NY A05198 | 2023-2024 | General Assembly
Status
Spectrum: Partisan Bill (Republican 34-0)
Status: Introduced on March 3 2023 - 25% progression, died in committee
Action: 2024-01-03 - referred to energy
Pending: Assembly Energy Committee
Text: Latest bill text (Introduced) [HTML]
Status: Introduced on March 3 2023 - 25% progression, died in committee
Action: 2024-01-03 - referred to energy
Pending: Assembly Energy Committee
Text: Latest bill text (Introduced) [HTML]
Summary
Directs the public service commission in consultation with NYSERDA to conduct a full cost benefit analysis of the technical and economic feasibility of renewable energy systems in the state of New York and to compare such directly with other methods of electricity generation within nine months after the effective date and every four years thereafter.
Title
Directs the public service commission in consultation with NYSERDA to conduct a full cost benefit analysis of the technical and economic feasibility of renewable energy systems in the state of New York and to compare such directly with other methods of electricity generation within nine months after the effective date and every four years thereafter.
Sponsors
Roll Calls
2023-05-23 - Assembly - Assembly Energy Committee: Held for Consideration (Y: 12 N: 5 NV: 0 Abs: 0) [PASS]
History
Date | Chamber | Action |
---|---|---|
2024-01-03 | Assembly | referred to energy |
2023-05-23 | Assembly | held for consideration in energy |
2023-03-03 | Assembly | referred to energy |
Same As/Similar To
S02030 (Same As) 2024-05-07 - DEFEATED IN ENERGY AND TELECOMMUNICATIONS