Bill Text: TX HB632 | 2015-2016 | 84th Legislature | Introduced
Bill Title: Relating to the planning and funding of water projects to be constructed in a region other than the region proposing the project.
Spectrum: Partisan Bill (Republican 4-0)
Status: (Introduced - Dead) 2015-04-29 - Left pending in committee [HB632 Detail]
Download: Texas-2015-HB632-Introduced.html
By: Simpson | H.B. No. 632 |
|
||
|
||
r | ||
elating to the planning and funding of water projects to be | ||
constructed in a region other than the region proposing the | ||
project. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 16.053(e-1), Water Code, is amended to | ||
read as follows: | ||
(e-1) A regional water plan may not include a proposal for | ||
the construction of a water project in another regional water | ||
planning area unless at least two-thirds of the members of the | ||
regional water planning group for that area have consented to the | ||
inclusion of the proposal in the plan [ |
||
|
||
|
||
SECTION 2. Section 16.053(h)(4), Water Code, is amended to | ||
read as follows: | ||
(4) After the regional water plan is initially | ||
prepared, the regional water planning group shall submit a copy of | ||
the plan to the board. The board shall submit comments on the | ||
regional water plan as to whether the plan meets the requirements of | ||
Subsections (e) and (e-1) [ |
||
SECTION 3. Section 16.053(j), Water Code, is amended to | ||
read as follows: | ||
(j) The board may provide financial assistance to political | ||
subdivisions under Subchapters E and F of this chapter, Subchapters | ||
C, D, E, F, J, O, Q, and R, Chapter 15, and Subchapters D, I, K, and | ||
L, Chapter 17, for water supply projects only if: | ||
(1) the board determines that the needs to be | ||
addressed by the project will be addressed in a manner that is | ||
consistent with the state water plan; | ||
(2) beginning January 5, 2002[ |
||
(A) the board has approved a regional water plan | ||
as provided by Subsection (i), and any required updates of the plan, | ||
for the region of the state that includes the area benefiting from | ||
the proposed project; [ |
||
(B) if the proposed project is to be constructed | ||
in a regional water planning area other than the area benefiting | ||
from the proposed project, at least two-thirds of the members of the | ||
regional water planning group for the area in which the proposed | ||
project is to be constructed have consented to the inclusion in that | ||
regional water plan of the proposal to construct the project as | ||
required by Subsection (e-1); and | ||
(C) the board determines that the needs to be | ||
addressed by the project will be addressed in a manner that is | ||
consistent with that regional water plan; and | ||
(3) the board finds that the water audit required | ||
under Section 16.0121 has been completed and filed. | ||
SECTION 4. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2015. |