NJ A4756 | 2016-2017 | Regular Session
Status
Spectrum: Partisan Bill (Democrat 4-0)
Status: Introduced on March 23 2017 - 25% progression, died in chamber
Action: 2017-06-29 - Substituted by S3181 (2R)
Text: Latest bill text (Amended) [HTML]
Status: Introduced on March 23 2017 - 25% progression, died in chamber
Action: 2017-06-29 - Substituted by S3181 (2R)
Text: Latest bill text (Amended) [HTML]
Summary
Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system.
Title
Permits solar electric power generation facility projects not having commenced commercial operation to retain designation through May 31, 2018 as connected to distribution system.
Sponsors
Roll Calls
2017-05-11 - Assembly - Assembly Telecommunications and Utilities Committee: Reported Favorably (Y: 7 N: 0 NV: 1 Abs: 0) [PASS]
History
Date | Chamber | Action |
---|---|---|
2017-06-29 | Assembly | Substituted by S3181 (2R) |
2017-06-08 | Assembly | Assembly Floor Amendment Passed (Jones) |
2017-05-22 | Assembly | Assembly Floor Amendment Passed (Tucker) |
2017-05-11 | Assembly | Reported out of Assembly Committee, 2nd Reading |
2017-03-23 | Assembly | Introduced, Referred to Assembly Telecommunications and Utilities Committee |
Same As/Similar To
S3181 (Same As) 2017-07-21 - Approved P.L.2017, c.139.