NJ A552 | 2024-2025 | Regular Session
Note: Carry Over of previous A1273
Note: Carry Over of previous S3373
Note: Carry Over of previous S3373
Status
Spectrum: Partisan Bill (Democrat 3-0)
Status: Introduced on January 9 2024 - 25% progression
Action: 2024-01-09 - Introduced, Referred to Assembly Environment, Natural Resources, and Solid Waste Committee
Pending: Assembly Environment, Natural Resources, and Solid Waste Committee Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on January 9 2024 - 25% progression
Action: 2024-01-09 - Introduced, Referred to Assembly Environment, Natural Resources, and Solid Waste Committee
Pending: Assembly Environment, Natural Resources, and Solid Waste Committee Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Requires manufacturers of electric vehicles to establish and implement electric vehicle battery management plans.
Title
Requires manufacturers of electric vehicles to establish and implement electric vehicle battery management plans.
Sponsors
History
Date | Chamber | Action |
---|---|---|
2024-01-09 | Assembly | Introduced, Referred to Assembly Environment, Natural Resources, and Solid Waste Committee |
Same As/Similar To
A1273 (Carry Over) 2022-01-11 - Introduced, Referred to Assembly Environment and Solid Waste Committee
S3373 (Carry Over) 2022-12-01 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
S243 (Same As) 2024-01-09 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
S3373 (Carry Over) 2022-12-01 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
S243 (Same As) 2024-01-09 - Introduced in the Senate, Referred to Senate Environment and Energy Committee
Subjects
New Jersey State Sources
Type | Source |
---|---|
Summary | https://www.njleg.state.nj.us/bill-search/2024/A552 |
Text | https://pub.njleg.gov/Bills/2024/A1000/552_I1.HTM |