Bill Text: TX HB3675 | 2015-2016 | 84th Legislature | Introduced
Bill Title: Relating to the regulation of commercial development of groundwater in certain areas.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2015-03-19 - Referred to Natural Resources [HB3675 Detail]
Download: Texas-2015-HB3675-Introduced.html
By: Guillen | H.B. No. 3675 |
|
||
|
||
relating to the regulation of commercial development of groundwater | ||
in certain areas. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Chapter 35, Water Code, is amended by adding | ||
Section 35.021 to read as follows: | ||
Sec. 35.021. COMMERCIAL DEVELOPMENT OF GROUNDWATER IN | ||
CERTAIN ZONES. (a) In this section, "buffer zone" means an area | ||
that extends twelve miles from the boundaries of an aquifer | ||
encompassed by a groundwater conservation district that comprises | ||
of four counties, is located not greater than one hundred miles from | ||
the Gulf Coast, is located not greater than one hundred miles from | ||
the Texas-Mexico international border, and is adjacent to a county | ||
whose population is greater than 1.6 million. | ||
(b) Notwithstanding an exemption from permitting that might | ||
apply under the rules of a groundwater conservation district under | ||
Section 36.117, a person who seeks to drill or operate a well | ||
located in a buffer zone to produce groundwater for commercial | ||
purposes must submit an application for approval to drill and | ||
operate the well to the nearest geographically situated groundwater | ||
conservation district in which the aquifer is located. | ||
(c) The groundwater conservation district shall schedule, | ||
post notice for, and conduct a public hearing for comments before | ||
making a decision to approve or deny an application received under | ||
Subsection (b). | ||
(d) An application under this section must include the | ||
likely effects of the well's proposed production amounts over the | ||
25-year period that would begin on the expected date of first | ||
production from the well including: | ||
(1) potential adverse effects on the desired future | ||
condition adopted by a groundwater conservation district for the | ||
relevant aquifer under Section 36.108; | ||
(2) population growth predicted for the surrounding | ||
area; | ||
(3) shortages of surface water or groundwater | ||
resulting from a long-term drought; | ||
(4) potential land subsidence; | ||
(5) possible contamination of groundwater supplies; | ||
and | ||
(6) other issues groundwater conservation district | ||
considers relevant. | ||
(e) A well may be drilled and operated under this section | ||
only if the application is approved by the applicable groundwater | ||
conservation district, unless the well is exempt from permitting | ||
under the district's rules. | ||
SECTION 2. This Act applies only to a groundwater well for | ||
which the drilling is begun on or after the effective date of this | ||
Act. A well for which the drilling is begun before the effective | ||
date of this Act is governed by the law in effect on the date the | ||
drilling was begun, and that law is continued in effect for that | ||
purpose. | ||
SECTION 3. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2015. |