Votes: RI H7810 | 2024 | Regular Session
Bill Title: Requires the public utilities commission (PUC) to produce a report by January 1, 2025 and each January 1 thereafter, on the ability for the current electric grid to handle the electrification load need to power cars, buildings, and heating of homes.
Spectrum: Slight Partisan Bill (Republican 6-1-1)
Status: (Introduced - Dead) 2024-03-21 - Committee recommended measure be held for further study [H7810 Detail]
Text: Latest bill text (Introduced) [PDF]
States not producing parsable votes may be available as images in Supplemental Documents.
Spectrum: Slight Partisan Bill (Republican 6-1-1)
Status: (Introduced - Dead) 2024-03-21 - Committee recommended measure be held for further study [H7810 Detail]
Text: Latest bill text (Introduced) [PDF]
Voting Records
Chamber | Vote | Date | Yea | Nay | NV | Abs | Total | Result | Source | View |
---|---|---|---|---|---|---|---|---|---|---|
No roll call record information currently on file. |