RI H7532 | 2012 | Regular Session
Status
Completed Legislative Action
Spectrum: Partisan Bill (Democrat 2-0)
Status: Passed on June 6 2012 - 100% progression
Action: 2012-06-06 - Signed by Governor
Text: Latest bill text (Draft #1) [PDF]
Spectrum: Partisan Bill (Democrat 2-0)
Status: Passed on June 6 2012 - 100% progression
Action: 2012-06-06 - Signed by Governor
Text: Latest bill text (Draft #1) [PDF]
Summary
An Act Relating To Public Utilities And Carriers - Duties Of Utilities And Carriers (would Require That The Public Utilities Commission & The Ri Division Of Utilities And Carriers Establish A Program To Require Electric Utilities To Conduct Voltage Detection Surveys & Complete Timely Repairs Of Faults Contributing To Contact Voltage.)
Title
An Act Relating To Public Utilities And Carriers - Duties Of Utilities And Carriers (would Require That The Public Utilities Commission & The Ri Division Of Utilities And Carriers Establish A Program To Require Electric Utilities To Conduct Voltage Detection Surveys & Complete Timely Repairs Of Faults Contributing To Contact Voltage.)
Sponsors
History
Date | Chamber | Action |
---|---|---|
2012-06-06 | Signed by Governor | |
2012-05-31 | Transmitted to Governor | |
2012-05-31 | Senate passed Sub A in concurrence | |
2012-05-30 | Placed on the Senate Consent Calendar (05/31/2012) | |
2012-05-29 | House passed Sub A | |
2012-05-23 | Placed on House Calendar (05/29/2012) | |
2012-05-23 | Committee recommends passage of Sub A | |
2012-05-19 | Scheduled for hearing and/or consideration (05/23/2012) | |
2012-03-13 | Committee recommended measure be held for further study | |
2012-02-20 | Scheduled for hearing and/or consideration (03/13/2012) | |
2012-02-15 | Introduced, referred to House Corporations |
Rhode Island State Sources
Type | Source |
---|---|
Summary | https://status.rilegislature.gov/ |
Text | https://www.rilin.state.ri.us/BillText12/HouseText12/H7532.pdf |