Bill Text: IN SB0365 | 2013 | Regular Session | Enrolled


Bill Title: Utility facility relocation.

Spectrum: Slight Partisan Bill (Republican 2-1)

Status: (Passed) 2013-05-13 - Public Law 79 [SB0365 Detail]

Download: Indiana-2013-SB0365-Enrolled.html


First Regular Session 118th General Assembly (2013)


PRINTING CODE. Amendments: Whenever an existing statute (or a section of the Indiana Constitution) is being amended, the text of the existing provision will appear in this style type, additions will appear in this style type, and deletions will appear in this style type.
Additions: Whenever a new statutory provision is being enacted (or a new constitutional provision adopted), the text of the new provision will appear in this style type. Also, the word NEW will appear in that style type in the introductory clause of each SECTION that adds a new provision to the Indiana Code or the Indiana Constitution.
Conflict reconciliation: Text in a statute in this style type or this style type reconciles conflicts between statutes enacted by the 2012 Regular Session of the General Assembly.


    SENATE ENROLLED ACT No. 365



     AN ACT to amend the Indiana Code concerning utilities.

Be it enacted by the General Assembly of the State of Indiana:

SOURCE: IC 36-9-42; (13)SE0365.1.1. -->
    SECTION 1. IC 36-9-42 IS ADDED TO THE INDIANA CODE AS A NEW CHAPTER TO READ AS FOLLOWS [EFFECTIVE JULY 1, 2013]:
     Chapter 42. Utility Relocations
    Sec. 1. As used in this chapter, "cost of relocation" has the meaning set forth in IC 8-1-9-2(b).
    Sec. 2. As used in this chapter, "facility" has the meaning set forth in IC 8-1-26-7.
    Sec. 3. As used in this chapter, "improvement project" means a project undertaken by a unit that involves:
        (1) a highway, street, or road that is under the jurisdiction of the unit; and
        (2) the relocation of a facility.
    Sec. 4. As used in this chapter, "major project" means an improvement project designated by a unit as a major project under section 6 of this chapter.
    Sec. 5. As used in this chapter, "utility" means the owner of a facility.
    Sec. 6. (a) A unit may designate an improvement project as a major project. The unit shall consider the scope, complexity, and duration of the project in making the designation.
    (b) Before undertaking a major project, a unit shall make a

reasonable effort to do the following:
        (1) Identify each facility located in a public right of way within the geographical limits of the major project by:
            (A) investigating field conditions; and
            (B) reviewing base map data that is:
                (i) maintained and updated by the association (as defined in IC 8-1-26-3) under IC 8-1-26-17(c); and
                (ii) made available by the association to the unit.
        (2) Notify each utility that owns a facility identified under subdivision (1) of the major project and the need, if any, to relocate the facility.
    Sec. 7. A unit may enter into an agreement with a utility described in section 6(b)(2) of this chapter concerning the relocation of the facility. The agreement must include the following:
        (1) A date certain by which the utility agrees to relocate the facility.
        (2) Conditions under which the utility is excused from relocating the facility by the date described in subdivision (1), including the following:
            (A) The facility relocation was affected by:
                (i) significantly differing site conditions;
                (ii) unexpected impacts of other utilities; or
                (iii) a force majeure event.
            (B) Severe weather, delays in acquiring a relocation area, or other factors beyond the control of the utility.
        (3) Conditions under which the unit must notify the utility of cancellations, delays, or changes related to the major project.
    Sec. 8. If, as part of an improvement project, a unit is responsible for relocation costs, the unit shall pay the relocation costs in arrears in accordance with accounting procedures established by the state board of accounts.

     Sec. 9. This chapter does not limit or alter the authority of the Indiana utility regulatory commission under IC 8-1-2-101 to review a unit's determination, or the rights and duties of affected parties, with respect to use of a public right of way as set forth in IC 8-1-2-101.


SEA 365 _ Concur

Figure

Graphic file number 0 named seal1001.pcx with height 58 p and width 72 p Left aligned


feedback