Bill Title: Relating to certificates of convenience and necessity for the construction of facilities for the transmission of electricity.
Spectrum: Slight Partisan Bill (Republican 8-5)
Status: (Passed) 2019-05-16 - Effective immediately [SB1938 Detail]
Download: Texas-2019-SB1938-Comm_Sub.html
Bill Title: Relating to certificates of convenience and necessity for the construction of facilities for the transmission of electricity.
Spectrum: Slight Partisan Bill (Republican 8-5)
Status: (Passed) 2019-05-16 - Effective immediately [SB1938 Detail]
Download: Texas-2019-SB1938-Comm_Sub.html
By: Hancock | S.B. No. 1938 | |
(In the Senate - Filed March 7, 2019; March 19, 2019, read | ||
first time and referred to Committee on Business & Commerce; | ||
April 9, 2019, reported adversely, with favorable Committee | ||
Substitute by the following vote: Yeas 9, Nays 0; April 9, 2019, | ||
sent to printer.) | ||
COMMITTEE SUBSTITUTE FOR S.B. No. 1938 | By: Hancock |
|
||
|
||
relating to certificates of convenience and necessity for the | ||
construction of facilities for the transmission of electricity. | ||
BE IT ENACTED BY THE LEGISLATURE OF THE STATE OF TEXAS: | ||
SECTION 1. Section 37.051(a), Utilities Code, is amended to | ||
read as follows: | ||
(a) An electric utility [ |
||
or indirectly provide service to the public under a franchise or | ||
permit unless the utility [ |
||
commission a certificate that states that the public convenience | ||
and necessity requires or will require the installation, operation, | ||
or extension of the service. | ||
SECTION 2. Section 37.053(a), Utilities Code, is amended to | ||
read as follows: | ||
(a) An electric utility [ |
||
obtain or amend a certificate must submit an application to the | ||
commission. | ||
SECTION 3. Section 37.055, Utilities Code, is amended to | ||
read as follows: | ||
Sec. 37.055. REQUEST FOR PRELIMINARY ORDER. (a) An | ||
electric utility [ |
||
privilege under a franchise or permit that the utility [ |
||
|
||
the commission for a preliminary order under this section. | ||
(b) The commission may issue a preliminary order declaring | ||
that the commission, on application and under commission rules, | ||
will grant the requested certificate on terms the commission | ||
designates, after the electric utility [ |
||
the franchise or permit. | ||
(c) The commission shall grant the certificate on | ||
presentation of evidence satisfactory to the commission that the | ||
electric utility [ |
||
permit. | ||
SECTION 4. Section 37.056, Utilities Code, is amended by | ||
adding Subsections (e), (f), (g), (h), and (i) to read as follows: | ||
(e) A certificate to build, own, or operate a new | ||
transmission facility that directly interconnects with an existing | ||
electric utility facility or municipally owned utility facility may | ||
be granted only to the owner of that existing facility. If a new | ||
transmission facility will directly interconnect with facilities | ||
owned by different electric utilities or municipally owned | ||
utilities, each entity shall be certificated to build, own, or | ||
operate the new facility in separate and discrete equal parts | ||
unless they agree otherwise. | ||
(f) Notwithstanding Subsection (e), if a new transmission | ||
line, whether single or double circuit, will create the first | ||
interconnection between a load-serving station and an existing | ||
transmission facility, the entity with a load-serving | ||
responsibility or an electric cooperative that has a member with a | ||
load-serving responsibility at the load-serving station shall be | ||
certificated to build, own, or operate the new transmission line | ||
and the load-serving station. The owner of the existing | ||
transmission facility shall be certificated to build, own, or | ||
operate the station or tap at the existing transmission facility to | ||
provide the interconnection, unless after a reasonable period of | ||
time the owner of the existing transmission facility is unwilling | ||
to build, and then the entity with the load-serving responsibility | ||
or an electric cooperative that has a member with a load-serving | ||
responsibility may be certificated to build the interconnection | ||
facility. | ||
(g) Notwithstanding any other provision of this section, an | ||
electric utility or municipally owned utility that is authorized to | ||
build, own, or operate a new transmission facility under Subsection | ||
(e) or (f) may designate another electric utility that is currently | ||
certificated by the commission within the same electric power | ||
region, coordinating council, independent system operator, or | ||
power pool or a municipally owned utility to build, own, or operate | ||
a portion or all of such new transmission facility, subject to any | ||
requirements adopted by the commission by rule. | ||
(h) The division of any required certification of | ||
facilities described in this section shall apply unless each entity | ||
agrees otherwise. Nothing in this section is intended to require a | ||
certificate for facilities that the commission has determined by | ||
rule do not require certification to build, own, or operate. | ||
(i) Notwithstanding any other provision of this section, an | ||
electric cooperative may be certificated to build, own, or operate | ||
a new facility in place of any other electric cooperative if both | ||
cooperatives agree, subject to any requirements adopted by the | ||
commission by rule. | ||
SECTION 5. Section 37.057, Utilities Code, is amended to | ||
read as follows: | ||
Sec. 37.057. DEADLINE FOR APPLICATION FOR NEW TRANSMISSION | ||
FACILITY. [ |
||
|
||
|
||
deny an application for a certificate for a new transmission | ||
facility not later than the first anniversary of the date the | ||
application is filed. If the commission does not approve or deny | ||
the application on or before that date, a party may seek a writ of | ||
mandamus in a district court of Travis County to compel the | ||
commission to decide on the application. | ||
SECTION 6. Section 37.151, Utilities Code, is amended to | ||
read as follows: | ||
Sec. 37.151. PROVISION OF SERVICE. Except as provided by | ||
Sections [ |
||
certificate holder[ |
||
|
||
(1) serve every consumer in the utility's certificated | ||
area; and | ||
(2) provide continuous and adequate service in that | ||
area. | ||
SECTION 7. Section 37.154(a), Utilities Code, is amended to | ||
read as follows: | ||
(a) An electric utility or municipally owned utility may | ||
sell, assign, or lease a certificate or a right obtained under a | ||
certificate if [ |
||
assignee, or lessee is already certificated by the commission to | ||
provide electric service within the same electric power region, | ||
coordinating council, independent system operator, or power pool, | ||
or if the purchaser, assignee, or lessee is an electric cooperative | ||
or municipally owned utility [ |
||
part of a transaction subject to Sections 39.262(l)-(o) and 39.915, | ||
the commission may approve a sale, assignment, or lease to an entity | ||
that has not been previously certificated if the approval will not | ||
diminish the retail rate jurisdiction of this state. Any purchase, | ||
assignment, or lease under this section requires that the | ||
commission determine that the purchaser, assignee, or lessee can | ||
provide adequate service. | ||
SECTION 8. Sections 37.051(d), (e), and (f), Utilities | ||
Code, are repealed. | ||
SECTION 9. This Act takes effect immediately if it receives | ||
a vote of two-thirds of all the members elected to each house, as | ||
provided by Section 39, Article III, Texas Constitution. If this | ||
Act does not receive the vote necessary for immediate effect, this | ||