Bill Text: TX HB2476 | 2021-2022 | 87th Legislature | Introduced
Bill Title: Relating to the weather emergency preparedness of facilities for providing gas or electric service.
Spectrum: Partisan Bill (Republican 2-0)
Status: (Introduced - Dead) 2021-03-16 - Referred to State Affairs [HB2476 Detail]
Download: Texas-2021-HB2476-Introduced.html
87R10832 JXC-D | ||
By: Allison | H.B. No. 2476 |
|
||
|
||
relating to the weather emergency preparedness of facilities for | ||
providing gas or electric service. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Subchapter C, Chapter 86, Natural Resources | ||
Code, is amended by adding Section 86.044 to read as follows: | ||
Sec. 86.044. WEATHER EMERGENCY PREPAREDNESS. The | ||
commission by rule shall require an operator of a gas well to | ||
implement measures to prepare the well to operate during a weather | ||
emergency. | ||
SECTION 2. Subchapter A, Chapter 35, Utilities Code, is | ||
amended by adding Section 35.0021 to read as follows: | ||
Sec. 35.0021. WEATHER EMERGENCY PREPAREDNESS. The | ||
commission by rule shall require each provider of generation in the | ||
ERCOT power region to implement measures to prepare generation | ||
facilities to provide adequate electric generation service during a | ||
weather emergency. | ||
SECTION 3. Subchapter D, Chapter 38, Utilities Code, is | ||
amended by adding Section 38.074 to read as follows: | ||
Sec. 38.074. WEATHER EMERGENCY PREPAREDNESS. The | ||
commission by rule shall require each electric cooperative, | ||
municipally owned utility, and transmission and distribution | ||
utility providing transmission or distribution service in the ERCOT | ||
power region to implement measures to prepare facilities to | ||
maintain service quality and reliability during a weather | ||
emergency. | ||
SECTION 4. Section 121.2015(a), Utilities Code, is amended | ||
to read as follows: | ||
(a) The railroad commission shall adopt rules regarding: | ||
(1) public education and awareness relating to gas | ||
pipeline facilities; [ |
||
(2) community liaison for responding to an emergency | ||
relating to a gas pipeline facility; and | ||
(3) measures gas pipeline facility operators must | ||
implement to prepare gas pipeline facilities to maintain service | ||
quality and reliability during a weather emergency. | ||
SECTION 5. This Act takes effect September 1, 2021. |