Bill Text: TX HB2452 | 2013-2014 | 83rd Legislature | Comm Sub
Bill Title: Relating to the appointment of a watermaster for the Brazos River Basin; providing for a limitation on certain fees.
Spectrum: Moderate Partisan Bill (Republican 5-1)
Status: (Introduced - Dead) 2013-04-29 - Considered in Calendars [HB2452 Detail]
Download: Texas-2013-HB2452-Comm_Sub.html
83R17176 JAM-F | |||
By: Bonnen of Brazoria, Eiland, | H.B. No. 2452 | ||
Thompson of Brazoria, | |||
Bonnen of Galveston, Ritter, et al. | |||
Substitute the following for H.B. |
|
||
|
||
relating to the appointment of a watermaster for the Brazos River | ||
Basin; providing for a limitation on certain fees. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 11.325, Water Code, is amended to read as | ||
follows: | ||
Sec. 11.325. WATER DIVISIONS. (a) Subject to Subsection | ||
(b), the [ |
||
divisions for the purpose of administering adjudicated water | ||
rights. Water divisions may be created from time to time as the | ||
necessity arises. The divisions shall be constituted to secure the | ||
best protection to the holders of water rights and the most | ||
economical supervision on the part of the state. | ||
(b) The commission shall create a water division that | ||
includes the entire Brazos River Basin. | ||
SECTION 2. Section 11.326(a), Water Code, is amended to | ||
read as follows: | ||
(a) The executive director: | ||
(1) shall appoint a watermaster for the water division | ||
created under Section 11.325(b); and | ||
(2) may appoint one watermaster for each other water | ||
division. | ||
SECTION 3. Section 11.329, Water Code, is amended by | ||
amending Subsection (c) and adding Subsection (c-1) to read as | ||
follows: | ||
(c) The commission shall hold a public hearing on the | ||
proposed fiscal year budget for each watermaster operation. The | ||
commission shall determine the apportionment of the costs of | ||
administration of adjudicated water rights among the holders of the | ||
rights. After a public hearing, the commission shall issue an order | ||
assessing the annual cost against the holders of water rights to | ||
whom the water will be distributed under the final decree. Subject | ||
to Subsection (c-1), the [ |
||
the costs. The executive director may provide for payments in | ||
installments and shall specify the dates by which payments shall be | ||
made to the commission. At the request of the watermaster advisory | ||
committee the commission may modify a fiscal year budget for any | ||
water division. | ||
(c-1) An annual fee assessed by the commission to fund the | ||
Brazos River watermaster program may not: | ||
(1) exceed $120 for the holder of a right to | ||
appropriate water from the Brazos River solely for agricultural | ||
use; or | ||
(2) be assessed against a person who takes water | ||
solely for domestic or livestock purposes. | ||
SECTION 4. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2013. |