Bill Text: NJ A3850 | 2014-2015 | Regular Session | Introduced

NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Requires BPU to establish procedures allowing electric power and gas supplier customers to switch energy suppliers.

Spectrum: Moderate Partisan Bill (Democrat 12-3)

Status: (Passed) 2016-01-19 - Approved P.L.2015, c.291. [A3850 Detail]

Download: New_Jersey-2014-A3850-Introduced.html

ASSEMBLY, No. 3850

STATE OF NEW JERSEY

216th LEGISLATURE

 

INTRODUCED OCTOBER 23, 2014

 


 

Sponsored by:

Assemblyman  WAYNE P. DEANGELO

District 14 (Mercer and Middlesex)

 

 

 

 

SYNOPSIS

     Requires BPU to establish procedures allowing electric power and gas supplier customers to switch energy suppliers.

 

CURRENT VERSION OF TEXT

     As introduced.

  


An Act concerning third-party electric power and gas supplier customer contracts, and supplementing P.L.1999, c.23.

 

     Be It Enacted by the Senate and General Assembly of the State of New Jersey:

 

     1.    The Board of Public Utilities shall establish procedures to ensure that within 30 calendar days of a customer's request, a customer shall be permitted to switch electric generation service from an electric power supplier to a basic generation service provider, or switch gas supply service from a gas supplier to a basic gas supply service.

 

     2.    This act shall take effect on the 60th day after the date of enactment and shall apply to contracts formed or renewed on or after the effective date of this act.

 

 

STATEMENT

 

     This bill requires the Board of Public Utilities to establish procedures to ensure that within 30 calendar days of a customer's request, a customer shall be permitted to switch electric generation service from an electric power supplier to a basic generation service provider, or switch gas supply service from a gas supplier to a basic gas supply service.

feedback