Votes: RI S2506 | 2024 | Regular Session
Bill Title: Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Spectrum: Partisan Bill (Republican 3-0)
Status: (Introduced - Dead) 2024-04-30 - Committee recommended measure be held for further study [S2506 Detail]
Text: Latest bill text (Introduced) [PDF]
Spectrum: Partisan Bill (Republican 3-0)
Status: (Introduced - Dead) 2024-04-30 - Committee recommended measure be held for further study [S2506 Detail]
Text: Latest bill text (Introduced) [PDF]
Voting Records
Chamber | Vote | Date | Yea | Nay | NV | Abs | Total | Result | Source | View |
---|---|---|---|---|---|---|---|---|---|---|
Senate | Senate Committee on Commerce: Be held for further study | 2024-04-30 | 8 | 0 | 0 | 1 | 9 | Passed | Link | View |