Bill Text: TX HB655 | 2015-2016 | 84th Legislature | Comm Sub
NOTE: There are more recent revisions of this legislation. Read Latest Draft
Bill Title: Relating to the storage and recovery of water in aquifers; authorizing fees and surcharges; adding provisions subject to a criminal penalty.
Spectrum: Moderate Partisan Bill (Republican 6-1)
Status: (Passed) 2015-06-16 - Effective immediately [HB655 Detail]
Download: Texas-2015-HB655-Comm_Sub.html
Bill Title: Relating to the storage and recovery of water in aquifers; authorizing fees and surcharges; adding provisions subject to a criminal penalty.
Spectrum: Moderate Partisan Bill (Republican 6-1)
Status: (Passed) 2015-06-16 - Effective immediately [HB655 Detail]
Download: Texas-2015-HB655-Comm_Sub.html
84R18019 SLB-F | |||
By: Larson, Workman | H.B. No. 655 | ||
Substitute the following for H.B. No. 655: | |||
By: Bonnen of Brazoria | C.S.H.B. No. 655 |
|
||
|
||
relating to the storage and recovery of water in aquifers; | ||
authorizing fees and surcharges; adding provisions subject to a | ||
criminal penalty. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Sections 11.153(a), (b), and (c), Water Code, | ||
are amended to read as follows: | ||
(a) In this section, "aquifer storage and recovery project" | ||
has the meaning assigned by Section 27.151 [ |
||
|
||
|
||
|
||
|
||
|
||
(b) A water right holder or a person who has contracted for | ||
the use of water under a contract that does not prohibit the use of | ||
the water in an aquifer storage and recovery project may undertake | ||
an aquifer storage and recovery project without obtaining any | ||
additional authorization under this chapter for the project. A | ||
person described by this subsection undertaking an aquifer storage | ||
and recovery project must: | ||
(1) obtain any required authorizations under | ||
Subchapter G, Chapter 27, and Subchapter N, Chapter 36; and | ||
(2) comply with the terms of the applicable water | ||
right [ |
||
|
||
|
||
|
||
(c) This section does not preclude the commission from | ||
considering an aquifer storage and recovery project to be a | ||
component of a project permitted under this chapter that is not | ||
required to be based on the continuous availability of historic, | ||
normal stream flow [ |
||
|
||
|
||
|
||
|
||
|
||
SECTION 2. Chapter 27, Water Code, is amended by adding | ||
Subchapter G to read as follows: | ||
SUBCHAPTER G. AQUIFER STORAGE AND RECOVERY PROJECTS | ||
Sec. 27.151. DEFINITIONS. In this subchapter: | ||
(1) "Aquifer storage and recovery project" means a | ||
project involving the injection of water into a geologic formation | ||
for the purpose of subsequent recovery and beneficial use by the | ||
project operator. | ||
(2) "ASR injection well" means a Class V injection | ||
well used for the injection of water into a geologic formation as | ||
part of an aquifer storage and recovery project. | ||
(3) "ASR recovery well" means a well used for the | ||
recovery of water from a geologic formation as part of an aquifer | ||
storage and recovery project. | ||
(4) "Native groundwater" means the groundwater | ||
naturally occurring in a geologic formation. | ||
(5) "Project operator" means a person holding an | ||
authorization under this subchapter to undertake an aquifer storage | ||
and recovery project. | ||
Sec. 27.152. JURISDICTION. The commission has exclusive | ||
jurisdiction over the regulation and permitting of ASR injection | ||
wells. | ||
Sec. 27.153. AUTHORIZATION FOR USE OF CLASS V INJECTION | ||
WELLS. (a) The commission may authorize the use of a Class V | ||
injection well as an ASR injection well: | ||
(1) by rule; | ||
(2) under an individual permit; or | ||
(3) under a general permit. | ||
(b) In adopting a rule or issuing a permit under this | ||
section, the commission shall consider: | ||
(1) whether the injection of water will comply with | ||
the standards set forth under the federal Safe Drinking Water Act | ||
(42 U.S.C. Section 300f et seq.); | ||
(2) the extent to which the cumulative volume of water | ||
injected for storage in the receiving geologic formation can be | ||
successfully recovered from the geologic formation for beneficial | ||
use, taking into account that injected water may be commingled to | ||
some degree with native groundwater; | ||
(3) the effect of the aquifer storage and recovery | ||
project on existing water wells; and | ||
(4) whether the introduction of water into the | ||
receiving geologic formation will alter the physical, chemical, or | ||
biological quality of the native groundwater to a degree that | ||
would: | ||
(A) render the groundwater produced from the | ||
receiving geologic formation harmful or detrimental to people, | ||
animals, vegetation, or property; or | ||
(B) require an unreasonably higher level of | ||
treatment of the groundwater produced from the receiving geologic | ||
formation than is necessary for the native groundwater in order to | ||
render the groundwater suitable for beneficial use. | ||
(c) All wells associated with a single aquifer storage and | ||
recovery project must be located within a continuous perimeter | ||
boundary of one parcel of land, or two or more adjacent parcels of | ||
land under common ownership, lease, joint operating agreement, or | ||
contract. | ||
(d) The commission by rule shall provide for public notice | ||
and comment on a proposed general permit authorized under this | ||
section. The commission shall require an applicant for an | ||
individual permit authorized under this section to provide notice | ||
of the application by first class mail to any groundwater | ||
conservation district in which the wells associated with the | ||
aquifer storage and recovery project will be located and by | ||
publishing notice in a newspaper of general circulation in the | ||
county in which the wells will be located. | ||
Sec. 27.154. TECHNICAL STANDARDS. (a) The commission shall | ||
adopt technical standards governing the approval of the use of a | ||
Class V injection well as an ASR injection well. | ||
(b) This subsection applies only to an aquifer storage and | ||
recovery project proposed to be located in a groundwater | ||
conservation district or other special-purpose district with the | ||
authority to regulate the withdrawal of groundwater. Except as | ||
otherwise provided by this section, the commission shall limit the | ||
volume of water that may be recovered by an aquifer storage and | ||
recovery project to an amount that does not exceed the amount of | ||
water injected under the project. If the commission determines that | ||
the proposed injection of water into a geologic formation will | ||
result in a loss of injected water or native groundwater, the | ||
commission shall impose additional restrictions on the amount of | ||
water that may be recovered to account for the loss. The commission | ||
may not deny a permit based on a determination that a loss described | ||
by this subsection will occur. A limitation imposed under this | ||
subsection may not prohibit the production of native groundwater by | ||
an aquifer storage and recovery project if the production complies | ||
with Subchapter N, Chapter 36. | ||
(c) The commission by rule shall prescribe construction and | ||
completion standards and metering and reporting requirements for | ||
ASR injection wells and ASR recovery wells, including for an ASR | ||
injection well that also serves as an ASR recovery well. | ||
(d) The commission may not adopt or enforce groundwater | ||
quality protection standards for the quality of water injected into | ||
an ASR injection well that are more stringent than applicable | ||
federal standards. | ||
Sec. 27.155. REPORTING OF INJECTION AND RECOVERY VOLUMES. | ||
(a) A project operator shall install a meter on each ASR injection | ||
well and ASR recovery well associated with the aquifer storage and | ||
recovery project. | ||
(b) Each calendar month, the project operator shall provide | ||
to the commission a written or electronic report showing for the | ||
preceding calendar month the volume of water: | ||
(1) injected for storage; and | ||
(2) recovered for beneficial use. | ||
Sec. 27.156. REPORTING OF WATER QUALITY DATA. A project | ||
operator shall: | ||
(1) perform water quality testing annually on water to | ||
be injected into a geologic formation and water recovered from a | ||
geologic formation as part of the aquifer storage and recovery | ||
project; and | ||
(2) provide the results of the testing described by | ||
Subdivision (1) in written or electronic form to the commission. | ||
Sec. 27.157. OTHER LAWS NOT AFFECTED. (a) This subchapter | ||
does not affect the ability to regulate an aquifer storage and | ||
recovery project as authorized under: | ||
(1) Chapter 626, Acts of the 73rd Legislature, Regular | ||
Session, 1993, for the Edwards Aquifer Authority; | ||
(2) Chapter 8801, Special District Local Laws Code, | ||
for the Harris-Galveston Subsidence District; | ||
(3) Chapter 8834, Special District Local Laws Code, | ||
for the Fort Bend Subsidence District; | ||
(4) Chapter 8802, Special District Local Laws Code, | ||
for the Barton Springs-Edwards Aquifer Conservation District; or | ||
(5) Chapter 8811, Special District Local Laws Code, | ||
for the Corpus Christi Aquifer Storage and Recovery Conservation | ||
District. | ||
(b) This subchapter does not affect the authority of the | ||
commission regarding: | ||
(1) recharge projects in certain portions of the | ||
Edwards underground reservoir under Sections 11.023(c) and (d); or | ||
(2) injection wells that transect or terminate in | ||
certain portions of the Edwards Aquifer under Section 27.0516. | ||
SECTION 3. Chapter 36, Water Code, is amended by adding | ||
Subchapter N to read as follows: | ||
SUBCHAPTER N. AQUIFER STORAGE AND RECOVERY PROJECTS | ||
Sec. 36.451. DEFINITIONS. In this subchapter, "aquifer | ||
storage and recovery project," "ASR injection well," "ASR recovery | ||
well," and "project operator" have the meanings assigned by Section | ||
27.151. | ||
Sec. 36.452. APPLICABILITY TO RECOVERY WELLS THAT ALSO | ||
FUNCTION AS INJECTION WELLS. Notwithstanding Section 27.152, this | ||
subchapter applies to an ASR recovery well that also functions as an | ||
ASR injection well. | ||
Sec. 36.453. REGISTRATION AND REPORTING OF WELLS. (a) A | ||
project operator shall: | ||
(1) register the ASR injection wells and ASR recovery | ||
wells associated with the aquifer storage and recovery project with | ||
any district in which the wells are located; | ||
(2) each calendar month by the deadline established by | ||
the commission for reporting to the commission, provide the | ||
district with a copy of the written or electronic report required to | ||
be provided to the commission under Section 27.155; and | ||
(3) annually by the deadline established by the | ||
commission for reporting to the commission, provide the district | ||
with a copy of the written or electronic report required to be | ||
provided to the commission under Section 27.156. | ||
(b) If an aquifer storage and recovery project recovers an | ||
amount of groundwater that exceeds the volume authorized by the | ||
commission to be recovered under the project, the project operator | ||
shall report to the district the volume of groundwater recovered | ||
that exceeds the volume authorized to be recovered in addition to | ||
providing the report required by Subsection (a)(2). | ||
Sec. 36.454. PERMITTING, SPACING, AND PRODUCTION | ||
REQUIREMENTS. (a) Except as provided by Subsection (b), a district | ||
may not require a permit for the drilling, equipping, operation, or | ||
completion of an ASR injection well or an ASR recovery well that is | ||
authorized by the commission. | ||
(b) The ASR recovery wells that are associated with an | ||
aquifer storage and recovery project are subject to the permitting, | ||
spacing, and production requirements of the district if the amount | ||
of groundwater recovered from the wells exceeds the volume | ||
authorized by the commission to be recovered under the project. The | ||
requirements of the district apply only to the portion of the volume | ||
of groundwater recovered from the ASR recovery wells that exceeds | ||
the volume authorized by the commission to be recovered. | ||
(c) A project operator may not recover groundwater by an | ||
aquifer storage and recovery project in an amount that exceeds the | ||
volume authorized by the commission to be recovered under the | ||
project unless the project operator complies with the applicable | ||
requirements of a district as described by this section. | ||
Sec. 36.455. FEES AND SURCHARGES. (a) A district may not | ||
assess a production fee or a transportation or export fee or | ||
surcharge for groundwater recovered from an ASR recovery well, | ||
except to the extent that the amount of groundwater recovered under | ||
the aquifer storage and recovery project exceeds the volume | ||
authorized by the commission to be recovered. | ||
(b) A district may assess a well registration fee or other | ||
administrative fee for an ASR recovery well in the same manner that | ||
the district assesses such a fee for other wells registered with the | ||
district. | ||
Sec. 36.456. DESIRED FUTURE CONDITIONS. A district may | ||
consider hydrogeologic conditions related to the injection and | ||
recovery of groundwater as part of an aquifer storage and recovery | ||
project in the planning for and monitoring of the achievement of a | ||
desired future condition for the aquifer in which the wells | ||
associated with the project are located. | ||
Sec. 36.457. OTHER LAWS NOT AFFECTED. This subchapter does | ||
not affect the ability to regulate groundwater as authorized under: | ||
(1) Chapter 626, Acts of the 73rd Legislature, Regular | ||
Session, 1993, for the Edwards Aquifer Authority; | ||
(2) Chapter 8801, Special District Local Laws Code, | ||
for the Harris-Galveston Subsidence District; | ||
(3) Chapter 8834, Special District Local Laws Code, | ||
for the Fort Bend Subsidence District; | ||
(4) Chapter 8802, Special District Local Laws Code, | ||
for the Barton Springs-Edwards Aquifer Conservation District; or | ||
(5) Chapter 8811, Special District Local Laws Code, | ||
for the Corpus Christi Aquifer Storage and Recovery Conservation | ||
District. | ||
SECTION 4. The following sections of the Water Code are | ||
repealed: | ||
(1) Sections 11.153(d) and (e); | ||
(2) Section 11.154; and | ||
(3) Section 11.155. | ||
SECTION 5. Not later than May 1, 2016, the Texas Commission | ||
on Environmental Quality shall adopt rules to implement Section | ||
11.153, Water Code, as amended by this Act, and Subchapter G, | ||
Chapter 27, Water Code, as added by this Act. | ||
SECTION 6. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||
Act takes effect September 1, 2015. |