Bill Text: TX HB3595 | 2011-2012 | 82nd Legislature | Introduced
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Relating to energy efficiency goals and energy efficiency programs.
Spectrum: Slight Partisan Bill (Republican 2-1)
Status: (Engrossed - Dead) 2011-05-25 - Senate Amendments Analysis distributed [HB3595 Detail]
Download: Texas-2011-HB3595-Introduced.html
Bill Title: Relating to energy efficiency goals and energy efficiency programs.
Spectrum: Slight Partisan Bill (Republican 2-1)
Status: (Engrossed - Dead) 2011-05-25 - Senate Amendments Analysis distributed [HB3595 Detail]
Download: Texas-2011-HB3595-Introduced.html
By: Chisum | H.B. No. 3595 |
|
||
|
||
relating to energy efficiency goals and energy efficiency programs. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 39.905, Utilities Code, is amended to read as | ||
follows: | ||
(a) It is the goal of the legislature that: | ||
(1) electric utilities will administer energy | ||
efficiency incentive programs in a market-neutral, | ||
nondiscriminatory manner but will not offer underlying competitive | ||
services; | ||
(2) all customers, in all customer classes and | ||
geographic regions, will have a choice of and access to energy | ||
efficiency alternatives and other choices from the market that | ||
allow each customer to reduce energy consumption, summer or winter | ||
peak demand, or energy costs; | ||
(3) each electric utility will provide, through | ||
market-based standard offer programs or [ |
||
market-transformation programs, incentives sufficient for retail | ||
electric providers and competitive energy service providers to | ||
acquire additional cost-effective energy efficiency for | ||
residential and commercial customers equivalent to at least: | ||
(A) 25 [ |
||
annual growth in demand of residential and commercial customers by | ||
December 31, 2012 [ |
||
(B) one-half of one [ |
||
utility's peak [ |
||
commercial customers by December 31, 2013 [ |
||
(C) a percentage of peak demand of residential | ||
and commercial customers by December 31, 2014 and each year | ||
thereafter that the Commission annually shall determine to be | ||
reasonable to achieve, although the percentage shall not be less | ||
than one-half of one percent of the electric utility's peak demand | ||
of residential and commercial customers nor, except for good cause | ||
shown for an electric utility, less than any prior year's goal [ |
||
(4) each electric utility in the ERCOT region shall | ||
use its best efforts to encourage and facilitate the involvement of | ||
the region's retail electric providers in the delivery of | ||
efficiency programs and demand response programs under this | ||
section; | ||
(5) retail electric providers in the ERCOT region, and | ||
electric utilities outside of the ERCOT region, shall provide | ||
customers with energy efficiency educational materials; | ||
(6) electric utilities may communicate with customers | ||
and provide rebate or incentive funds to their customers to promote | ||
of facilitate the success of programs; and | ||
(7) [ |
||
utilities shall continue to make available, at 2007 funding and | ||
participation levels, any load management standard offer programs | ||
developed for industrial customers and implemented prior to May 1, | ||
2007. | ||
(b) The commission shall provide oversight and adopt rules | ||
and procedures to ensure that the utilities can achieve the goal of | ||
this section, including: | ||
(1) establishing an energy efficiency cost recovery | ||
factor for ensuring timely and reasonable cost recovery for utility | ||
expenditures made to satisfy the goal of this section; | ||
(2) establishing an incentive under Section 36.204 to | ||
reward utilities administering programs under this section that | ||
exceed the minimum goals established by this section; | ||
(3) providing a utility that is unable to establish an | ||
energy efficiency cost recovery factor in a timely manner due to a | ||
rate freeze with a mechanism to enable the utility to: | ||
(A) defer the costs of complying with this | ||
section; and | ||
(B) recover the deferred costs through an energy | ||
efficiency cost recovery factor on the expiration of the rate | ||
freeze period; | ||
(4) ensuring that the costs associated with programs | ||
provided under this section are borne by the customer classes that | ||
receive the services under the programs; and | ||
(5) ensuring the program rules encourage the value of | ||
the incentives to be passed on to the end-use customer. | ||
(b-1) The energy efficiency cost recovery factor under | ||
Subsection (b)(1) may not result in an over-recovery of costs but | ||
may be adjusted each year to change rates to enable utilities to | ||
match revenues against energy efficiency costs and any incentives | ||
to which they are granted. The factor shall be adjusted to reflect | ||
any over-collection or under-collection of energy efficiency cost | ||
recovery revenues in previous years. | ||
(b-2) [ |
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
|
||
commission, in consultation with the State Energy Conservation | ||
Office, annually for a period of five years shall compute and report | ||
to ERCOT the projected annual and measure-life energy savings and | ||
summer and winter demand impacts for each entity in the ERCOT region | ||
that administers standard offer programs, market transformation | ||
programs, combined heating and power technology, demand response | ||
programs, solar incentive programs, appliance efficiency | ||
standards, energy efficiency programs in public buildings, and any | ||
other relevant programs that are reasonably anticipated to reduce | ||
electricity energy or peak demand or that serve as substitutes for | ||
electric supply. | ||
(b-3) [ |
||
method to account for the projected efficiency impacts under | ||
Subsection (b-2) [ |
||
capacity, demand, and reserves. | ||
(c) A standard offer program provided under Subsection | ||
(a)(3) must be neutral with respect to technologies, equipment, and | ||
fuels, including thermal, chemical, mechanical, and electrical | ||
energy storage technologies. | ||
(d) The commission shall establish a procedure for | ||
reviewing and evaluating market-transformation program options | ||
described by this subsection and other options. In evaluating | ||
program options, the commission may consider the ability of a | ||
program option to reduce costs to customers through reduced demand, | ||
energy savings, and relief of congestion. Utilities may choose to | ||
implement any program option approved by the commission after its | ||
evaluation in order to satisfy the goal in Subsection (a), | ||
including: | ||
(1) energy-smart schools; | ||
(2) appliance retirement and recycling; | ||
(3) air conditioning system tune-ups; | ||
(4) the installation of variable speed air | ||
conditioning system and motors; | ||
(5) the use of trees or other landscaping for energy | ||
efficiency.; | ||
(6) [ |
||
response programs; | ||
(7) [ |
||
buildings that will achieve the levels of energy efficiency | ||
sufficient to qualify those buildings for federal tax incentives; | ||
(8) commissioning services for commercial and | ||
institutional buildings that result in operational and maintenance | ||
practices that reduce the buildings' energy consumption; | ||
(9) [ |
||
their residence or commercial space; | ||
(10) [ |
||
equipment to customers that enable a customer to better understand | ||
the amount, price, and time of the customer's energy use; | ||
(11) [ |
||
residents of single-family or multifamily residences and for small | ||
commercial customers; | ||
(12) [ |
||
(13) [ |
||
and | ||
(14) [ |
||
glazing systems, glass doors, and skylights in residential and | ||
commercial buildings that reduce solar gain by at least 30 percent | ||
from the level established for the federal Energy Star windows | ||
program. | ||
(e) An electric utility may use money approved by the | ||
commission for energy efficiency programs to perform necessary | ||
energy efficiency research and development to foster continuous | ||
improvement and innovation in the application of energy efficiency | ||
technology and energy efficiency program design and | ||
implementation. Money the utility uses under this subsection may | ||
not exceed 10 percent of the greater of: | ||
(1) the amount the commission approved for energy | ||
efficiency programs in the utility's most recent full rate | ||
proceeding; or | ||
(2) the commission-approved expenditures by the | ||
utility for energy efficiency in the previous year. | ||
(f) Unless funding is provided under Section 39.903, each | ||
unbundled transmission and distribution utility shall include in | ||
its energy efficiency plan a targeted low-income energy efficiency | ||
program as described by Section 39.903(f)(2), and the savings | ||
achieved by the program shall count toward the transmission and | ||
distribution utility's energy efficiency goal. The commission | ||
shall determine the appropriate level of funding to be allocated to | ||
both targeted and standard offer low-income energy efficiency | ||
programs in each unbundled transmission and distribution utility | ||
service area. The total expenditures for both targeted and | ||
standard offer low-income energy efficiency programs will be based | ||
on the amount spent by the transmission and distribution utility on | ||
the commission's hard-to-reach program in calendar year 2003. This | ||
level of funding for low-income energy efficiency programs shall be | ||
provided from money approved by the commission for the transmission | ||
and distribution utility's energy efficiency programs. The state | ||
agency that administers the federal weatherization assistance | ||
program shall provide reports as required by the commission to | ||
provide the most current information available on energy and peak | ||
demand savings achieved in each transmission and distribution | ||
utility service area. | ||
(g) Schools may participate in more than one program and may | ||
use more than one product or strategy in order to maximize the | ||
school's energy and cost savings. A utility may claim savings | ||
realized by the school for those programs that utilize utility | ||
resources. | ||
(h) The commission may provide for a good cause exemption to | ||
a utility's liability for an administrative penalty or other | ||
sanction if the utility fails to meet a goal for energy efficiency | ||
under this section and the utility's failure to meet the goal is | ||
caused by one or more factors outside of the utility's control, | ||
including: | ||
(1) insufficient demand by retail electric providers | ||
and competitive energy service providers for program incentive | ||
funds made available by the utility through its programs; | ||
(2) changes in building energy codes; and | ||
(3) changes in government-imposed appliance or | ||
equipment efficiency standards. | ||
SECTION 2. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2011. |