and | |||||||||||||||||||||
15 | (2) produces a concentrated fluid of carbon dioxide. | |||||||||||||||||||||
16 | "Carbon dioxide stream" means carbon dioxide, any | |||||||||||||||||||||
17 | incidental associated substances derived from the source | |||||||||||||||||||||
18 | materials and process of producing or capturing carbon | |||||||||||||||||||||
19 | dioxide, and any substance added to the stream to enable or | |||||||||||||||||||||
20 | improve the injection process or the detection of a leak or | |||||||||||||||||||||
21 | rupture. | |||||||||||||||||||||
22 | "Carbon sequestration activity" means the injection of one | |||||||||||||||||||||
23 | or more carbon dioxide streams into underground geologic |
| |||||||
| |||||||
1 | formations under at least one Class VI well permit for | ||||||
2 | long-term sequestration. | ||||||
3 | "Criteria pollutants" means the 6 pollutants for which the | ||||||
4 | United States Environmental Protection Agency has set National | ||||||
5 | Ambient Air Quality Standards under Section 109 of the Clean | ||||||
6 | Air Act, together with recognized precursors to those | ||||||
7 | pollutants. | ||||||
8 | "Project labor agreement" means a prehire collective | ||||||
9 | bargaining agreement that covers all terms and conditions of | ||||||
10 | employment on a specific construction project and must include | ||||||
11 | the following: | ||||||
12 | (1) provisions establishing the minimum hourly wage | ||||||
13 | for each class of labor organization employee; | ||||||
14 | (2) provisions establishing the benefits and other | ||||||
15 | compensation for each class of labor organization | ||||||
16 | employee; | ||||||
17 | (3) provisions establishing that no strike or disputes | ||||||
18 | will be engaged in by the labor organization employees; | ||||||
19 | (4) provisions establishing that no lockout or | ||||||
20 | disputes will be engaged in by the general contractor | ||||||
21 | building the project; and | ||||||
22 | (5) provisions for minorities and women, as defined | ||||||
23 | under the Business Enterprise for Minorities, Women, and | ||||||
24 | Persons with Disabilities Act, setting forth goals for | ||||||
25 | apprenticeship hours to be performed by minorities and | ||||||
26 | women and setting forth goals for total hours to be |
| |||||||
| |||||||
1 | performed by underrepresented minorities and women. | ||||||
2 | "Project labor agreement" includes other terms and conditions | ||||||
3 | a labor organization or general contractor building the | ||||||
4 | project deems necessary. | ||||||
5 | "Sequestration facility" means the carbon dioxide | ||||||
6 | sequestration reservoir, underground equipment, including, but | ||||||
7 | not limited to, well penetrations, and surface facilities and | ||||||
8 | equipment used or proposed to be used in a carbon | ||||||
9 | sequestration activity. "Sequestration facility" includes each | ||||||
10 | injection well and equipment used to connect surface | ||||||
11 | activities to the carbon dioxide sequestration reservoir and | ||||||
12 | underground equipment. "Sequestration facility" does not | ||||||
13 | include pipelines used to transport carbon dioxide to a | ||||||
14 | sequestration facility. | ||||||
15 | "Sole-source aquifer" means an aquifer designated as a | ||||||
16 | sole-source or principal aquifer by the United States | ||||||
17 | Environmental Protection Agency under the federal Safe | ||||||
18 | Drinking Water Act, together with the aquifer's upstream | ||||||
19 | areas, which, for purposes of this definition, consist of the | ||||||
20 | project review area of the aquifer, as identified by the | ||||||
21 | United States Environmental Protection Agency. | ||||||
22 | (Source: P.A. 103-651, eff. 7-18-24.)
| ||||||
23 | (415 ILCS 5/59.5) | ||||||
24 | Sec. 59.5. Prohibitions. | ||||||
25 | (a) No person shall conduct a carbon sequestration |
| |||||||
| |||||||
1 | activity without a permit issued by the Agency under Section | ||||||
2 | 59.6. This prohibition does not apply to any carbon | ||||||
3 | sequestration activity in existence and permitted by the | ||||||
4 | United States Environmental Protection Agency on or before the | ||||||
5 | effective date of this amendatory Act of the 103rd General | ||||||
6 | Assembly or to any Class VI well for which (1) a Class VI well | ||||||
7 | permit has been filed with the United States Environmental | ||||||
8 | Protection Agency and a completeness determination had been | ||||||
9 | received prior to January 1, 2023, and (2) the sequestration | ||||||
10 | activity will occur on a contiguous property with common | ||||||
11 | ownership where the carbon dioxide is generated, captured, and | ||||||
12 | injected. | ||||||
13 | (b) No person shall conduct a carbon sequestration | ||||||
14 | activity in violation of this Act. | ||||||
15 | (c) No person shall conduct a carbon sequestration | ||||||
16 | activity in violation of any applicable rules adopted by the | ||||||
17 | Pollution Control Board. | ||||||
18 | (d) No person shall conduct a carbon sequestration | ||||||
19 | activity in violation of a permit issued by the Agency under | ||||||
20 | this Act. | ||||||
21 | (e) No person shall fail to submit reports required by | ||||||
22 | this Act or required by a permit issued by the Agency under | ||||||
23 | this Act. | ||||||
24 | (f) No person shall conduct a carbon sequestration | ||||||
25 | activity without obtaining an order for integration of pore | ||||||
26 | space from the Department of Natural Resources, if applicable. |
| |||||||
| |||||||
1 | (g) No person shall conduct a carbon sequestration | ||||||
2 | activity within a sequestration facility that overlies, | ||||||
3 | underlies, or passes through a sole-source aquifer. | ||||||
4 | (Source: P.A. 103-651, eff. 7-18-24.)
|