Bill Text: RI S2506 | 2024 | Regular Session | Introduced
Bill Title: Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Spectrum: Partisan Bill (Republican 3-0)
Status: (Introduced - Dead) 2024-04-30 - Committee recommended measure be held for further study [S2506 Detail]
Download: Rhode_Island-2024-S2506-Introduced.pdf