NJ A3963 | 2012-2013 | Regular Session
Status
Spectrum: Partisan Bill (Democrat 1-0)
Status: Introduced on April 4 2013 - 25% progression, died in committee
Action: 2013-04-04 - Introduced, Referred to Assembly Telecommunications and Utilities Committee
Pending: Assembly Telecommunications and Utilities Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on April 4 2013 - 25% progression, died in committee
Action: 2013-04-04 - Introduced, Referred to Assembly Telecommunications and Utilities Committee
Pending: Assembly Telecommunications and Utilities Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Requires BPU to provide grants for cost of purchase and installation of certain electric metering equipment for solar electric power generation systems.
Title
Requires BPU to provide grants for cost of purchase and installation of certain electric metering equipment for solar electric power generation systems.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2013-04-04 | Assembly | Introduced, Referred to Assembly Telecommunications and Utilities Committee |
Same As/Similar To
S2613 (Same As) 2013-03-04 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
Subjects
New Jersey State Sources
Type | Source |
---|---|
Summary | https://www.njleg.state.nj.us/bill-search/2012/A3963 |
Text | https://pub.njleg.gov/Bills/2012/A4000/3963_I1.HTM |