Bill Text: TX HB4164 | 2017-2018 | 85th Legislature | Introduced
Bill Title: Relating to the procedures for adopting a moratorium on the issuance of permits by groundwater conservation districts.
Spectrum: Partisan Bill (Republican 1-0)
Status: (Introduced - Dead) 2017-03-31 - Referred to Natural Resources [HB4164 Detail]
Download: Texas-2017-HB4164-Introduced.html
85R11026 AAF-F | ||
By: Larson | H.B. No. 4164 |
|
||
|
||
relating to the procedures for adopting a moratorium on the | ||
issuance of permits by groundwater conservation districts. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Chapter 36, Water Code, is amended by adding | ||
Subchapter M-1 to read as follows: | ||
SUBCHAPTER M-1. MORATORIUM ON ISSUING PERMIT | ||
Sec. 36.426. PROCEDURE FOR ADOPTING MORATORIUM. A district | ||
may not adopt a moratorium on the issuance of a permit or permit | ||
amendment unless the district: | ||
(1) complies with the notice and hearing procedures | ||
prescribed by Section 36.427; and | ||
(2) makes written findings supporting the district's | ||
determination regarding the issuance, including the district's | ||
justification for imposing the moratorium, if applicable. | ||
Sec. 36.427. NOTICE AND PUBLIC HEARING REQUIREMENTS. (a) A | ||
district may impose a moratorium on the issuance of a permit or | ||
permit amendment only after the district conducts a public hearing | ||
as provided by this section. The public hearing must provide | ||
residents of the district and other affected parties an opportunity | ||
to be heard. | ||
(b) The district shall publish notice of the date, time, and | ||
place of the hearing in a newspaper of general circulation in the | ||
district on the fourth day before the date of the hearing. | ||
(c) During the period beginning on the fifth business day | ||
after the date a notice is published under Subsection (b) and ending | ||
on the date the district makes its determination under Subsection | ||
(d), a temporary moratorium is imposed. During that period, a | ||
district may stop issuing permits or permit amendments. | ||
(d) Not later than the 12th day after the date of the public | ||
hearing, the district shall make a final determination on whether | ||
to impose the moratorium and shall issue written findings | ||
supporting the district's determination, including the district's | ||
justification for imposing the moratorium, if applicable. | ||
Sec. 36.428. EXPIRATION OF MORATORIUM; EXTENSION | ||
PROHIBITED. A moratorium imposed under this subchapter expires on | ||
the 90th day after the date the district makes its determination | ||
under Section 36.427(d) to impose the moratorium. The district may | ||
not extend a moratorium imposed under this subchapter. | ||
SECTION 2. A moratorium on the issuance of a permit or | ||
permit amendment that is adopted by a groundwater conservation | ||
district before September 1, 2017, may not continue in effect later | ||
than November 30, 2017. | ||
SECTION 3. This Act takes effect September 1, 2017. |